Impact of smart energy on a three-echelon closed-loop supply chain management with reduction of carbon emissions Authors: Nilkamal Bar, Isha Sangal, Biswajit Sarkar Published: 2025 ABSTRACT The effective management of energy consumption and the reduction of emissions are crucial to sustainable supply chain management. Sustainability can be approached in a new way through smart energy. Smart energy combines traditional and renewable energy sources through a smart system that is more efficient than conventional energy for sustainability. The model creates a closed-loop supply chain management for tires production to find the efficiency of smart energy utilization and the remanufacturing of end-of-life tires to achieve the sustainability goal. The model determines the policy for using smart energy by finding the ratio of renewable to traditional energy. The players include a manufacturer, multiple retailers, and third-party logistics that consume energy for production and management. The manufacturer follows a manufacturing-remanufacturing strategy to produce new and remanufactured tires and supplies those tires to all retailers by following an optimal delivery schedule. The formulated profit function of the developed model is a mixed-integer nonlinear function. A classical optimization method is used to solve the model. The most important finding is that using 42% smart energy increases total profit by 12.71% and pulls down emissions by 41.98%. A mixed production strategy with variable remanufacturing earns 13.91% more profit. Introduction Developing a sustainable closed-loop supply chain management (CLSCM) that incorporates economic and environmental considerations is a complex and demanding task that requires a multidisciplinary approach. The fundamental aim of such a supply chain (SC) is to reduce ecological effect and maintain economic sustainability1,2. Therefore, the present study develops a CLSCM for tires to reduce ecological impacts through remanufacturing end-of-life (EOL) tires, as 1 billion waste tires are generated worldwide each year3. In 2023, Ahmed et al.4 reported that about 3 billion new tires were produced globally. In the tire manufacturing industry, energy is a basic need for tire production. Generally, manufacturing industries use energy for production, lighting, and other management services and consume most of the global energy use, which is expected to grow by 1.5% per year [Industrial Energy Consumption, Global Markets. https://www.sciencedirect.com/topics/engineering/industrial-energy-consumption, 2014 (accessed 30th April 2024)]. However, the energy demand is increasing along with the increasing production of tires. Though the energy audit method can minimize consumption by quantifying energy use and waste in a plant, the main concerns about energy sources are non-renewable5. It is well known that the price of a product increases with demand when there is a finite stock. This fact is similar to that of non-renewable energy (NRNE), as the supply of traditional energy sources is finite. Since energy costs are among the leading costs in the tire manufacturing industry, an increase in unit energy costs lowers the profit of the closed-loop tire supply chain management (CTSCM). Rather than economic aspects, non-renewable energy adversely impacts the environment. Energy usage (electricity and heat) by manufacturing companies globally contributes to 24.2% of global emissions6. Emissions from energy use can be lowered using renewable energy sources rather than NRNE. The International Renewable Energy Agency (IRENA) estimates that about 29% of global electricity is generated from renewable energy sources. Therefore, it is impossible to supply cent percent renewable energy to the tire industry in the present scenario.Fig. 1Graphical presentation for the study consisting of manufacturer, retailer, and third-party logistics. Graphical presentation for the study consisting of manufacturer, retailer, and third-party logistics. Smart energy will be a proper substitute for NRNE. In the electricity field, according to Lund et al.7, a smart electricity grid should be considered part of a smart energy system. Smart grid (SG) is a new era of traditional power grid that employs many devices such as computers, sensors, various forms of communication technology, and data analysis techniques to connect consumers and suppliers via bidirectional communication while improving system efficiency, reliability, security, flexibility, and safety8. The smart grid integrates renewable and NRNE energy sources to meet the CTSCM’s energy demand. The combined energy supplied through a smart electricity grid is known as smart energy. A smart meter, a component of a smart energy system, provides real-time data on the amount of renewable and NRNE energy consumption. Smart energy is cost-effective and reliable, and it could decarbonize extensively, reducing emissions from the use of renewable energy. The primary purpose of the research is to make the CTSCM sustainable by making it economically viable, reducing emissions, and conserving resources through remanufacturing and renewable sources. Smart energy use by the CTSCM players is depicted in Fig. 1. Another concern is about the EOL tire. As the demand for new tires increases, so does the quantity and range of EOL tires. According to Formela3, about 1 billion scrap tires are generated globally per year, and this could reach 1.2 billion by 2030. In particular, in India, about 1.5 million tons of used tires are generated each year, of which only 0.45 million tons are recycled. Unfortunately, these EOL tires are disposed of in the environment without proper treatment, threatening the environment and human health. Thus, one of the most challenging tasks is properly reusing or recovering end-of-life tires. Among different recovery options for EOL tires, such as reuse, recycling, and remanufacturing, remanufacturing is most popular for its quality and price. The price of a remanufactured tire is almost 40%-50% of a brand-new tire, with quality comparable to a new one, which is both economically and socially beneficial9. Remanufacturing waste tires with an investment in the improvement of the finished item’s characteristics is a process of implementing corporate social responsibility (CSR), which increases demand and maintains a good company image10. Thus, CLSCM for tires supports social and environmental development, as well as economic development. In this study, the potential impact of smart energy on a three-echelon CLSCM is examined, with a specific focus on reducing carbon emissions. In addition to the smart energy policy used, the pricing policy for new and remanufactured tires has a crucial effect on the demand for final goods. The study uses a price-dependent quadratic demand model to examine the impact of price on demand, holding the selling price constant across new and remanufactured tires. Contributions to the CLSCM for tire The following contributions are included to the study to fulfil the research gaps. Table 1 provides a quick look to the novel contribution. Smart energy is both economically advantageous and environmentally friendly. The proposed study gives a deep insight into the smart energy policy, which will be both financially and environmentally viable for the CTSCM.The demand for tires, a non-linear price function, is variable. The demand is satisfied with new and remanufactured tires. Which scenario is best in this situation: variable production and fixed remanufacturing, or variable production and variable remanufacturing? The present model finds the best one under variable demand and energy policy.The CTSCM model includes a carbon tax to reduce transportation-related emissions. The volume of the remanufactured products depends on the volume of returned tires. The increase in remanufacturing volume implies an increase in the number of transportation trips and, consequently, emissions. The study examines the relationship between carbon emissions and remanufacturing. Smart energy is both economically advantageous and environmentally friendly. The proposed study gives a deep insight into the smart energy policy, which will be both financially and environmentally viable for the CTSCM. Smart energy is both economically advantageous and environmentally friendly. The proposed study gives a deep insight into the smart energy policy, which will be both financially and environmentally viable for the CTSCM. The demand for tires, a non-linear price function, is variable. The demand is satisfied with new and remanufactured tires. Which scenario is best in this situation: variable production and fixed remanufacturing, or variable production and variable remanufacturing? The present model finds the best one under variable demand and energy policy. The demand for tires, a non-linear price function, is variable. The demand is satisfied with new and remanufactured tires. Which scenario is best in this situation: variable production and fixed remanufacturing, or variable production and variable remanufacturing? The present model finds the best one under variable demand and energy policy. The CTSCM model includes a carbon tax to reduce transportation-related emissions. The volume of the remanufactured products depends on the volume of returned tires. The increase in remanufacturing volume implies an increase in the number of transportation trips and, consequently, emissions. The study examines the relationship between carbon emissions and remanufacturing. The CTSCM model includes a carbon tax to reduce transportation-related emissions. The volume of the remanufactured products depends on the volume of returned tires. The increase in remanufacturing volume implies an increase in the number of transportation trips and, consequently, emissions. The study examines the relationship between carbon emissions and remanufacturing. Orientation of the paper The proposed model contains a literature survey in Literature review section. Problem definition, notation, and assumptions section describes the study’s problem, the essential assumptions for formulating the model, and the notation for parameters and decision variables. The mathematical model is formulated by describing different costs for each player in the supply chain management (SCM) in Mathematical expression of the model section. Following this, Solution methodology section represents the solution methodology of the problem, and Numerical experiment section is formulated to clarify some numerical examples. Discussions section discusses the results and compares them with the existing study. In Sensitivity analysis section, a sensitivity analysis of crucial parameters is presented, while in Managerial insights section, recommendations are given to the manager. Finally, conclusions to the related study and future model extension are included in Conclusions section. Literature review This part of the model recite a patulous survey on literature to find out significant contribution in the field and explores the research gap for the devolvement of environment and economy in the mentioned CLSCM. Energy usage within an SCM In SCM, the motive for energy use is two-fold: the first is production, storage, and building management, and the second is inventory movement from one echelon to another. With the Industrial Revolution, energy demand in manufacturing industries has increased. Iqbal et al.11 investigated a three-layer (primary, secondary, and closed-loop supply chain) green supply chain management (GSCM) for packaging food products. They designed their GSCM model to minimize waste and energy usage during production. They proposed in their study that energy usage might be reduced by optimizing the manufacturing cycle. As with the manufacturing cycle, the manufacturing rate is crucial to energy consumption. A serial production line model was studies by Cui et al.12 to reduce energy consumption during production. They suggested an N-policy-based constrained model of the energy-efficient control (CMEC) technique to reduce energy usage while preserving the required production rate. However, a production system can not always be perfect. When a machine fails, a significant amount of energy is lost due to frequent reboots of the production process. In this direction, Sarkar et al.5 proposed a sustainable smart production model for biofuel under a flexible manufacturing system. They aimed to produce pure biofuel that consumed less energy and to maximize total profit through a dual-channel selling strategy. They suggested energy consumption may be minimized by controlling the production rate of the flexible production system. All the above authors have discussed how to reduce energy consumption. However, the current situation demands that renewable energy be deployed as much as possible in place of NRNE. In such a situation, Nadel and Geller13 introduced the concept of smart energy policies, in which they studied energy problems to reduce pollution by promoting a clean, efficient combined heat and power system. The main goal of smart energy Lund et al.7 showed how flexible CHP production improves energy efficiency and why a smart electricity grid is included in smart energy systems for electricity balancing problems. A power SC network was designed by Tsao and Vu14 with two players: one supplier and consumers, with the help of a smart grid. End consumers participate in generating renewable energy in their model. They used pricing and a buy-back mechanism, allowing clients to sell or purchase energy as needed. This approach helps to lessen reliance on NRNE. Calise et al.15 developed a smart energy system for residential buildings, defining smart energy as the combination of heat and power generated from solar photovoltaic and electric sources. They minimized the environmental effects of their study. Thomas and Mishra16 addressed a green energy SCM to fix the problem of energy demand. In their paper, they introduced the concept of a smart grid and explored how it integrates renewable energy with the NRNE power supply. Dai et al.17 detailed how the smart grid incorporates green technologies and environmental factors in his proposal. Finally, they emphasized the importance of internet of things (IoT) in smart grids or smart energy systems. The research trend on smart energy and sustainable SCM is given in Fig. 2a. However, in the above discussion on smart energy and SCM, it is found that researchers either form an energy SC using a smart grid that integrates renewable energy and NRNE or apply smart energy to formulate a smart city. According to Cui et al.12, the manufacturing sector consumes around 42% of global energy consumption. Therefore, there is a research gap regarding how industries can utilize smart energy to lower energy consumption costs and emissions for production and inventory management within an SC. As per the authors’ knowledge, this is the first study to formulate a CLSCM for tires to enable SCM players to effectively use smart energy in production and inventory management to optimize total profit and minimize emissions. The next section provides a detailed survey of carbon emissions from energy consumption and transportation. Carbon emissions for energy consumption and transportation The Environmental Protection Agency (EPA) of the United States identified that transportation and energy usage (industrial and electrical) account for the majority of emissions (Fig. 2b).Fig. 2The graphical representation displays the keyword based literature and emissions from different sectors. The graphical representation displays the keyword based literature and emissions from different sectors. Rahman et al.18 analyzed the impact of household consumption-based emissions on sustainable development goals in SAARC nations, indicating that increases in carbon footprints pose risks to economic and environmental development. They suggested that mitigating emissions not only supports ecological development but also sustains economic growth. An economic production quantity (EPQ) model was created by Ruidas et al.19 in response to various carbon policies to reduce emissions due to production, rework, and inventory management. They used the particle swarm optimization approach to solve their problem and verified the model under different carbon policies to find the most effective policy for emissions reduction. However, they did not consider emissions for energy consumption and transportation purposes. A review article on the dairy SC was presented by Malliaroudaki et al.20 for net zero emission by energy management. They highlighted that energy consumption is responsible for a greater share of emissions in the dairy industry. Using alternative energy sources may help achieve the net-zero carbon goal. A two-echelon SCM was proposed by Marchi et al.21 within a flexible production system to minimize carbon emissions from energy use and other purposes. They recommended a vendor-managed inventory (VMI) strategy under consignment stock to minimize energy consumption and reduce emissions by reducing machine failures and faulty products. Tian et al.22 formulated an aluminium SC for the reduction of environmental impact by lowering energy consumption in the aluminium industry. They analyzed four scenarios and discovered that energy consumption and emissions will be significantly reduced by 2030 under the business-as-usual (BAU) scenario. Mashud et al.23 developed a sustainable warehousing model to find a balance among reduction in ordering cost, deterioration, and emissions reduction. They maximized total profit by minimizing emissions from lighting, heating, air conditioning, and product deterioration under the carbon tax policy. In another study, Mashud et al.24 developed an inventory model to minimize transportation-related emissions. They considered fixed and variable transportation emissions, with variable emissions depending on fuel consumption. De and Giri25 constructed a multi-echelon CLSCM to reduce environmental impact due to transportation under heterogeneous vehicle presence. They identified the conflict between transportation costs and emissions costs and provided insight into how proper scheduling of goods transport effectively reduces emissions. Sarkar et al.26 developed a sustainable production-inventory model for a faulty production system that considers emissions from production operations. They used green investment to reduce emissions. An automated production system was discussed for production with a flexible production system by Sarkar et al.27. They minimized total cost of the production system but without consideration of SCM. Ullah28 defined a CLSCM under a manufacturing-remanufacturing scheme with the effect of carbon emissions from transportation. They used fixed and variable carbon emissions from transportation and implemented a carbon tax to reduce emissions. Yadav et al.29 developed research by considering both fixed and variable emissions from transportation in the forward and reverse flow of goods. The fixed emissions are proportional to the fuel consumed while an empty truck moves. Variable emissions are proportional to the fuel consumed while the truck is loaded. It is variable because demand and return are variable. Hasan et al.30 developed an inventory model to minimize emissions from the retail store under an optimum investment for green technology. They investigated their model under carbon tax, cap-and-trade, and carbon offset policies and found that the carbon cap-and-trade policy efficiently reduces emissions. Zhang et al.31 investigated a smart production system (SPS) for renewable energy use and tracking technology to provide real-time information about goods. They found that efficient renewable energy use can reduce significant costs and emissions associated with the system’s energy use. Edalatpour et al.32 investigated a global sustainable SCM (GSSCM), introducing International Commercial Terms and international transportation modes, which filled the gaps with sustainability criteria in GSSCM. They considered a carbon tax policy to effectively reduce emissions and introduced waste product recycling to lessen environmental degradation. In other study, Edalatpour et al.33 evaluated an integrated model that harmonizes project management and SC decisions to optimize profit and environmental performance in sustainable construction. They conducted a case study and explained how coordination and procurement strategies reduce emissions and resource waste, thereby improving decision-making. The research trend on carbon emissions, energy consumption, and transportation is given in Fig. 2c. However, there is no single research article that was formulated to reduce emissions from energy consumption for production, management, and transportation simultaneously in a three-echelon CLSCM. The proposed study is formulated to find how to reduce emissions for energy consumption and transportation in a three-echelon CLSCM context. Another benefit of a CLSCM is that it reduces waste by remanufacturing EOL tires. The following section describes the literature on the efficacy of remanufacturing in a flexible production and remanufacturing-based CLSCM. Sustainability of a manufacturing and remanufacturing enabled CLSCM An SCM describes the coordination among the SCM players linked by inventory and monetary flow. An SCM can be classified by the number of participants, such as two-, three-, or multi-echelon SCM. In a forward SC, final products are sold to the market through one or more players that follow the take-make-dispose policy. Here is the importance of closing the loop by introducing a reverse flow of EOL products for remanufacturing/reuse/recycling purposes, which reduces environmental issues34. A CLSCM helps the system toward sustainability by integrating economic, ecological, and social problems through remanufacturing, the use of renewable sources, and the creation of jobs for society35. A collaborative research article by Yang et al.36 discussed a CLSCM model in the presence of multiple retailers and a manufacturer. They evaluated the consequences of deterioration and price-dependent demand for electronic devices such as mobile phones and IC chips. Environmental concerns were addressed by Subulan et al.37 through the creation of a tire CLSC network that offers multiple recovery opportunities. They solved their model using fuzzy goal programming to address the uncertainties in manufacturing and remanufacturing tires. Taleizadeh et al.38 defined a three-tier SCM with two scenarios: single-channel forward SCM and dual forward and return channels. They employed a game-theoretic technique to solve their model, which included a specific return rate and an old-fashioned production framework. A multi-tier reverse SC model was proposed by Edalatpour et al.39 for waste management. They considered a stochastic collection rate for dry and wet waste from different collection centers, and, after separation of waste depending on its condition, they considered recycling, remanufacturing, and disposal or landfilling. They maximize the profit from reverse SCM by minimizing waste, thereby enhancing environmental sustainability. Singhal et al.40 described remanufacturing as a critical way to achieve sustainability for electrical and electronics SCM. They described 15 essential factors and their interrelationships to implement remanufacturing successively in the Indian context using Interpretive Structural Modelling. A multi-objective mixed-integer non-liner programming (MINLP) was formulated by Abdolazimi et al.41 to minimize environmental impacts and total costs, and to maximize on-time delivery of goods. They applied their problem to the tire manufacturing industry. A systematic literature review by Akram et al.42 examined sustainability issues in a food manufacturing SC. They highlighted that IoT and blockchain effectively enhance sustainability in food manufacturing SCM. Soleimani et al.43 developed a sustainable CLSCM that minimizes energy consumption by the players involved in the CLSCM. They addressed economic sustainability by maximizing total profit, environmental sustainability by reducing emissions and energy consumption, and social sustainability by creating jobs for society. However, they did not consider emissions from energy consumption and did not address the energy types used by the SCM players. Furthermore, considering fixed demand throughout the SCM limits the model. Several researchers researched tires recovery possibilities, such as Fard et al.44 defined their model under uncertainty and solved it using genetic algorithm (GA), and Ahmed et al.4 defined their model to identify the importance of the supplier and solved it using the \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\epsilon$$\end{document}-constraint approach. Researchers introduced remanufacturing/recycling to reduce environmental sustainability. However, no study explained the sustainable issues under the consideration of flexible manufacturing-remanufacturing in a CLSCM context. The research trend on manufacturing, remanufacturing, CLSCM, and sustainability is given in Fig. 2d. However, as far as the authors know, no research article on tire manufacturing considers variable production and remanufacturing systems, which contributes to the literature on the efficiency of smart energy utilization in a CLSCM both economically and environmentally.Table 1Presenting the comparison with previous literature.Author(s)ScopeEnergy typeEmissionsProduction typeDemandProductEnergyTrans.Manufac.Remanu.Fard et al.44CLSCMNCNCNCFixedUncertainUncertainTireMahapatra et al.45Inventory modelNCNCNCNCNCFixedNCTayyab and Sarkar46SCMTraditionalNC\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}FixedNCFixedNCPal et al.47GSCMNCNCNCNCNCLinearNCSana48GSCMNCNCNCFixedNCLinearNCGarai and Sarkar49CLSCMNCNCNCNCNCFixedHerbal medicinesand biofuelHasanov et al.50CLSCMTraditional\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}FixedFixedFixedNCSarkar et al.51SPMTraditional\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}NCVariableFixedFixedEVShekarian et al.52CLSCMNCNC\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}FixedVariableLinearNCGuchhait and Sarkar53SCMNCNC\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}VariableNCLinearNCWei et al.54SCMRenewable\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}NCFixedNCLinearElectricityThis modelCLSCMSmart energy\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}VariableVariableNon-linearTireTrans.- transportation, Manufac.- manufacturing, Remanu.- remanufacturing, NC- not considered, SCM- supply chain management, GSCM- green SCM, CLSCM- closed-loop SCM, SPM- sustainable production model, EV- electric vehicle. Table 1Presenting the comparison with previous literature.Author(s)ScopeEnergy typeEmissionsProduction typeDemandProductEnergyTrans.Manufac.Remanu.Fard et al.44CLSCMNCNCNCFixedUncertainUncertainTireMahapatra et al.45Inventory modelNCNCNCNCNCFixedNCTayyab and Sarkar46SCMTraditionalNC\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}FixedNCFixedNCPal et al.47GSCMNCNCNCNCNCLinearNCSana48GSCMNCNCNCFixedNCLinearNCGarai and Sarkar49CLSCMNCNCNCNCNCFixedHerbal medicinesand biofuelHasanov et al.50CLSCMTraditional\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}FixedFixedFixedNCSarkar et al.51SPMTraditional\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}NCVariableFixedFixedEVShekarian et al.52CLSCMNCNC\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}FixedVariableLinearNCGuchhait and Sarkar53SCMNCNC\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}VariableNCLinearNCWei et al.54SCMRenewable\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}NCFixedNCLinearElectricityThis modelCLSCMSmart energy\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\surd$$\end{document}VariableVariableNon-linearTireTrans.- transportation, Manufac.- manufacturing, Remanu.- remanufacturing, NC- not considered, SCM- supply chain management, GSCM- green SCM, CLSCM- closed-loop SCM, SPM- sustainable production model, EV- electric vehicle. Presenting the comparison with previous literature. Trans.- transportation, Manufac.- manufacturing, Remanu.- remanufacturing, NC- not considered, SCM- supply chain management, GSCM- green SCM, CLSCM- closed-loop SCM, SPM- sustainable production model, EV- electric vehicle. From the above discussion of the literature and Table 1, one can observe changes in research concepts with the inventions. Several researchers have introduced renewable energy concepts into SCM to reduce dependence on NRNE energy. Manufacturing-remanufacturing-based hybrid models are introduced in the literature for socio-economic benefits. However, most models were optimized under fixed production and remanufacturing rates and fixed demand rates55. Several studies have examined emissions issues in production and transportation to reduce environmental degradation. The study considered a three-echelon SCM for tires by evaluating the effectiveness of smart energy use in production, lighting, air handling, and management for reducing emissions, enhancing profitability, and reducing dependency on NRNE sources. The study is modified to incorporate a non-linear demand function for the selling price and a variable production system that considers remanufacturing returned EOL tires to address research gaps. It established a relation between carbon emissions and remanufacturing strategy. The following Section contains a brief definition of the problem, the parameters used to formulate the model, and the hypotheses to validate the model. Problem definition, notation, and assumptions This section briefly presents the problem formulation, the notation defined to establish the model, the essential assumptions developed to validate the model, the mathematical formulation of each player, and the solution methodology and algorithm. Problem definition An outline of the present study is depicted in Fig. 3. The figure illustrates that all CTSCM players use smart energy to make SCM sustainable, reducing environmental impact and enhancing profits. The CTSCM is established with the presence of a manufacturer, a third-party logistics (3PL), and multiple retailers. All players use \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% smart energy, meaning they consume \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% renewable energy and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1-\alpha )$$\end{document}% traditional energy. Renewable energy sources, like solar energy, emit zero carbon and are inexpensive. Therefore, the smart energy policies adopted by the players abate emissions and reduce energy-related costs. The manufacturer needs energy to run the hybrid production system, the building management system (BMS), lighting, and common services (CMS), whereas 3PLs and retailers consume energy for lighting and air-handling for inventory management. With the use of the smart energy policy, the manufacturer follows a flexible manufacturing-remanufacturing strategy to reduce waste in the form of EOL tires. The manufacturer sends new and remanufactured tires to all retailers according to their demand. The manufacturer follows an ordering schedule determined by the retailer’s lead time and demand. On the other hand, 3PL collects EOL tires from end customers by paying a per-unit fee. The collection volume may not be the same every time. Therefore, the collection rate of EOL tires is considered a variable. The 3PL provides all transportation for the forward and reverse SC, as well as containers, to the manufacturer for shipping tires to retailers. The 3PL is divided into two segments to address limitations in capacity. One (3PL-I) collects and recycles EOL tires; the second (3PL-II) maintains containers and stores recycled tires received from 3PL-I and sent to the manufacturing plant. Finally, all retailers sell tires in the market at a flexible price. This model analyzes price-dependent quadratic demand. The transportation sector is one of the most liable sectors for emissions. The SC is closed, and the volume of transportation is high; therefore, emissions are high, too. The model takes into account both fixed and variable transportation and related emissions. The carbon tax strategy is applied to reduce transportation emissions. The study is developed for bus and truck tires. The flow of products is demonstrated in Fig. 3.Fig. 3System description of the CLSCM including 3PL. System description of the CLSCM including 3PL. Notation Table 2 presents some notation which are used to described the paper.Table 2Description of decision variables and parameters used to formulate the model.IndicesiStands for retailer (i = 1, 2, 3, ..., n)xStands for 3PL (x = 1, 2)Decisionvariables\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\beta }$$\end{document}Collection rate of used tire by 3PL-I \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$0<\beta <1$$\end{document} (%)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\rho _m}$$\end{document}Final goods are produced at this rate (units/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\sigma }$$\end{document}Capacity of single truck (units) (integer)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${S_{p_i}}$$\end{document}Per unit selling price of new tire set by the ith retailer ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\tau }$$\end{document}Cycle time for replenishment (month)TShipment scheduling (dependent variable)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${C_i}$$\end{document}Number of container required for delivery to the ith retailer (unit) (dependent variable)Parameterof retailer\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${r_{ri}}$$\end{document}Demand rate of final products at the ith retailer, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$d=\sum _{i=1}^{n}r_{ri}$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${H_i}$$\end{document}Retailer’s cost for holding unit final products ($/unit/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^r_{j(hp)}}$$\end{document}Total energy consumption due to the use of fan (horsepower/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j^i}$$\end{document}Number of hours that retailer i use fans and lights (j = 1, 2)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${G_i}$$\end{document}Retailer’s ordering cost ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^r_{j(\frac{w}{bulb})}}$$\end{document}Energy consumed by single bulb (watt/bulb)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${L_i}$$\end{document}Lead time of the ith retailer (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P_i}$$\end{document}Order quantity of the ith retailer (unit)Parameterof manufacturer\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${B_m}$$\end{document}Cost for manufacturer in each setup ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j}$$\end{document}Number of hours in a day manufacturer runs machine, fans, and lights (j = 3,4,5)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${H_m, H_{m'}}$$\end{document}Holding cost of the manufacturer for holding final and collected products ($/unit/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${G_m}$$\end{document}Ordering cost of the manufacturer ($/order)qLot size of the manufacturer (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$q=\sum _{i=1}^n P_i$$\end{document}) (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${M^m_{j(hp)}}$$\end{document}Energy consumed by machine per hour (horsepower/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${F^m_{j(ca)}}$$\end{document}Total number of bulb used (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^m_{j(\frac{w}{bulb})}}$$\end{document}Energy consumed owing to single light (watt/bulb)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${B_{MS}}$$\end{document}Average energy consumed for building management (kwh/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${b_2}$$\end{document}Tool/die cost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${E_{CS}}$$\end{document}Average energy consumed for common services (kwh/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${b_1}$$\end{document}Development cost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_r}$$\end{document}Remanufacturing cost of single product ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_3}$$\end{document}Incentive paid to 3PL-II for per unit used tire ($/unit)QProduct quality of the collected product (%)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${b_0}$$\end{document}Raw material cost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_Q}$$\end{document}Cost invest to improve product quality for a single product ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${Q_r}$$\end{document}Minimum product quality acceptable (%)GCost paid per unit product for goodwill lost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\delta _{im}}$$\end{document}Distance between manufacturer and ith retailer (km)Parameterof 3PL\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${B_{3x}}$$\end{document}Setup cost of 3PL-x ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${H_{3x}}$$\end{document}Holding cost of 3PL-x for EOL tire ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j}$$\end{document}Number of hours in a day that 3PL-I runs fan and light (j = 6,7)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j}$$\end{document}Number of hours in a day that 3PL-II runs fan and light (j = 8,9)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\sum _{j=1}^{\Omega }B^m_{j(ca)}}$$\end{document}Total number of bulb used (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{v}}$$\end{document}Variable cost for carbon emissions in forward SC ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${F_2, F_3}$$\end{document}Number of fan used by 3PL (unit)aScaling parameter for collection of 3PL-I\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^m_{j(\frac{w}{bulb})}}$$\end{document}Energy used by single bulb (watt/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{f}}$$\end{document}Fixed cost for carbon emissions in forward SC ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{fr}}$$\end{document}Carbon emissions price (fixed) in reverse SC ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{vr}}$$\end{document}Variable emissions price in reverse SC ($/unit)pContainer management cost ($/container)tScaling factor regarding container capacity\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${h_c}$$\end{document}3PL-II’s holding cost for container($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_1}$$\end{document}Collection cost per unit tire paid to customer by 3PL-I ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${F_T}$$\end{document}Fixed cost for transportation of 3PL-I ($/shipment)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${V_T}$$\end{document}Variable cost for transportation of 3PL-I ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\delta _{ik}}$$\end{document}Distance between 3PL-II and ith retailer (km)OtherParameters\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${ec_1}$$\end{document}Cost of renewable energy ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\alpha }$$\end{document}Percent of smart energy used \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(0<\alpha <1)$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${C_E}$$\end{document}Carbon emitted for per unit traditional power (ton/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${ec_2}$$\end{document}Cost of traditional energy ($/unit) Table 2Description of decision variables and parameters used to formulate the model.IndicesiStands for retailer (i = 1, 2, 3, ..., n)xStands for 3PL (x = 1, 2)Decisionvariables\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\beta }$$\end{document}Collection rate of used tire by 3PL-I \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$0<\beta <1$$\end{document} (%)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\rho _m}$$\end{document}Final goods are produced at this rate (units/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\sigma }$$\end{document}Capacity of single truck (units) (integer)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${S_{p_i}}$$\end{document}Per unit selling price of new tire set by the ith retailer ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\tau }$$\end{document}Cycle time for replenishment (month)TShipment scheduling (dependent variable)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${C_i}$$\end{document}Number of container required for delivery to the ith retailer (unit) (dependent variable)Parameterof retailer\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${r_{ri}}$$\end{document}Demand rate of final products at the ith retailer, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$d=\sum _{i=1}^{n}r_{ri}$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${H_i}$$\end{document}Retailer’s cost for holding unit final products ($/unit/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^r_{j(hp)}}$$\end{document}Total energy consumption due to the use of fan (horsepower/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j^i}$$\end{document}Number of hours that retailer i use fans and lights (j = 1, 2)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${G_i}$$\end{document}Retailer’s ordering cost ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^r_{j(\frac{w}{bulb})}}$$\end{document}Energy consumed by single bulb (watt/bulb)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${L_i}$$\end{document}Lead time of the ith retailer (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P_i}$$\end{document}Order quantity of the ith retailer (unit)Parameterof manufacturer\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${B_m}$$\end{document}Cost for manufacturer in each setup ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j}$$\end{document}Number of hours in a day manufacturer runs machine, fans, and lights (j = 3,4,5)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${H_m, H_{m'}}$$\end{document}Holding cost of the manufacturer for holding final and collected products ($/unit/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${G_m}$$\end{document}Ordering cost of the manufacturer ($/order)qLot size of the manufacturer (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$q=\sum _{i=1}^n P_i$$\end{document}) (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${M^m_{j(hp)}}$$\end{document}Energy consumed by machine per hour (horsepower/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${F^m_{j(ca)}}$$\end{document}Total number of bulb used (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^m_{j(\frac{w}{bulb})}}$$\end{document}Energy consumed owing to single light (watt/bulb)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${B_{MS}}$$\end{document}Average energy consumed for building management (kwh/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${b_2}$$\end{document}Tool/die cost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${E_{CS}}$$\end{document}Average energy consumed for common services (kwh/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${b_1}$$\end{document}Development cost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_r}$$\end{document}Remanufacturing cost of single product ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_3}$$\end{document}Incentive paid to 3PL-II for per unit used tire ($/unit)QProduct quality of the collected product (%)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${b_0}$$\end{document}Raw material cost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_Q}$$\end{document}Cost invest to improve product quality for a single product ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${Q_r}$$\end{document}Minimum product quality acceptable (%)GCost paid per unit product for goodwill lost ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\delta _{im}}$$\end{document}Distance between manufacturer and ith retailer (km)Parameterof 3PL\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${B_{3x}}$$\end{document}Setup cost of 3PL-x ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${H_{3x}}$$\end{document}Holding cost of 3PL-x for EOL tire ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j}$$\end{document}Number of hours in a day that 3PL-I runs fan and light (j = 6,7)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\zeta _j}$$\end{document}Number of hours in a day that 3PL-II runs fan and light (j = 8,9)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\sum _{j=1}^{\Omega }B^m_{j(ca)}}$$\end{document}Total number of bulb used (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{v}}$$\end{document}Variable cost for carbon emissions in forward SC ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${F_2, F_3}$$\end{document}Number of fan used by 3PL (unit)aScaling parameter for collection of 3PL-I\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${P^m_{j(\frac{w}{bulb})}}$$\end{document}Energy used by single bulb (watt/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{f}}$$\end{document}Fixed cost for carbon emissions in forward SC ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{fr}}$$\end{document}Carbon emissions price (fixed) in reverse SC ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${D_{vr}}$$\end{document}Variable emissions price in reverse SC ($/unit)pContainer management cost ($/container)tScaling factor regarding container capacity\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${h_c}$$\end{document}3PL-II’s holding cost for container($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${c_1}$$\end{document}Collection cost per unit tire paid to customer by 3PL-I ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${F_T}$$\end{document}Fixed cost for transportation of 3PL-I ($/shipment)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${V_T}$$\end{document}Variable cost for transportation of 3PL-I ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\delta _{ik}}$$\end{document}Distance between 3PL-II and ith retailer (km)OtherParameters\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${ec_1}$$\end{document}Cost of renewable energy ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${\alpha }$$\end{document}Percent of smart energy used \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(0<\alpha <1)$$\end{document}\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${C_E}$$\end{document}Carbon emitted for per unit traditional power (ton/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$${ec_2}$$\end{document}Cost of traditional energy ($/unit) Description of decision variables and parameters used to formulate the model. Assumptions It is required to develop some assumptions for the simplification of the proposed model. Those assumptions are as follows: A three-echelon CLSCM for tires is found with a manufacturer, a 3PL, and multiple retailers. In an SCM, electricity is a basic need for distinct players with different purposes. In particular, the study finds that the manufacturer needs energy for the production of final products, building management services, common services, and lighting purposes. In the case of 3PLs and retailers, the study finds the energy used for air handling and lighting56.The study found that smart energy systems provide a combination of renewable and conventional energy, which is both economically and environmentally beneficial. The study established that all players involved in the SCM consume \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% of smart energy, i.e., \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% renewable energy and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1-\alpha )$$\end{document}% traditional energy. Emissions from renewable energy are negligible and are considered zero for the study.The manufacturer produces new tires under flexible production systems at a variable production rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m$$\end{document} units per unit of time. The price to make a unit product is found to be a function of the production rate, which depends on the development and tool/die costs required to run a successful production system. The price for making a unit product is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right)$$\end{document}, where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document} is per unit raw material cost, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document} is development cost, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document} is tool/die cost57. Moreover, the manufacturer remanufactures collected EOL tires at a fixed per-unit price, and the remanufacturing rate is assumed to equal the collection rate of EOL tires58.In reality, more than one retailer sells the same products at different prices across different geographic regions. The study found that there are n retailers that sell the same tire at different prices independently. Price is one of the most crucial factors affecting product demand. In the literature, researchers found that demand changes inversely with price changes, i.e., with a price increase, demand for the product decreases, and vice versa59,60. The study established a price-dependent demand, with demand decreasing quadratically with the product’s price. The demand function for ith retailer is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&r_{r_i} = \Delta _i - x_iS_{P_i} - y_iS_{P_i}^2&\end{aligned}$$\end{document} where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document} is initial demand of retailer i and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x_i$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$y_i$$\end{document} are scaling parameters.Timely delivery of products is a key to success in any business. The manufacturer delivered tires to multi-retailers according to a delivery schedule that depends on tire demand and retailers’ lead times. The manufacturer sells both new and remanufactured at the same price to all retailers61.In a CLSCM, the 3PL plays a significant role. The proposed study split the 3PL into two parts for the capacity issues. 3PL-I collects EOL tires from consumers, offers customers incentives, and recycles them. The recycled EOL tires are then sent to the second component of 3PL (3PL-II). When the manufacturer orders EOL tires, 3PL-II provides those to the manufacturer. Furthermore, 3PL-II provides containers and transportation to manufacturers to distribute tires to retailers.The logistics system in an SCM plays a vital role in timely delivery. Again, consuming EOL tires in a closed-loop CTSCM is essential to reduce waste tires by remanufacturing. Transportation and emissions are related to each other. Therefore, a fixed and a variable carbon-emissions cost is imposed on transportation62,63. A three-echelon CLSCM for tires is found with a manufacturer, a 3PL, and multiple retailers. In an SCM, electricity is a basic need for distinct players with different purposes. In particular, the study finds that the manufacturer needs energy for the production of final products, building management services, common services, and lighting purposes. In the case of 3PLs and retailers, the study finds the energy used for air handling and lighting56. A three-echelon CLSCM for tires is found with a manufacturer, a 3PL, and multiple retailers. In an SCM, electricity is a basic need for distinct players with different purposes. In particular, the study finds that the manufacturer needs energy for the production of final products, building management services, common services, and lighting purposes. In the case of 3PLs and retailers, the study finds the energy used for air handling and lighting56. The study found that smart energy systems provide a combination of renewable and conventional energy, which is both economically and environmentally beneficial. The study established that all players involved in the SCM consume \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% of smart energy, i.e., \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% renewable energy and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1-\alpha )$$\end{document}% traditional energy. Emissions from renewable energy are negligible and are considered zero for the study. The study found that smart energy systems provide a combination of renewable and conventional energy, which is both economically and environmentally beneficial. The study established that all players involved in the SCM consume \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% of smart energy, i.e., \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% renewable energy and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1-\alpha )$$\end{document}% traditional energy. Emissions from renewable energy are negligible and are considered zero for the study. The manufacturer produces new tires under flexible production systems at a variable production rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m$$\end{document} units per unit of time. The price to make a unit product is found to be a function of the production rate, which depends on the development and tool/die costs required to run a successful production system. The price for making a unit product is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right)$$\end{document}, where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document} is per unit raw material cost, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document} is development cost, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document} is tool/die cost57. Moreover, the manufacturer remanufactures collected EOL tires at a fixed per-unit price, and the remanufacturing rate is assumed to equal the collection rate of EOL tires58. The manufacturer produces new tires under flexible production systems at a variable production rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m$$\end{document} units per unit of time. The price to make a unit product is found to be a function of the production rate, which depends on the development and tool/die costs required to run a successful production system. The price for making a unit product is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right)$$\end{document}, where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document} is per unit raw material cost, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document} is development cost, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document} is tool/die cost57. Moreover, the manufacturer remanufactures collected EOL tires at a fixed per-unit price, and the remanufacturing rate is assumed to equal the collection rate of EOL tires58. In reality, more than one retailer sells the same products at different prices across different geographic regions. The study found that there are n retailers that sell the same tire at different prices independently. Price is one of the most crucial factors affecting product demand. In the literature, researchers found that demand changes inversely with price changes, i.e., with a price increase, demand for the product decreases, and vice versa59,60. The study established a price-dependent demand, with demand decreasing quadratically with the product’s price. The demand function for ith retailer is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&r_{r_i} = \Delta _i - x_iS_{P_i} - y_iS_{P_i}^2&\end{aligned}$$\end{document} where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document} is initial demand of retailer i and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x_i$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$y_i$$\end{document} are scaling parameters. In reality, more than one retailer sells the same products at different prices across different geographic regions. The study found that there are n retailers that sell the same tire at different prices independently. Price is one of the most crucial factors affecting product demand. In the literature, researchers found that demand changes inversely with price changes, i.e., with a price increase, demand for the product decreases, and vice versa59,60. The study established a price-dependent demand, with demand decreasing quadratically with the product’s price. The demand function for ith retailer is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&r_{r_i} = \Delta _i - x_iS_{P_i} - y_iS_{P_i}^2&\end{aligned}$$\end{document} where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document} is initial demand of retailer i and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x_i$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$y_i$$\end{document} are scaling parameters. Timely delivery of products is a key to success in any business. The manufacturer delivered tires to multi-retailers according to a delivery schedule that depends on tire demand and retailers’ lead times. The manufacturer sells both new and remanufactured at the same price to all retailers61. Timely delivery of products is a key to success in any business. The manufacturer delivered tires to multi-retailers according to a delivery schedule that depends on tire demand and retailers’ lead times. The manufacturer sells both new and remanufactured at the same price to all retailers61. In a CLSCM, the 3PL plays a significant role. The proposed study split the 3PL into two parts for the capacity issues. 3PL-I collects EOL tires from consumers, offers customers incentives, and recycles them. The recycled EOL tires are then sent to the second component of 3PL (3PL-II). When the manufacturer orders EOL tires, 3PL-II provides those to the manufacturer. Furthermore, 3PL-II provides containers and transportation to manufacturers to distribute tires to retailers. In a CLSCM, the 3PL plays a significant role. The proposed study split the 3PL into two parts for the capacity issues. 3PL-I collects EOL tires from consumers, offers customers incentives, and recycles them. The recycled EOL tires are then sent to the second component of 3PL (3PL-II). When the manufacturer orders EOL tires, 3PL-II provides those to the manufacturer. Furthermore, 3PL-II provides containers and transportation to manufacturers to distribute tires to retailers. The logistics system in an SCM plays a vital role in timely delivery. Again, consuming EOL tires in a closed-loop CTSCM is essential to reduce waste tires by remanufacturing. Transportation and emissions are related to each other. Therefore, a fixed and a variable carbon-emissions cost is imposed on transportation62,63. The logistics system in an SCM plays a vital role in timely delivery. Again, consuming EOL tires in a closed-loop CTSCM is essential to reduce waste tires by remanufacturing. Transportation and emissions are related to each other. Therefore, a fixed and a variable carbon-emissions cost is imposed on transportation62,63. Mathematical expression of the model This study develops a sustainable CLSCM for tires. The CLSCM is established in the context of multiple retailers, a manufacturer, and a third-party (3PL). The manufacturer produces new tires under a flexible manufacturing system, remanufactures EOL tires collected, and delivers the final products to all retailers in accordance with a delivery schedule aligned with retailers’ lead times and demand. All retailers sell final products to end consumers at variable prices. The 3PL provides containers to the manufacturer for delivering final products to retailers. The 3PL collects and supplies EOL products to the manufacturer for remanufacturing. The energy consumption costs for lighting and air handling are considered for all three players of the CLSCM. Further, the manufacturer considers the energy consumption for production, building management systems, and common services. Not all manufactured and remanufactured tires are flawless; therefore, the manufacturer incurs a predetermined cost to enhance quality. The manufacturer incurs a loss of goodwill due to the tire’s inferior quality, and this cost is accounted for in this study. The different costs of the three parties are described in the following: Retailer’s cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TC_r$$\end{document}) The study finds that there are n retailers from different regions that sell final products to end consumers at flexible prices. Each retailer orders new tires from the manufacturer to satisfy customer demand every cycle with a flexible selling price. The basic costs of retailers are considered in formulating the model: ordering costs, holding costs, and energy consumption costs. The elementary description of these costs is given below. Revenue (RR) At a rate $\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}$$\end{document}, final items are sold to customers by the retailer i. Then, the revenue from retailer i is obtained by multiplying the per-unit price by the retailer i’s demand. Therefore, the revenue of the retailer i is1\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} S_{p_i}r_{ri} ~~~~i = 1, 2, . . ., n. \end{aligned}$$\end{document}Hence, total revenue of n retailers is obtained by summation for n retailers.2\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} RR = \sum _{i=1}^{n}S_{p_i}r_{ri} \end{aligned}$$\end{document} Ordering cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{or}$$\end{document}) The cycle length of each retailer in the proposed model is the same. Each retailer spends a fixed amount, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_r$$\end{document}, to order final products from the manufacturer. The ordering costs generally include email, phone, and brokerage fees, as well as taxes and surcharges associated with the ordering process. Therefore, the total ordering cost per cycle for all retailers is calculated by dividing the ordering cost by the cycle length (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document}) and summing over n retailers. Thus, ordering costs for all retailers is3\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{or} =\sum _{i=1}^{n} \frac{G_{ri}}{\tau }. \end{aligned}$$\end{document} Holding cost The retailer keeps and maintains the final products after receiving them from the manufacturer, so the retailer needs some space until all products are sold. In this process, the retailer has to pay a certain amount. In the proposed study, the inventory characteristic for retailers follows the elementary economic order quantity model. The retailer receives the delivery of size \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau r_{ri}$$\end{document}. The average inventory for the ith retailer over time \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document} is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\tau r_{ri}}{2}$$\end{document}. Therefore, the storage expenses of the seller i is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_r\frac{\tau r_{ri}}{2}$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_r$$\end{document} is per unit holding cost. Hence, the total holding cost for n retailers is calculated by summing over n retailers.4\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{hr} = \sum _{i=1}^{n}H_r\frac{\tau r_{ri}}{2} \end{aligned}$$\end{document} Energy consumption cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ECC_R$$\end{document}) Retailers use the building for two primary purposes: conducting official work and storing tires for sale64. The retailer requires energy for lighting and air handling for inventory management and official works. Apart from traditional energy, retailers use \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% smart energy of the total energy they use. The total energy used by the retailer is calculated as follows: Air handling cost The retailer i uses a fan for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _1^i$$\end{document} hours for air handling per day. It is assumed that \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^r_{j(ca)}$$\end{document} is the horsepower energy consumed per hour/fan. At first, the horsepower is converted into watts by multiplying by 746. After that, the total energy consumed in a month is calculated by multiplying the energy consumed in an hour by a single fan by the number of fans used and 30 (days in a month). Then, the total consumed energy is converted to kilowatts by dividing it by 1000. Therefore, the total consumed energy per cycle for air handling for retailer i is calculated as follows:5\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{f_i\times P^r_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _1^i \times 30}{1000\times \tau }. \end{aligned}$$\end{document} Lighting cost The retailer i uses the lights for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _2^i$$\end{document} hours per day to clean the floor, maintain inventory, and conduct official work. The retailer uses \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^r_{j(ca)}$$\end{document} bulbs for management. The total energy consumed by all bulbs is obtained by multiplying the energy consumption (watts) of a single bulb by the number of bulbs used. Then multiply it by 30 to get the monthly energy consumption for lighting. Finally, divide it by 1000 to convert total consumption into kilowatts. Therefore, the energy consumption for lighting per cycle of the retailer i is calculated as below:6\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{B^r_{j(ca)}\times P^r_{j(\frac{w}{bulb})}\times \zeta _2^i \times 30}{1000\times \tau }. \end{aligned}$$\end{document}Hence, total energy consumption for n retailers per cycle is calculated as follows.7\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} TE_R = \sum _{i=1}^{n}\bigg (\frac{f_i\times P^r_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _1^i \times 30}{1000\times \tau }+\frac{B^r_{j(ca)}\times P^r_{j(\frac{w}{bulb})}\times \zeta _2^i \times 30}{1000\times \tau }\bigg ) \end{aligned}$$\end{document}The retailer i uses smart electricity, which combines renewable and non-renewable energy. That is the retailer pays for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% renewable energy and rest \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1-\alpha )$$\end{document}% non-renewable energy at a rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_1$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_2$$\end{document} ($/unit), respectively. Then, the total energy cost for all retailers is8\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} ECC_R=\left( ec_1\times \alpha +ec_2\times (1-\alpha )\right) TE_R. \end{aligned}$$\end{document}Now, the total cost for n retailer is9\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} TC_r = \sum _{i=1}^{n} \frac{G_{ri}}{\tau } + \sum _{i=1}^{n}H_r\frac{\tau r_{ri}}{2}+ECC_R. \end{aligned}$$\end{document} Model for the manufacturer The producer produces new products under a flexible production system and remanufactures EOL products collected. Then, the manufacturer delivers the final products to all retailers with a specified delivery schedule. The manufacturer ordered used tires with the least quality, Q, from 3PL. The basic costs to the producer are setup, ordering, storage costs for new and EOL products, energy consumption costs, manufacturing and remanufacturing costs, goodwill loss costs, and quality degradation costs. Setup cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{ms}$$\end{document}) The setup is a crucial step in the production process for any manufacturing industry. Before the start of production, every manufacturing industry goes through machinery setup, inspection, and other tasks to ensure a smooth, successful production process. Therefore, at the beginning of each production period, the manufacturer must incur costs to establish a proper manufacturing setup. In this proposed study, the setup expenses per cycle for the producer are calculated.10\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{ms} = \frac{B_m}{\tau } \end{aligned}$$\end{document} Ordering cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{om}$$\end{document}) The remanufacturing of EOL tires is both economically and environmentally beneficial. For remanufacturing EOL tires, the manufacturer must collect them from the end market or a third party. In the present model, the manufacturer is found to collect EOL tires from a third party. For this, the manufacturer must place an order with the 3PL for EOL tires as needed. If the manufacturer pays an amount of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_m$$\end{document} $ in a single order, then the ordering cost of the manufacturer per cycle is obtained by dividing \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_m$$\end{document} by the cycle length \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document}. Therefore, the producer’s ordering expenses per cycle are calculated as follows.11\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{om} = \frac{G_m}{\tau } \end{aligned}$$\end{document} Holding cost for new tire (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{hns}$$\end{document}) The manufacturer starts the production process based on the total order amount received from all retailers. The manufacturer delivers the ordered quantity to all retailers upon completion of the production process. Therefore, the manufacturer must store the final products in their warehouse throughout the production process. After that, the manufacturer delivers the ordered quantity to all retailers according to a predefined delivery schedule that depends on the retailer’s ordered quantity and the delivery lead time. Now, the total inventory for the final products of the producer is derived as follows:12\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&= \frac{1}{2}\frac{q^2}{\rho _m} + \frac{q^2}{d} - L_1P_1 - L_2(P_1 + P_2) - L_3(P_1 + P_2 + P_3)- . . . - (L_n)(P_1 + P_2 + P_3 + . . . + P_n)\nonumber \\&= \frac{(d\tau )^2}{2\rho _m} + \frac{(d\tau )^2}{d} - \tau [L_1r_{r1} + L_2(r_{r1} + r_{r2}) + L_3(r_{r1} + r_{r2} + r_{r3}) + . . . + (L_n)(r_{r1} + r_{r2} + r_{r3} + . . . + r_{rn})]\nonumber \\&= \frac{d\tau ^2(d + 2 \rho _m)}{2\rho _m} - \tau \bigg [\sum _{i=1}^{n}L_i\sum _{j=1}^{i}r_{rj}\bigg ]. \end{aligned}$$\end{document}In that case, the average inventory in each period is\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}& \frac{d\tau (d + 2 \rho _m)}{2\rho _m} - \bigg [\sum _{i=1}^{n}L_i\sum _{j=1}^{i}r_{rj}\bigg ].&\end{aligned}$$\end{document}Thus, the holding cost for the new tires of the manufacturer per unit time is13\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{hns} = H_m\bigg [\frac{d\tau (d + 2 \rho _m)}{2\rho _m} - \sum _{i=1}^{n}L_i\sum _{j=1}^{i}r_{rj}\bigg ]. \end{aligned}$$\end{document}Fig. 4Finished product inventory. Finished product inventory. Holding cost for used product (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{hc}$$\end{document}) The manufacturer places an order for EOL tires with the 3PL after completing the production process and stores those EOL products until the start of another production cycle. From Fig. 4, it is clear that holding of the EOL tires is the aggregate of the rectangle under setup time \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau - q/\rho _m$$\end{document} and area of the triangle over production runtime \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(q/\rho _m)$$\end{document}. The total inventory of EOL tires is calculated as follows:14\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&= \beta d(\tau - q/\rho _m) + \frac{\beta d q}{2\rho _m}= \beta d\bigg (\tau - \sum _{i=1}^{n}r_{ri}\tau /\rho _m\bigg ) + \frac{\beta d\sum _{i=1}^{n}r_{ri}\tau }{2\rho _m} = \beta d\bigg (\tau - \frac{\sum _{i=1}^{n}r_{ri} \tau }{2\rho _m}\bigg ). \end{aligned}$$\end{document}Therefore, the average inventory for the EOL tires is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta d\bigg (1 - \frac{\sum _{i=1}^n r_{ri}}{2\rho _m}\bigg )$$\end{document}. Now, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m'$$\end{document} is the per unit holding cost of EOL tires. Hence the storage cost of the producer for EOL tires is15\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{hc} = H_m'\beta d\bigg (1 - \frac{\sum _{i=1}^n r_{ri}}{2\rho _m}\bigg ). \end{aligned}$$\end{document} Manufacturing cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{MC}$$\end{document}) The manufacturer produces new tires from raw materials under a flexible production system. A flexible production system is very useful for controlling production rates in response to product demand. The per unit production cost is a function of the production rate, which is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right)$$\end{document} 65. Here, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document} is the per unit raw material cost ($/unit), \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document} is the development costs, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document} is the tool/die costs associated with the flexible production system. The manufacturer produces new tires and remanufactures EOL tires. The manufacturer produces \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$d(1 - \beta )$$\end{document} units of new products at a variable production rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m$$\end{document} units/unit time. Hence, the total manufacturing costs are obtained as follows:16\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{MC} = \left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right) d(1 - \beta ). \end{aligned}$$\end{document} Remanufacturing cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{RC}$$\end{document}) In response to governmental pressure and heightened consumer environmental consciousness, industries are investing in the production of eco-friendly products by minimizing resource consumption and mitigating risks through the reuse, remanufacturing, and recycling of EOL products. The remanufacturing of EOL tires is economically advantageous and environmentally sustainable. Consequently, the manufacturer purchases EOL tires from the 3PL at a rate of $\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_3$$\end{document}/unit. The manufacturer allocates $\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_r$$\end{document}/unit to remanufacture each end-of-life tire to restore it to a condition equivalent to that of a new product. Consequently, the manufacturer’s remanufacturing expense is17\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{RC} = \beta d(c_r + c_3). \end{aligned}$$\end{document} Energy consumption cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ECC_M$$\end{document}) Energy for machine Energy is a primary tool for any production system. The production process is interrupted for various reasons, and improper energy supply is one of them. An interruption in the production process results in lower profits for the manufacturer. Therefore, the manufacturer drives the machine \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _3$$\end{document} hours per day to continue the production process. Energy consumed for a machine per hour is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$M^m_{j(hp)}$$\end{document} horsepower. The energy required per cycle is calculated by multiplying the number of hours the machine runs by 30 days, then dividing by the cycle time. Total energy consumption for the machine run per cycle is as follows:18\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{M^m_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _3 \times 30}{1000\times \tau }. \end{aligned}$$\end{document} Energy for BMS One of the most essential services in a manufacturing plant is building management service(BMS). This service includes Maintenance, testing, inspections, cleaning, fire safety, and operations. If an average of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{MS}$$\end{document} kWh of energy is used for BMS, then the total energy used for BMS per cycle of the manufacturer is calculated as follows:19\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{B_{MS}}{\tau }. \end{aligned}$$\end{document} Energy for common services Common services and utilities in a tire manufacturing plant include cooling water, chiller, heat pump, compressor, boiler, and vacuum56. If \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$E_{CS}$$\end{document} is the required monthly energy for common service, then the total energy used for common services by the manufacturing plant per cycle is calculated as follows:20\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{E_{CS}}{\tau }. \end{aligned}$$\end{document} Energy for lighting Proper lighting is one of the most critical components of any production system. Light is essential to a production system for running the production process and managing inventory. LED high bay lights are used in the tire manufacturing plant for lighting. Let \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sum _{j=1}^{\Omega }F^m_{j(ca)}$$\end{document} be the number of high bay lights used for lighting. The total energy consumed by all bulbs is obtained by multiplying the energy consumption (watts) of a single bulb by the number of bulbs used. Then multiply it by 30 to get the monthly energy consumption for lighting. Finally, divide it by 1000 to convert total consumption into kilowatts. Therefore, the energy consumption for lighting per cycle of the manufacturer is calculated as follows:21\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{F^m_{j(ca)}\times P^m_{j(\frac{w}{bulb})}\times \zeta _5 \times 30}{1000\times \tau }. \end{aligned}$$\end{document}Therefore, the overall expenses for consuming energy by the producer per cycle is22\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TE_M = \frac{M^m_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _3 \times 30}{1000\times \tau }+\frac{B_{MS}}{\tau }+\frac{E_{CS}}{\tau }+\frac{F^m_{j(ca)}\times P^m_{j(\frac{w}{bulb})}\times \zeta _5 \times 30}{1000\times \tau }. \end{aligned}$$\end{document}The manufacturer uses smart electricity, which combines renewable and non-renewable energy. That is the retailer pays for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% renewable energy and rest \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(1-\alpha )$$\end{document}% non-renewable energy at a rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_1$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_2$$\end{document} ($/unit), respectively. Then, the total energy cost of the manufacturer is23\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&ECC_M =\left( ec_1\times \alpha +ec_2\times (1-\alpha )\right) TE_M\nonumber \\&=\left( ec_1\times \alpha +ec_2\times (1-\alpha )\right) \bigg (\frac{M^m_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _3 \times 30}{1000\times \tau }+\frac{B_{MS} }{\tau }+\frac{E_{CS}}{\tau }+\frac{F^m_{j(ca)}\times P^m_{j(\frac{w}{bulb})}\times \zeta _5}{1000\times \tau }\bigg ). \end{aligned}$$\end{document} Quality upgradation cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{QM}$$\end{document}) It is considered that the average quality of the EOL tires is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$Q_r$$\end{document}. Now, the manufacturer upgrades the quality of these EOL tires to Q during remanufacturing. To improve this quality to Q, the manufacturer must incur some cost. In this study, a quadratic function is used to model the increasing quality rate with increasing investment amount58. The manufacturer invests \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_Q$$\end{document} ($/product) to improve product quality. Therefore, the expenses of the producer to improve the quality of the product are24\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{QM} = c_QQ^2d(1-\beta ) + \beta dc_Q(Q^2 - Q_r^2). \end{aligned}$$\end{document} Goodwill lost cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{GL}$$\end{document}) Goodwill is an intangible asset that adds value to an enterprise over time. It refers to the enterprise’s value generated by its brand, customer base, and other factors. Now, faulty, low-quality products will decrease the manufacturer’s brand value. It is considered that the manufactured and remanufactured tires are not 100% pure. Therefore, it will harm the enterprise’s brand image. Due to a goodwill loss, there will be an effect on product sales, and this loss is called the goodwill loss cost. The goodwill lost cost of the manufacturer is calculated as follows:25\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} C_{GL} = (1-Q)G. \end{aligned}$$\end{document}Total cost for manufacturer is26\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TC_m = \frac{B_m}{\tau }+\frac{G_m}{\tau }+H_m\bigg [\frac{d\tau (d + 2 \rho _m)}{2\rho _m} - \sum _{i=1}^{n}L_i\sum _{j=1}^{i}d_j\bigg ]+(1-Q)G+H_m'\beta d\bigg (1 - \frac{\sum _{i=1}^n r_{ri}}{2\rho _m}\bigg )+c_QQ^2d(1-\beta ) \nonumber \\&+ \beta dc_Q(Q^2 - Q_r^2)+\left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right) d(1 - \beta )+\beta d(c_r+c_3)+\left( ec_1\times \alpha +ec_2\times (1-\alpha )\right) +ECC_M. \end{aligned}$$\end{document} 3PL cost In an SCM, the 3PL plays an essential role in closing the loop. Two 3PLs are considered for the system’s incapabilities in the proposed CLSCM. The inclusions of two 3PL reflects an operational necessity in real closed-loop tire supply chains and provides several modelling advantages. It is described as follows: Capacity and functional specialization In the proposed study, two 3PLs use different logistics processes for the management of EOL tires. 3PL-I: The 3PL-I collects EOL tires from customers, inspects those products, and is involved in preliminary processing. 3PL-II: Whereas the 3PL-II stores EOL products after collecting them from 3PL-I and delivers them to the manufacturer as per the manufacturer’s requirements. In addition, 3PL-II provides containers to the manufacturer for the forward distribution of new tires. These activities need different capacities, infrastructure, and cost structures. For example, collection centres, named 3PL-I, are typically highly decentralized and have limited capacity; in contrast, storage/container hubs are centralized and have high capacity. Therefore, representing these two 3PLs as a single node in the proposed SCM may mask these structural constraints and misrepresent the real-world scenario. Accurate representation of forward versus reverse flow Further in the model, the closed-loop of the SCM is described as: The forward flow (manufacturer \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rightarrow$$\end{document} retailer \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rightarrow$$\end{document} return of empty container to 3PL-II) and the reverse flow ( collection of EOL tire by 3PL-I \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rightarrow$$\end{document} send to 3PL-II after recycling \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rightarrow$$\end{document} shipment of EOL tires to manufacturer). However, treating two 3PLs as nodes to handle the forward and reverse flows allows the model to capture crucial entities separately. These entities are: holding cost dynamics at two nodes, the pattern of smart energy use, separate transportation costs, and emissions contributions. Therefore, splitting 3PL into two nodes realistically represents real-world scenarios and, rather than increasing complexity, enhances the model’s analytical usefulness. The elementary costs related to 3PLs are discussed in the following: 3PL-I cost The servicing centre is considered 3Pl-I. It collects used tires from customers by paying an incentive of the amount \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_1 \$/\text{unit }$$\end{document}. The collection period of the 3PL-I is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\tau }{y_1}$$\end{document}, and at the end of each period, it provides the EOL tires to the 3PL-II on its own expense. The costs related to it are described below. Setup cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$SC_{3PL}$$\end{document}) A setup is essential to start any business. The tasks of any third-party logistics are to collect EOL products from end users and send them to a player in an SCM. Therefore, for EOL tire collection, handling, storage, and recycling, the 3PL-I needs a basic setup. The 3PL-I completes the setup process at the beginning of each cycle, which requires him to spend some money. Therefore, the setup cost per cycle for the 3PL-I is calculated as follows.27\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} SC_{3PL} = \frac{B_{31}y_1}{\tau } \end{aligned}$$\end{document} Collection cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$CC_{3PLI}$$\end{document}) The 3PL-I gathers EOL tires from consumers at a rate \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta$$\end{document}. Then, the total units of EOL tires collected is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$d\beta$$\end{document}. At first, 3PL-I invests a certain amount in the collection centre and arranges the inspection system. The 3PL-I pays \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_1(\$/unit)$$\end{document} to the customer. The total collection cost is28\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} CC_{3PLI} = a\beta ^2 + d\beta c_1. \end{aligned}$$\end{document} Holding cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$HC_{3PLI}$$\end{document}) The 3PL-I collects and inspects EOL tires, then stores them in the storeroom until they are dispatched to the 3PL-II. In each cycle \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau /y_1$$\end{document}, the 3PL-I collects an equal volume of EOL tires, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{d\beta }{y_1}$$\end{document} units, and sells them at the end of that cycle. Since \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$h_{31}$$\end{document} is the per-unit storage expense of an EOL tire, the total holding cost per cycle is29\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} HC_{3PLI} = h_{31}\frac{d\beta \tau }{2y_1^2}. \end{aligned}$$\end{document} Energy consumption cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ECC_{3PLI}$$\end{document}) In the inventory management process, the 3PL-I has to incur costs for energy consumption for lighting and air handling. The 3PL-I uses smart energy rather than only traditional energy to reduce energy consumption costs. The total energy required for 3PL-I is calculated as follows: Energy for air handling For official works, such as storing EOL tires and inspecting those, the 3PL-I uses fans for air handling. The 3PL-I uses \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F_2$$\end{document} fans for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _6$$\end{document} daily hours. At first, the horsepower is converted into watts by multiplying by 746. After that, the total energy consumed in a month is calculated by multiplying the energy consumed in an hour by a single fan by the number of fans used and 30 (days in a month). Then, the total consumed energy is converted to kilowatts by dividing it by 1000. Therefore, the total consumed energy per cycle for air handling for the 3PL-I is calculated as follows:30\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{F_2\times P^{31}_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _6 \times 30}{1000\times \frac{\tau }{y_1}}. \end{aligned}$$\end{document} Energy for lightning Light energy is required for official work, such as storing and recycling EOL tires for the 3PL-I. The 3PL-I uses \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{31}_{j(ca)}$$\end{document} number of bulbs every day for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _8$$\end{document} hours. The total energy consumed by all bulbs is obtained by multiplying the energy consumption (watts) of a single bulb by the number of bulbs used. Then multiply it by 30 to get the monthly energy consumption for lighting. Finally, divide it by 1000 to convert total consumption into kilowatts. Therefore, the energy consumption for lighting per cycle of the 3PL-I is calculated as follows:31\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{B^{31}_{j(ca)}\times P^{31}_{j(\frac{w}{bulb})}\times \zeta _8 \times 30}{1000\times \frac{\tau }{y_1}}. \end{aligned}$$\end{document}The total energy cost of the 3PL-I is coming form air handling and lighting. Therefore, total energy used by 3PL-I is given as below:32\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TE_{3PLI} = \bigg (\frac{F_2\times P^{31}_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _6 \times 30}{1000\times \frac{\tau }{y_1}}+\frac{B^{31}_{j(ca)}\times P^{31}_{j(\frac{w}{bulb})}\times \zeta _8 \times 30}{1000\times \frac{\tau }{y_1}}\bigg ). \end{aligned}$$\end{document}Similar to others player 3PL-I use smart energy of which \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% is renewable energy and rest is non-renewable energy. The overall energy expenses by the 3PL-I is33\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&ECC_{3PLI}= (ec_1\alpha +ec_2\times (1-\alpha ))\times TE_{3PLI} =(ec_1\alpha +ec_2\times (1-\alpha ))\times \bigg (\frac{F_2\times P^{31}_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _6 \times 30}{1000\times \frac{\tau }{y_1}}+\frac{B^{31}_{j(ca)}\times P^{31}_{j(\frac{w}{bulb})}\times \zeta _8 \times 30}{1000\times \frac{\tau }{y_1}}\bigg ). \end{aligned}$$\end{document} Transportation cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TCC_{3PLI}$$\end{document}) 3PL-I collects EOL tires from customers and holds them at its store until they are sent to 3PL-II. At the end of the cycle, the 3PL-I delivers EOL tires to the 3PL-II. It is considered that the transportation cost for EOL tires is borne by 3PL-I. It is taken that 3PL-I follows a multiple-delivery policy. Therefore, per cycle, the fixed and variable transportation costs are34\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} TCC_{3PLI} = \frac{(F_T + V_Td\beta )y_1}{\tau }. \end{aligned}$$\end{document}The total cost of the 3PL-I is35\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} TC_{3PLI} = \frac{B_{31}y_1}{\tau }+ a\beta ^2 + d\beta c_1 + h_{31}\frac{d\beta \tau }{2y_1^2}+ \frac{(F_T + V_Td\beta )y_1}{\tau }+(ec_1\alpha +ec_2\times (1-\alpha ))+ECC_{3PLI}. \end{aligned}$$\end{document} 3PL-II cost The main task of 3PL-II is to provide containers to meet the manufacturer’s demand for supplying new tires to all retailers, and the other task is to collect EOL tires from 3PL-II to meet the manufacturer’s demand for remanufacturing. The costs of the 3PL-II are as follows. Setup cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$SC_{3PLII}$$\end{document}) A setup is fundamental to starting any business. The 3PL-II collects EOL tires from 3PL-I and stores them, along with containers, for delivering new tires from the manufacturer to all retailers. Therefore, for the collection, transportation, storage, and handling of tires and containers, the 3PL-II requires a basic setup. The 3PL-II completes the setup process at the beginning of each cycle, which costs him some money. Therefore, the 3PL-I setup cost per cycle is calculated as follows.36\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} SC_{3PLII} = \frac{B_{32}}{\tau }. \end{aligned}$$\end{document} Holding cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$HC_{3PLII}$$\end{document}) The 3PL-II collects used tires from the 3PL-I by paying a specific per-unit cost for EOL tires. These used tires are sold to the manufacturer for remanufacturing. The time duration between receiving used tires from 3PL-I and delivering to the manufacturer, 3PL-II has to carry these EOL tires in the store. It is assumed that the 3PL-II must spend \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$h_{32}$$\end{document} $/unit for storage. The storage cost of 3PL-II is determined by multiplying the unit cost \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$h_{32}$$\end{document} with the average stock of EOL tires. Hence, the storage expenses per period for 3PL-II are37\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} HC_{3PLII} = h_{32}\frac{d\beta \tau }{2}. \end{aligned}$$\end{document} Energy consumption cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ECC_{3PLII}$$\end{document}) To hold the EOL tires and containers, the 3PL-II has to spend some costs for energy consumption due to lightning and air handling. These cost are calculated as follows. Energy for air handling For official works, storing EOL tires and containers, the 3PL-II uses fans for air handling. The 3PL-II uses \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F_3$$\end{document} fans for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _7$$\end{document} hours daily. At first, the horsepower is converted into watts by multiplying by 746. After that, the total energy consumed in a month is calculated by multiplying the energy consumed in an hour by a single fan by the number of fans used and 30 (days in a month). Then, the total consumed energy is converted to kilowatts by dividing it by 1000. Therefore, the total consumed energy per cycle for air handling for the 3PL-II is calculated as follows:38\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{F_3\times P^{32}_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _7 \times 30}{1000\times \tau }. \end{aligned}$$\end{document} Energy for lightning Energy for light is required for official work, such as storing and recycling EOL tires for the 3PL-II. The 3PL-II uses \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{32}_{j(ca)}$$\end{document} number of bulbs every day for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _9$$\end{document} hours. The total energy consumed by all bulbs is obtained by multiplying the energy consumption (watts) of a single bulb by the number of bulbs used. Then multiply it by 30 to get the monthly energy consumption for lighting. Finally, divide it by 1000 to convert total consumption into kilowatts. Therefore, the energy consumption for lighting per cycle of the 3PL-I is calculated as follows:39\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} \frac{B^{32}_{j(ca)}\times P^{32}_{j(\frac{w}{bulb})}\times \zeta _9 \times 30}{1000\times \tau }. \end{aligned}$$\end{document}Similar to others player, 3PL-II use smart energy of which \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}% is renewable energy and rest is non-renewable energy. Then the total cost that has to pay for using energy by the 3PL-I is40\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TE_{3PLII} = \frac{F_{32}\times P^{32}_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _7 \times 30}{1000\times \tau }+ \frac{B^{32}_{j(ca)}\times P^{32}_{j(\frac{w}{bulb})}\times \zeta _9 \times 30}{1000\times \tau }. \end{aligned}$$\end{document}Therefore, the total cost paid by 3PL-II for using energy is41\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&ECC_{3PLII}=(ec_1\alpha +ec_2\times (1-\alpha ))\times TE_{3PLII}= (ec_1\alpha + ec_2\times (1-\alpha )\times \bigg (\frac{F_3\times P^{32}_{j(hp)}\times 746_{\frac{w}{hp}}\times \zeta _7 \times 30}{1000\times \tau }+ \frac{B^{32}_{j(ca)}\times P^{32}_{j(\frac{w}{bulb})}\times \zeta _9 \times 30}{1000\times \tau }\bigg ). \end{aligned}$$\end{document} Transportation cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TCC_{3PLII}$$\end{document}) The 3PL-II provides containers to transport new tires from the manufacturer to all retailers, and empty containers are returned to 3PL-II upon delivery completion. At the end of each period \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document}, the 3PL-II supplies \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$d\beta$$\end{document} units of EOL tires to the manufacturer. The overall shipping expenses of the 3PL-II are the aggregate of the following three: (i) The shipping cost to supply new tires from the manufacturer to all retailers is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t\big (\delta _{im}(\frac{P_i}{\sigma })\big ).$$\end{document} (ii) the transportation cost for returning empty container is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t(\delta _{ik_1}(\frac{P_i}{\sigma })).$$\end{document} (iii) the transportation cost for providing EOL tires to the manufacturer is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t(\delta _{k_1m}(\frac{d\beta }{\sigma }))$$\end{document}. Hence the overall shipping charge of the 3PL-II is42\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} TCC_{3PLII} = c_t\bigg [\sum _{i=1}^{n}\delta _{im}(\frac{P_i}{\sigma }) + \sum _{i=1}^{n}\delta _{ik}(\frac{P_i}{\sigma }) + \delta _{km}(\frac{d\beta }{\sigma })\bigg ]. \end{aligned}$$\end{document} Container management cost (CMC) It is vital to determine the number of containers to ensure the smooth flow of goods between the node (producer, retailer) and from 3PL-II to the manufacturer, without increasing the system’s cost too much. Therefore, to optimize the storage expenses for containers in the system, the maximum number of containers used is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\lceil \frac{d_{max}\tau }{\sigma }\rceil$$\end{document} 66. Therefore, the container management cost is43\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} CMC = p\sigma ^{t-1}d_{max}\tau. \end{aligned}$$\end{document}t provides the reference between the management cost of the container and its capacity. When \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$t>1$$\end{document}, the management cost of a small container is less than the large container, and when \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$t<1$$\end{document}, the management cost for a small container is much more than a large container. Cost for holding the container (CHC) The 3PL-II provides containers for transporting finished tires to all retailers. Therefore, 3PL-II must store the containers in its storeroom. For a smooth flow of product, the maximum number of containers used is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\lceil \frac{q_{max}}{\sigma }\rceil$$\end{document}, which is required for the delivery of the largest single delivery. After that, the deliveries are small, and the extra container has to be held by the 3PL-II. The average inventory is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\bigg (\sum _{i=1}^{n} L_i\bigg (\frac{d_{max}-r_{ri}}{\sigma }\bigg ) + (\tau - \sum _{i=1}^nL_i)\frac{d_{max}}{\sigma }\bigg )$$\end{document}. Therefore, the inventory holding cost is44\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} CHC = h_c\bigg (\sum _{i=1}^{n} L_i\bigg (\frac{d_{max}-r_{ri}}{\sigma }\bigg ) + (\tau - \sum _{i=1}^nL_i)\frac{d_{max}}{\sigma }\bigg ). \end{aligned}$$\end{document}The total cost 3PL-II is summarized in the following equation as follows:45\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TC_{3PL-II} = \frac{B_{32}}{\tau }+h_{32}\frac{d\beta \tau }{2}+p\sigma ^{t-1}d_{max}\tau + h_c\bigg (\sum _{i=1}^{n} L_i\bigg (\frac{d_{max}-r_{ri}}{\sigma }\bigg ) + (\tau - \sum _{i=1}^nL_i)\frac{d_{max}}{\sigma }\bigg )+ECC_{3PL-II}+c_t\bigg [\sum _{i=1}^{n}\delta _{im}(\frac{r_{ri}\tau }{\sigma }) + \sum _{i=1}^{n}\delta _{ik}(\frac{r_{ri}\tau }{\sigma }) + \delta _{km}(\frac{d\beta }{\sigma })\bigg ]. \end{aligned}$$\end{document} Cost regarding carbon emissions Carbon is emitted into the environment due to transportation in both forward SCM and reverse SCM. Two types of carbon emissions costs are considered: a fixed cost related to distance, fuel, etc., and a variable cost depending on shipment size. Emissions in forward SC (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$CEF_S$$\end{document}) 3PL sends the container to the manufacturer in the forward supply chain. The producer sends the loaded containers to retailers. Throughout the entire transportation process, carbon is emitted. The total emissions cost in the forward supply chain management is given as follows:46\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} CEF_S = \sum _{i=1}^n D_{fi} + \sum _{i=1}^nD_vr_{ri}\tau. \end{aligned}$$\end{document} Emissions in reverse SC (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$CEB_s$$\end{document}) In the reverse supply chain, the 3PL collects the EOL tires from customers. Then, the 3PL sends those tires to the producer as needed. The total process includes transportation, during which some carbon is emitted. The total emissions cost in the reverse supply chain is given below:47\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} CEB_s = \sum _{i=1}^n D_{fri} + D_{vr}\beta d. \end{aligned}$$\end{document} Emissions calculation for using traditional energy Traditional energy produced by burning fossil fuels, which is why a huge amount of CO2 is emitted into the environment. For producing 1 million BTU energy an average of K1 \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\hbox {pounds}^2$$\end{document} (https://www.eia.gov/tools/faqs/faq.php?id=74&t=11, accessed on 19.04.2023 at 07:56 am IST) CO2 emitted. Again 1 million BTU energy equivalent to K2 kwh \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\hbox {energy}^3$$\end{document} (https://www.inchcalculator.com/convert/kilowatt-hour-to-million-btu/), which means that to produce 1 kwh energy approximately \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_E$$\end{document} kg CO2 emitted. Thus, the total CO2 emissions in this proposed supply chain for using traditional energy is48\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned} TCE=C_E\times (1-\alpha )\times \bigg (TE_R + TE_M + TE_{31} + TE_{32}\bigg ). \end{aligned}$$\end{document} Profit calculation Total profit of the SCM is calculated by subtracting total cost of the manufacturer, retailers, 3PLs cost, and emissions cost from the revenue. Therefore total profit = Revenue - (Manufacturer’s cost + Retailer cost + 3PL cost + Carbon emissions cost)49\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TP(\beta , S_{p_i}, \tau , \sigma , \rho _m)=\sum _{i=1}^{n}S_{p_i}r_{ri} - \bigg [\sum _{i=1}^{n} \frac{G_{ri}}{\tau }+ \sum _{i=1}^{n}H_r\frac{\tau r_{ri}}{2} + \left( ec_1\times \alpha +ec_2\times (1-\alpha )\right) TE_R + \frac{B_m}{\tau } + \frac{G_m}{\tau } \nonumber \\&+H_m\bigg [\frac{d\tau (d + 2 \rho _m)}{2\rho _m} - \sum _{i=1}^{n}L_i\sum _{j=1}^{i}r_{rj}\bigg ]+ H_m'\beta d\bigg (1 - \frac{\sum _{i=1}^n r_{ri}}{2\rho _m}\bigg ) + \left( b_0+\frac{b_1}{\rho _m}+b_2\rho _m\right) d(1 - \beta )+ \beta d(c_r + c_3)\nonumber \\&+ \left( ec_1\times \alpha +ec_2\times (1-\alpha )\right) TE_M + c_QQ^2d(1-\beta ) + \beta dc_Q(Q^2 - Q_r^2) + (1-Q)G + \frac{B_{31}y_1}{\tau } + a\beta ^2 + d\beta c_1 \nonumber \\&+ h_{31}\frac{d\beta \tau }{2y_1^2} + (ec_1\alpha +ec_2\times (1-\alpha ))\times TE_{3PLI} + \frac{(F_T + V_Td\beta )y_1}{\tau } + \frac{B_{32}}{\tau } + h_{32}\frac{d\beta \tau }{2}\nonumber \\&+ (ec_1\alpha +ec_2\times (1-\alpha ))\times TE_{3PLII} + c_t\bigg [\sum _{i=1}^{n}\delta _{im}(\frac{P_i}{\sigma }) + \sum _{i=1}^{n}\delta _{ik}(\frac{P_i}{\sigma }) + \delta _{km}(\frac{d\beta }{\sigma })\bigg ] + p\sigma ^{t-1}d_{max}\tau \nonumber \\&+ h_c\bigg (\sum _{i=1}^{n} L_i\bigg (\frac{d_{max}-r_{ri}}{\sigma }\bigg ) + (\tau - \sum _{i=1}^nL_i)\frac{d_{max}}{\sigma }\bigg ) + \sum _{i=1}^n D_{fi} + \sum _{i=1}^nD_vr_{ri}\tau + \sum _{i=1}^n D_{fri} + D_{vr}\beta d\bigg ], \end{aligned}$$\end{document}where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TE_R$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TE_m$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TE_{3PLI}$$\end{document}, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TE_{3PLII}$$\end{document} represent total energy consumption per cycle by retailers, manufacturer, 3PL-I, and 3PL-II, respectively. Furthermore, these terms are defined in Equations 7, 22, 32, and 40, respectively. Solution methodology The proposed model identifies a three-echelon sustainable CLSCM comprising a manufacturer, a third party, and multiple retailers. The study maximizes total profit by leveraging smart energy and a price-dependent quadratic demand, along with the manufacturer’s hybrid production strategy. However, the formulated profit function given by the Eq. 49 is a mixed integer nonlinear function (MINLP). The non-integer decision variables are the final product price at different retail stores, cycle time, production rate, and the return rate of the EOL product. The integer variable represents the container’s capacity. A classical optimization technique is used to find the global maximum profit and the corresponding unique values of the decision variables. The necessary and sufficient conditions of the classical optimization technique are expressed below to prove the global optimality of the profit function. Necessary condition According to the classical optimization technique, the unique value of the non-integer decision variables can be achieved by differentiating the profit function 49 partially with respect to decision variables (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m$$\end{document}, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta$$\end{document}) and then equating it to zero. In this process, one can get the unique values of all decision variables, which are listed as follows:50\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&\beta ^* = \frac{1}{2a}\left( \Theta _1 - \Theta _2\right) \end{aligned}$$\end{document}51\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&\tau ^*= \sqrt{\frac{\Theta _3}{\Theta _4}} \end{aligned}$$\end{document}52\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&S_{p_i}^* = \frac{1}{2y_i}\left[ \frac{r_{r_i}}{\Gamma _i}-x_i\right] ,~~\text{ i } \text{= } \text{1, } \text{2, } \text{3, } \text{. } \text{. } \text{., } \text{ n }\end{aligned}$$\end{document}53\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&\rho _m^* = \sqrt{\frac{d[H_md\tau -H_m'\beta \sum _{i=1}^{n}r_{ri}+2(1-\beta )c_1]}{2c_2d(1-\beta )}}. \end{aligned}$$\end{document}Now, the optimal value of the integer variable \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma$$\end{document} (capacity of the container) can be achieved from the total profit function 49 through the use of the following inequality.\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&TP(\sigma ^*-1)\le TP(\sigma ^*)\ge TP(\sigma ^*+1).&\end{aligned}$$\end{document} Theorem 1 The optimal value of the integer variable \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma$$\end{document} can be obtained if \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _1\ge 0$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _2\ge 0$$\end{document}, where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _1=pd_{max}\tau \left[ (\sigma -1)^{t-1}-\sigma ^{t-1}\right] +\frac{\mathbb {B}}{\sigma (\sigma -1)}$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _2=pd_{max}\tau \left[ (\sigma +1)^{t-1}-\sigma ^{t-1}\right] -\frac{\mathbb {B}}{\sigma (\sigma +1)}$$\end{document}. Proof First, regrouping the total profit function, one can write it as \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TP(\beta , S_{p_i}, \tau , \sigma , \rho _m) =\mathbb {A}-\frac{\mathbb {B}}{\sigma }-pd_{max}\tau \sigma ^{t-1}$$\end{document}, where \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathbb {A}$$\end{document} is the sum of revenue and all costs which does not include \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma$$\end{document} in the total profit function (Eq. 49) and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathbb {B} = h_c \bigg( \sum _{i=1}^{n} L_i\left( d_{max}-r_{ri}\right)$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$+ (\tau - \sum _{i=1}^nL_i)d_{max}\bigg) +c_t\left[ \sum _{i=1}^{n}\delta _{im}(r_{ri}\tau ) + \sum _{i=1}^{n}\delta _{ik}(r_{ri}\tau ) + \delta _{km}d\beta \right]$$\end{document}. Now, according to the condition for existing unique value for \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma$$\end{document}, one can write \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$TP(\sigma ^*-1)\le TP(\sigma ^*)\ge TP(\sigma ^*+1)$$\end{document}. From the inequality, one can get \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathbb {A}-\frac{\mathbb {B}}{\sigma -1}-pd_{max}\tau (\sigma -1)^{t-1}\le \mathbb {A}-$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\mathbb {B}}{\sigma }-pd_{max}\tau \sigma ^{(t-1)}\ge \mathbb {A}-\frac{\mathbb {B}}{\sigma +1}-pd_{max} \tau (\sigma +1)^{t-1}$$\end{document}. Simplifying this inequality, one can get \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$pd_{max}\tau \left[ (\sigma -1)^{t-1}-\sigma ^{t-1}\right] +\frac{\mathbb {B}}{\sigma (\sigma -1)}\ge 0$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$pd_{max}\tau \left[ (\sigma +1)^{t-1}-\sigma ^{t-1}\right] -\frac{\mathbb {B}}{\sigma (\sigma +1)}\ge 0$$\end{document}. This implies that for the optimal value of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _1\ge 0$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _2\ge 0$$\end{document}. \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} Lemma 1 The optimal value of the cycle time \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document} exists if \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\sum _{i=1}^{n}H_rr_{ri}}{2}+\frac{H_md(d+2\rho _m)}{2\rho _m}+\frac{h_{32}d\beta }{2} +$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t\left[ \sum _{i=1}^{n}\delta _{im}\left( \frac{r_{ri}}{\sigma }\right) \right.$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left. +\sum _{i=1}^{n}\delta _{ik}\left( \frac{r_{ri}}{\sigma }\right) \right] +\sum _{i=1}^{n}D_vr_{ri}>\frac{h_{31}d\rho \beta }{2y_1^2}$$\end{document}. Proof From Eq. 51, for the real value of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document} either \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _3, \Theta _4$$\end{document} both grater than zero, or both less than zero. From the expression of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _3 = \sum _{i=1}^{n}G_{ri}+B_m+G_m+B_{31}y_1+B_{32}+(F_r+V_Td\beta )y_1+$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left\{ ec_1\alpha +ec_2(1-\alpha )\right\} (TER+TEM+TE31+TE32)$$\end{document}, it is obvious that \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\theta _3>0$$\end{document} as \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$0<\alpha <1$$\end{document}. Therefore, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _4= \frac{\sum _{i=1}^{n}H_rr_{ri}}{2}+\frac{H_md(d+2\rho _m)}{2\rho _m}-\frac{h_{31}d\rho \beta }{2y_1^2}+\frac{h_{32}d\beta }{2} +$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t\left[ \sum _{i=1}^{n}\delta _{im}\left( \frac{r_{ri}}{\sigma }\right) +\sum _{i=1}^{n}\delta _{ik}\left( \frac{r_{ri}}{\sigma }\right) \right] +\sum _{i=1}^{n}D_vr_{ri}$$\end{document} must be grater than zero. By simplifying this, one can get \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\sum _{i=1}^{n}H_rr_{ri}}{2}+\frac{H_md(d+2\rho _m)}{2\rho _m}+\frac{h_{32}d\beta }{2} +$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t\left[ \sum _{i=1}^{n}\delta _{im}\left( \frac{r_{ri}}{\sigma }\right) +\sum _{i=1}^{n}\delta _{ik}\left( \frac{r_{ri}}{\sigma }\right) \right] +$$\end{document} \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sum _{i=1}^{n}D_vr_{ri}>\frac{h_{31}d\rho \beta }{2y_1^2}$$\end{document}. \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} Proposition 1 The condition that the solution of production rate (Eq. 53) is positive if \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_md\tau +2(1-\beta )c_1>H_m'\beta \sum _{i=1}^{n}r_{ri}$$\end{document}, as \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$0<\beta <1$$\end{document}. The first-order partial derivatives and the values of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _1$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _2$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _3$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Theta _4$$\end{document}, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Gamma _i$$\end{document} and partial derivatives are given in Appendix A and Appendix B, respectively. Sufficient condition Theorem 2 The sufficient condition for optimality in the classical optimization method states that all the principal minors of the Hessian matrix are alternating in sign at the optimum value of decision variables in a profit maximization problem. In another way, the Hessian matrix should be negative definite for the global optimality of the profit function. The \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$4\times 4$$\end{document} Hessian matrix is given below:\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\begin{aligned}&H_{4\times 4}= \left[ \begin{array}{cccc} \frac{\partial ^2TP}{\partial ^2\beta } & \frac{\partial ^2TP}{\partial \beta \partial \tau } & \frac{\partial ^2TP}{\partial \beta \partial S_{p_i}} & \frac{\partial ^2TP}{\partial \beta \partial \rho _m}\\ \frac{\partial ^2TP}{\partial \tau \partial \beta } & \frac{\partial ^2TP}{\partial ^2\tau } & \frac{\partial ^2TP}{\partial \tau \partial S_{p_i}} & \frac{\partial ^2TP}{\partial \tau \partial \rho _m}\\ \frac{\partial ^2TP}{\partial S_{p_i}\partial \beta } & \frac{\partial ^2TP}{\partial S_{p_i}\partial \tau } & \frac{\partial ^2TP}{\partial ^2S_{p_i}} & \frac{\partial ^2TP}{\partial S_{p_i}\partial \rho _m}\\ \frac{\partial ^2TP}{\partial \rho _m\partial \beta } & \frac{\partial ^2TP}{\partial \rho _m\partial \tau } & \frac{\partial ^2TP}{\partial \rho _m\partial S_{p_i}} & \frac{\partial ^2TP}{\partial ^2 \rho _m}\\ \end{array}\right].&\end{aligned}$$\end{document} Proof In the proposed model, the number of distinct continuous decision variables of the profit function TP is four. Hence, the order of the Hessian matrix is four, i.e., its dimension is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$4\times 4$$\end{document}, and all the principal minors are alternate in sign. Numerically the values of all principal minors are \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{1\times 1} = -0.00556631$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{2\times 2} = 0.0578457$$\end{document}, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{3\times 3} = -1302.45$$\end{document}, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{4\times 4} = 3.353\times 10^{6}$$\end{document}. The analytical proofs of the sufficient conditions are given below: \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} Proposition 2 All first ordered principal minors of the Hessian matrix \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{4\times 4}$$\end{document} are negative at the unique values of the decision variables if \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\left[ \frac{H_md^2\tau -H_m'\beta d \sum _{i=1}^{n}r_{ri}}{2}+b_1(1-\beta )d\right] >0$$\end{document}. Proof Appendix C states the proof of this proposition. \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} Proposition 3 All second ordered principal minors of the Hessian matrix \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{4\times 4}$$\end{document} are positive at the unique values of the decision variables if \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{4a\Theta _3}{\tau ^3}>\left[ \frac{V_Tdy_1}{\tau }-\left( h_{32}+\frac{h_{31}}{y_1^2}\right) \frac{d}{2}\right] ^2$$\end{document}. Proof Appendix C gives the proof of this proposition. \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} Proposition 4 All third ordered principal minors of the Hessian matrix \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{4\times 4}$$\end{document} are negative, as values of all parameters are positive at the optimum values of all decision variables, when \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathbb {A}_1+\frac{(H_m'\beta -H_m\tau )}{\rho _m^2(x_i+2y_iS_{p_i})}\mathbb {A}_3<\mathbb {A}_2$$\end{document}, as \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$|H_{2\times 2}|>0$$\end{document}. Proof Appendix C includes the proof of it. \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} Proposition 5 All fourth ordered principal minors of the Hessian matrix \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{4\times 4}$$\end{document} are positive, as values of all parameters are positive at the optimum values of all decision variables, when \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{1}{\rho _m^2}\left[ \frac{H_md^2+H_m'\beta d\sum _{i=1}^{n} r_{r_i}+2b_1d}{2}\right] +\frac{V_Tdy_1}{\tau ^2}>b_2d+\left( h_{32}+\frac{h_{31}}{y_1^2}\right) +\left( \frac{H_m'\beta -H_m\tau }{2}\right) \mathbb {A}_3$$\end{document}, as \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$|H_{3\times 3}|<0$$\end{document}. Proof Appendix C states the proof of the proposition. \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\square$$\end{document} BSS algorithm The proposed model is a MLNLP problem, having both integer and continuous variables. The problem is solved using the following algorithm provided as follows: Step 1 Input all parameter’s values. Step 2 Give the input values of selling price, cycle length, return rate , and production rate. Step 2.1 Set initial value for container capacity \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma = 1.$$\end{document} Step 2.2 Obtain \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta ^*$$\end{document} from Eq. 50. Step 2.3 Obtain \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau ^*$$\end{document} from Eq. 51. Step 2.4 Obtain \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}^*$$\end{document} from Eq. 52i = 1, 2, . . ., n. Step 2.5 Obtain \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m^*$$\end{document} from Eq. 53. Step 2.6 Find the demand \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$r_{r_i}^*.$$\end{document} Step 2.7 Find the shipment schedule \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$T^*$$\end{document} by using following relation \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{r_{[i]}}{L_{[i]}}\ge \frac{r_{[i+1]}}{L_{[i+1]}}$$\end{document} 66 for all i = 1, 2, . . . ,n. Step 2.8 If TP(i)≥TP(i+1), go to the Step 3. Else, repeat Steps 2.1-2.7. Step 3 TP(i)* is the global maximum profit for the obtained values in Steps 2.1-2.5. Step 4 Stop. Numerical experiment A numerical example is performed to establish the numerical validation of the proposed model. In other words, it provides the convergence of the formulated profit function. The values of the parameters that are used to generate the model mathematically are accessed from the literature Kim64 regarding lightning and air handling. Parametric values of building management, common services, and machine run are taken from Tandon56, and some other parametric values are taken from Sarkar et al.58 for their best fit. These values of all parameters are listed in Table 3. However, the data taken from the literature may not be the same for the convergence issue of the formulated profit function. Mathematica 11.0 software is used to obtain the optimum results in a laptop with 64-bit Windows 11 operating system, Intel i7 processor, and 8 GB of RAM. Optimization was solved with tolerance \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$10^{-6}$$\end{document} and runtime limit 600 s. The total computation time was 0.077 s. The numerical experiment began with the same data set used in the literature mentioned earlier. A synthesis of multiple subjects generates novel attributes of the function. The convergence precision varies with the function. Moreover, not all conceptions align precisely with the literature, and comprehensive data is unavailable for novel ideas. These values are estimates based on survey results. For the numerical experiment, four retailers are selected. All four retailers buy tires from a single manufacturer for sale. The prices of new tires vary across retailers due to geographic factors, as the four retailers are situated in distinct areas. The optimum profit of the formulated problem is $66,696.70, which is provided in Table 4. Figure 5 depicts the concavity of the objective function.Table 3Input parameters for the manufacturer, retailers, and 3PL.ParametersValue (unit)ParametersValue (unit)ParametersValue (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_m$$\end{document}400 ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_m$$\end{document}80 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m$$\end{document}5.2 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m'$$\end{document}5.2 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document}50 $/unit\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document}0.005\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_r$$\end{document}10 ($/unit)Q0.95\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_Q$$\end{document}20 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$Q_r$$\end{document}0.50G65 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _3$$\end{document}24 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$M^m_{j(hp)}$$\end{document}0.39 (MW/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^m_{j(\frac{w}{blub})}$$\end{document}150 (watt/bulb)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{MS}$$\end{document}36 (MW/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _5$$\end{document}24 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$E_{CS}$$\end{document}45 (MW/m)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document}2700n4\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document}700 (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_1$$\end{document}8.0 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_2$$\end{document}7.4 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_3$$\end{document}8.2 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_4$$\end{document}8.1 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_1$$\end{document}30 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_2$$\end{document}32 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_3$$\end{document}29 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_4$$\end{document}31 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^r_{j(hp)}$$\end{document}0.5 (hp/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_1$$\end{document}5 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_2$$\end{document}5 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_3$$\end{document}6 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_4$$\end{document}5 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r1}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r2}_{j(ca)}$$\end{document}14 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r3}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r4}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{ri}_{j(ca)}$$\end{document}1 (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _1^i$$\end{document}10 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _2^i$$\end{document}10 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^r_{j}$$\end{document}25 (watt/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_1$$\end{document}0.04 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_2$$\end{document}0.02 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_3$$\end{document}0.03 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_4$$\end{document}0.04 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{1m}$$\end{document}70 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{2m}$$\end{document}90 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{3m}$$\end{document}80 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{4m}$$\end{document}75 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{31}$$\end{document}40 ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{32}$$\end{document}45 ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{31}$$\end{document},\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{32}$$\end{document}5 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _{ij}$$\end{document}10 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{31}_{j(ca)}$$\end{document}7 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{32}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F_2$$\end{document}3 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F_3$$\end{document}4 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^{3i}_{j(hp)}$$\end{document}0.5 (hp/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^{3i}_{j(\frac{w}{bulb})}$$\end{document}25 (watt)a760\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_f$$\end{document}4 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_v$$\end{document}0.5 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_{fr}$$\end{document}4 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_{vr}$$\end{document}0.3 ($/unit)p0.5 ($)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t$$\end{document}0.1 ($/container)t0.25\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$h_c$$\end{document}0.001 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}0.42\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_1$$\end{document}0.09 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_2$$\end{document}0.14 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_3$$\end{document}25 ($/unit)Table 4Optimum results of the model.Decision variablesOptimal results\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}^*$$\end{document} ($/tire)169.122, 163.940, 174.336, 169.819\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau ^*$$\end{document} (month)1.643\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta ^*$$\end{document} (rate)41\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma ^*$$\end{document} (units)45\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m^*$$\end{document} (units/unit time)1382.97Dependent variables\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$T^*$$\end{document} (retailer)(2, 3, 4, 1)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{(1, 2, 3, 4)}^*$$\end{document}( units)7, 7, 7, 7Total profit ($/cycle)66,696.70 Table 3Input parameters for the manufacturer, retailers, and 3PL.ParametersValue (unit)ParametersValue (unit)ParametersValue (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_m$$\end{document}400 ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_m$$\end{document}80 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m$$\end{document}5.2 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m'$$\end{document}5.2 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document}50 $/unit\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document}0.005\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_r$$\end{document}10 ($/unit)Q0.95\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_Q$$\end{document}20 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$Q_r$$\end{document}0.50G65 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _3$$\end{document}24 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$M^m_{j(hp)}$$\end{document}0.39 (MW/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^m_{j(\frac{w}{blub})}$$\end{document}150 (watt/bulb)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{MS}$$\end{document}36 (MW/month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _5$$\end{document}24 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$E_{CS}$$\end{document}45 (MW/m)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document}2700n4\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document}700 (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_1$$\end{document}8.0 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_2$$\end{document}7.4 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_3$$\end{document}8.2 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_4$$\end{document}8.1 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_1$$\end{document}30 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_2$$\end{document}32 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_3$$\end{document}29 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_4$$\end{document}31 ($/order)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^r_{j(hp)}$$\end{document}0.5 (hp/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_1$$\end{document}5 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_2$$\end{document}5 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_3$$\end{document}6 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$f_4$$\end{document}5 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r1}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r2}_{j(ca)}$$\end{document}14 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r3}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F^{r4}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{ri}_{j(ca)}$$\end{document}1 (unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _1^i$$\end{document}10 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _2^i$$\end{document}10 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^r_{j}$$\end{document}25 (watt/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_1$$\end{document}0.04 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_2$$\end{document}0.02 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_3$$\end{document}0.03 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$L_4$$\end{document}0.04 (month)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{1m}$$\end{document}70 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{2m}$$\end{document}90 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{3m}$$\end{document}80 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\delta _{4m}$$\end{document}75 (km)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{31}$$\end{document}40 ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{32}$$\end{document}45 ($/setup)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{31}$$\end{document},\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_{32}$$\end{document}5 ($/unit/unit time)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\zeta _{ij}$$\end{document}10 (hours/day)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{31}_{j(ca)}$$\end{document}7 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B^{32}_{j(ca)}$$\end{document}15 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F_2$$\end{document}3 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$F_3$$\end{document}4 (units)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^{3i}_{j(hp)}$$\end{document}0.5 (hp/hour)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^{3i}_{j(\frac{w}{bulb})}$$\end{document}25 (watt)a760\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_f$$\end{document}4 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_v$$\end{document}0.5 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_{fr}$$\end{document}4 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_{vr}$$\end{document}0.3 ($/unit)p0.5 ($)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_t$$\end{document}0.1 ($/container)t0.25\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$h_c$$\end{document}0.001 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}0.42\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_1$$\end{document}0.09 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_2$$\end{document}0.14 ($/unit)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_3$$\end{document}25 ($/unit) Input parameters for the manufacturer, retailers, and 3PL. Table 4Optimum results of the model.Decision variablesOptimal results\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}^*$$\end{document} ($/tire)169.122, 163.940, 174.336, 169.819\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau ^*$$\end{document} (month)1.643\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta ^*$$\end{document} (rate)41\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma ^*$$\end{document} (units)45\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m^*$$\end{document} (units/unit time)1382.97Dependent variables\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$T^*$$\end{document} (retailer)(2, 3, 4, 1)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$C_{(1, 2, 3, 4)}^*$$\end{document}( units)7, 7, 7, 7Total profit ($/cycle)66,696.70 Optimum results of the model. Fig. 5Graphical representation to represent the concavity of the total profit function with respect to different decision variables. Graphical representation to represent the concavity of the total profit function with respect to different decision variables. Special cases This subsection contain some special cases related to this study on tire industry. All the special cases are described one after another. Analyzing the importance of smart energy for sustainability in the CLSCM The combination of conventional and renewable energy is called smart energy. Smart energy is reliable and economical because it utilises renewable energy. A lot of energy is used in the tire industry for production, building management, and lighting. As a result, energy prices significantly affect the system’s profit. The total profit of the system is $61,759.40 for 100% use of conventional energy and $66,696.70 for 42% use of smart energy. Therefore, the results suggest that the system will be more profitable to use smart energy rather than conventional energy. The optimal values of other variables are \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m = 1,437.39$$\end{document} units/unit time, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta = 41$$\end{document}%, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_1} = 170.12$$\end{document} ($/unit), \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_2} = 164.93$$\end{document}, ($/unit), \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_3} = 175.34$$\end{document} ($/unit), \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_4} = 170.82$$\end{document} ($/unit), \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau = 1.80$$\end{document} months. A comparison with the proposed problem is shown in Fig. 6a. Smart energy use can reduce or manage the enormous emissions produced by traditional energy. The present study indicates that 81.27 tons of carbon are emitted per cycle in a conventional energy supply chain from a tire supply chain. However, using 42% smart energy reduces emissions to 47.14 tons per cycle. Thus, the analysis shows that smart energy is profitable for the industry and the environment. Pure production versus manufacturing-remanufacturing: A numerical insight Pure production is the process in which the manufacturer produces finished products using only raw materials. This section includes an in-depth analysis to determine if a pure production or a hybrid (manufacturing-remanufacturing) approach is preferable. This section presents four cases for comparison with the proposed approach. The first one is pure production, i.e., remanufacturing is not considered, and in this case, the total profit is $62,226.30/cycle. The second one is that the manufacturer performed a hybrid production strategy in which the remanufacturing rate is fixed, and the total profit is $65,919.50/cycle. In the third case, the production rate is fixed, but the remanufacturing rate is variable, and in this case, the total profit is $65,877.10/cycle. The last one, where the manufacturing and remanufacturing are fixed, and the total profit is $66,207.40/cycle. The results suggest that the total profit in a hybrid approach with variable manufacturing and remanufacturing is the highest and globally optimal. The total profit in this policy is $66,696.70 per cycle. The results for the variables and total profit across all approaches are given in Table 5. As a result of the findings, an integrated strategy is more beneficial than a pure manufacturing plan. A comparative study with the original problem is attached in Fig. 6b.Table 5Optimum results of the pure and hybrid production models.ModelsReturn rate (%)Selling price ($/unit)Cycle timeProduction rate (unit/unit time)Container capacity (units)Total profit ($/cycle)Pure0172.12, 166.931.811,296.234562,226.30177.33, 172.81FixedFixed169.63, 164.451.671,360.904565,919.50remanufacturing174.85, 170.33Fixed40169.34, 164.151.69Fixed4565,877.10production174.56, 170.04BothFixed169.46, 164.281.64Fixed4566,207.40fixed174.67, 170.16 Table 5Optimum results of the pure and hybrid production models.ModelsReturn rate (%)Selling price ($/unit)Cycle timeProduction rate (unit/unit time)Container capacity (units)Total profit ($/cycle)Pure0172.12, 166.931.811,296.234562,226.30177.33, 172.81FixedFixed169.63, 164.451.671,360.904565,919.50remanufacturing174.85, 170.33Fixed40169.34, 164.151.69Fixed4565,877.10production174.56, 170.04BothFixed169.46, 164.281.64Fixed4566,207.40fixed174.67, 170.16 Optimum results of the pure and hybrid production models. Fig. 6Pictorial representation of special cases. Pictorial representation of special cases. Economic sustainability under price volatility in the CLSCM In this case, the importance of price volatility is explained. In the study, a price-dependent variable demand is established. If the price is fixed, then the scenario is defined in this case. The parametric values are similar to the original problem, only the price of products are fixed and taken as \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_1}$$\end{document}=$167 per unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_2}$$\end{document}= $170 per unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_3}$$\end{document}= $165 per unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_4}$$\end{document}= $158 per unit. Then, the unique values of other variables are \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta$$\end{document}= 31%, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma$$\end{document} = 45 units, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau$$\end{document} =1.62 months, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m$$\end{document} = 1360.99 unit/unit time, and STP = $64,133.20 per cycle. A comparative study is given in the Fig. 6c. The comparison indicates price volatility is always profitable rather than fixed price of the tire. Analyzing the relation between carbon emissions and remanufacturing Environmental and financial considerations are integral to the rapid evolution of the remanufacturing business. Emissions from transportation in the reverse supply chain, along with the per-unit cost of those emissions, are challenges remanufacturing activities face. If the manufacturer increases remanufacturing of EOL tires, the number of transportation trips to collect EOL tires from end consumers increases, and therefore the associated emissions. According to government rules, industries often take steps to increase revenue while protecting the environment. A relation between remanufacturing and carbon cost is established in Fig. 6d. The figure shows a trade-off between the unit carbon cost and the remanufacturing rate of EOL tires. The proposed model determines the optimal remanufacturing rate for a given carbon cost. Field study: an industrial viewpoint This section presents an industrial case study to validate the developed model robustly. The actual data volunteered by the Indian tire manufacturing industry was used to assess the reliability of the present work in a real-world setting. The company is glad to work together to complete this research work efficiently. Several parameters are adjusted as needed to improve the model’s convergence. The industry provided the values of the real data with their consent. The parametric values for this case study are \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_m$$\end{document} = 350 $/setup, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$G_m$$\end{document} = 60 $/order, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m$$\end{document} = 6 $/unit/unit time, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_m'$$\end{document} = 6 $/unit/unit time, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_r$$\end{document} = 29 $/unit, a = 150, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$c_Q$$\end{document} = 18 $/unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$Q_r$$\end{document} = 0.45, G = 50 $/unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_v$$\end{document} = 0.3 $/unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_{vr}$$\end{document} = 0.1 $/unit, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P^m_{j(\frac{w}{blub})}$$\end{document} = 75 (watt/bulb), \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{31}$$\end{document} = 35 $/setup, t = 0.5, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$H_i$$\end{document} = 9 $/unit/unit time, \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document} = 695 units, and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$B_{32}$$\end{document} = 38 $/setup. From the industrial viewpoint, four cases were studied. All these cases are discussed one by one. The tire manufacturing industry follows a policy of not using smart energy; i.e., it uses 100% traditional energy (Case I). The overall profit of the system in Case I is $59,327.30 per cycle. Now, based on data collected from the industry, we conducted a few experiments. The first experiment with these data (Case II) included a flexible production system under smart energy consumption, but the manufacturer did not include the remanufacturing option (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta = 0$$\end{document}). In this case, the total profit of the system is $61,457.30 per cycle. The next one, i.e., Case III, extended the previous case with a fixed remanufacturing rate of 38%. The total profit in this case is $62,640.90 per cycle. Case IV considered fixed manufacturing and fixed remanufacturing, and the profit is $62,609.40/cycle. But, if the industry aligns with the proposed policies in this study, then the system makes a total profit of $64,225.60 per cycle. From Table 6, one can see the best result from the case study performed using the organization’s data. Table 7 provides a comparative study of the system’s total profit across different cases in the case study. One can easily see from Table 7 that the study that considers smart energy consumption, variable demand, and a flexible production system with variable remanufacturing and variable selling price provides the best result. This is the case because, among all cases, the proposed strategy yields the maximum profit when the industry adopts a hybrid production strategy; therefore, the company was happy to accept our proposed approach.Table 6Optimum results of the field study.Decision variablesOptimal results\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}^*$$\end{document} ($/unit)170.24, 165.05, 175.44, 170.92\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau ^*$$\end{document} (month)1.70\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta ^*$$\end{document} (rate)0.40\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma ^*$$\end{document} (units)45\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m^*$$\end{document} (units/unit time)1354.88Total profit ($/cycle)64,225.60Table 7Profit comparison among different case studies.Case ICase IICase IIICase IVThis model59,327.30 ($/cycle)61,457.30 ($/cycle)62,640.90 ($/cycle)62,609.40 ($/cycle)64,225.60 ($/cycle) Table 6Optimum results of the field study.Decision variablesOptimal results\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$S_{p_i}^*$$\end{document} ($/unit)170.24, 165.05, 175.44, 170.92\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\tau ^*$$\end{document} (month)1.70\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta ^*$$\end{document} (rate)0.40\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\sigma ^*$$\end{document} (units)45\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\rho _m^*$$\end{document} (units/unit time)1354.88Total profit ($/cycle)64,225.60 Optimum results of the field study. Table 7Profit comparison among different case studies.Case ICase IICase IIICase IVThis model59,327.30 ($/cycle)61,457.30 ($/cycle)62,640.90 ($/cycle)62,609.40 ($/cycle)64,225.60 ($/cycle) Profit comparison among different case studies. Discussion This part discusses the obtained results, a comparative study with existing literature, discussion about most sensitive parameters, and some critical information for managers. Result discussion A manufacturing-remanufacturing-based sustainable three-echelon closed-loop TSCM is formulated to assess the value of smart energy in the presence of a manufacturer, a 3PL, and four retailers. A numerical illustration of the original problem and three specific scenarios are explored to validate the model. One of the tire business’s most essential and costly aspects is energy use for manufacturing and inventory management. The numerical results show that incorporating smart energy can boost total profit while reducing environmental impact. Based on the infrastructure and smart tools used to implement smart energy, the outcome demonstrates that implementing smart energy in part (42%) optimises overall profit by 7.40%. However, resources like coal are preserved, and emissions are reduced by 41.99% when smart energy is used instead of conventional energy. Figure 7 depicts the change in total profit and emissions when the percentage of smart energy is changed between the range 0 and 1. This result is obtained by fixing all decision variables listed in Table 4. From Fig. 7, one noticeable thing is that the rate of increase of profit declines with the rise of the rate of declining emissions due to the use of smart energy. This relation shows a clear trade-off between emissions and profit of the SCM.Fig. 7Pictorial representation of the change of profit and emissions due to he change in percentage of smart energy. Pictorial representation of the change of profit and emissions due to he change in percentage of smart energy. Eco-efficiency frontire basically represents a trade-off between economic performance and environmental benefits. In the context of the proposed study, it describes the trade-off between profit and emissions reduction from SCM with changes in the proportion of smart energy. Specifically, the study highlights that as the proportion of smart energy increases, the profit of the SCM increases along with reduced emissions. As both the profit and the environmental benefits enhances with the increase of smart energy share, this model describes that the proper adaptation of smart energy pushes the eco-efficiency frontier outward. The EOL tires in the landfill discharge toxins into the air, water, and land, destroying the ecology and releasing deadly black smoke into the air whenever they catch fire (https://ecogreenequipment.com/environmental-impacts-of-waste-tire-disposal/ accessed at 14:57 IST on 14-05-2023). The remanufacturing of scrap tires reduces the detrimental environmental impact and protects natural resources. The numerical results demonstrate that a hybrid manufacturing-remanufacturing approach reduces the volume of waste tires and increases total profit by 16.44% compared to a pure manufacturing policy. However, in the proposed study, the manufacturer reduces waste by remanufacturing EOL tires. The efficiency of waste reduction is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\text{ Remanufacturing } \text{ volume }}{\text{ Total } \text{ volume } \text{ produced }}$$\end{document}. Since the remanufacturing rate is equivalent to the collection rate, the efficiency of the manufacturer in waste reduction is \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\frac{\alpha Q}{Q}=\alpha =\ 41\%$$\end{document}. This discussion shows that the hybrid strategy is efficient at increasing profits by 6.70% and reducing waste by 41%. The hybrid strategy with variable remanufacturing yields the model’s global best performance. In the proposed CLSC model, tire remanufacturing increases the number of transports and, consequently, the associated carbon emissions. The proposed model incorporates carbon-emissions prices alongside transportation costs to support sustainability goals. The carbon cost associated with transportation and the remanufacturing rate are inverse. That is, an increase in carbon cost will reduce the remanufacturing volume. The relation is presented in Fig. 6d. The on-time supply of finished tires and the maintenance of an appropriate delivery sequence are of the utmost importance for the manufacturer and all retailers whenever RTI is used for transportation. The ideal delivery sequence is profoundly affected by store lead time. Consequently, Retailer 2, with the lowest demand, receives replenishment first because it has the shortest lead time. Retailers’ lead time is essential when using RTI for tire transportation in SCM. Otherwise, the seller’s demand chooses the most effective delivery schedule. After receiving the scheduled delivery, retailers sell tires. Retailers offer tires at variable prices to the market. Numerically, it has been found that price volatility yields 5.98% more profit than a fixed price. The proposed CLSC model supports sustainability by increasing profits through variable pricing, reducing emissions, and conserving resources through smart energy and remanufacturing. In the study, the manufacturer delivers final products to all retailers according to a delivery schedule aligned with retailers’ lead times and demand. This approach improves the flexibility and efficiency of the proposed SCM compared to a traditional supply chain. In a traditional SCM, the manufacturer often relies on fixed schedules or bulk shipments, leading to retailers’ overstocking and increased holding costs, or delayed shipments. However, the numerical findings of this study show that if the manufacturer does not follow the delivery schedule by following retailers’ lead time, then the total profit of the SCM is $66,156.40 per cycle, which is almost 0.81% less than the profit of the proposed model. Moreover, the selling price $(169.41, 164.15, 174.50, 169.92)/unit and cycle time (1.646 months) are slightly increased, while the production rate (1382.67 units/unit time) decreased. Therefore, the numerical evaluation indicates that the proposed method is superior to the traditional one. Comparative study In this section, the proposed study is compared with the existing literature. Table 8 represents the comparison with literature both numerically and theoretically by showing key contribution to the literature. In the numerical comparison, one can see that our model gives the best result in comparison with the others.Table 8Comparison with existing literature.Sarkar et al.58Iqbal et al.11Sarkar et al.67This modelEnergy consumptionNot consideredTraditional energyRenewable energySmart energyDemandFixedFixedPrice-dependentPrice-dependentlinear demandquadratic demandManufacturingTraditionalTraditionalVariableVariableRemanufacturingVariableRecycle packaging materialNot consideredVariableEmissionsTransportationNot consideredConsideredConsidered(energy, transportation)Delivery scheduleConsideredNot consideredNot consideredConsideredProfit ($)Cost minimizationCost minimization8,525.47 per cycle66,696.70 per cycleSarkar et al.58 invented a closed-loop SCM under RTI management to lessen environmental impact. In their model, they determined the optimal delivery schedule, cycle time, and lot size for retailers. They minimize the total cost of the CLSC management. While the proposed study optimizes total profit, it emphasizes the importance of smart energy in optimizing profit and reducing emissions in a tire CLSCM. Moreover, the study found that a hybrid manufacturing-remanufacturing policy is best under variable production and variable demand. Sarkar et al. Sarkar et al.58 considered carbon emissions from transportation only, but the current study shows how emissions can be reduced through smart energy.Both Iqbal et al.11 and the proposed studies examine sustainability in supply networks; however, they differ in focus, structure, and environmental strategies. Iqbal et al.11 advocates a zero-waste strategy for green supply chain management, proposing a three-tier primary–secondary–closed-loop system designed to eliminate waste by transforming spoiled food into secondary products and recycling packaging materials. Along with these, they aimed to reduce energy use through optimal cycle times. But the proposed model, smart energy–enabled three-echelon CLSCM for tires, focuses on minimizing carbon emissions and enhancing profitability by integrating smart energy, price-dependent demand, carbon tax regulations, and variable manufacturing-remanufacturing. Iqbal et al.11 focuses on waste reduction and energy efficiency in food supply chains. In contrast, this study underscores the importance of emission reduction, smart energy utilization, and profitability in tire manufacturing, illustrating complementary yet distinct approaches to sustainable supply chain management.Sarkar et al.67 developed a smart sustainable production model for multi-type bio-fuel under a flexible production system, inspection, and price-dependent variable demand. They had used renewable energy for air handling and lighting in the manufacturing sector for inventory management. While the current model is developed with a three-echelon supply chain for tires, this study examines the importance of smart energy in production for manufacturers and in inventory management for each player. Moreover, the study found that a hybrid manufacturing-remanufacturing policy is best under variable production, variable demand, and optimal delivery scheduling. Sarkar et al.67 did not consider carbon emissions in their model, but the current model, which studies emissions from transportation under a carbon tax policy, shows how emissions can be reduced with smart energy. Table 8Comparison with existing literature.Sarkar et al.58Iqbal et al.11Sarkar et al.67This modelEnergy consumptionNot consideredTraditional energyRenewable energySmart energyDemandFixedFixedPrice-dependentPrice-dependentlinear demandquadratic demandManufacturingTraditionalTraditionalVariableVariableRemanufacturingVariableRecycle packaging materialNot consideredVariableEmissionsTransportationNot consideredConsideredConsidered(energy, transportation)Delivery scheduleConsideredNot consideredNot consideredConsideredProfit ($)Cost minimizationCost minimization8,525.47 per cycle66,696.70 per cycle Comparison with existing literature. Sarkar et al.58 invented a closed-loop SCM under RTI management to lessen environmental impact. In their model, they determined the optimal delivery schedule, cycle time, and lot size for retailers. They minimize the total cost of the CLSC management. While the proposed study optimizes total profit, it emphasizes the importance of smart energy in optimizing profit and reducing emissions in a tire CLSCM. Moreover, the study found that a hybrid manufacturing-remanufacturing policy is best under variable production and variable demand. Sarkar et al. Sarkar et al.58 considered carbon emissions from transportation only, but the current study shows how emissions can be reduced through smart energy. Sarkar et al.58 invented a closed-loop SCM under RTI management to lessen environmental impact. In their model, they determined the optimal delivery schedule, cycle time, and lot size for retailers. They minimize the total cost of the CLSC management. While the proposed study optimizes total profit, it emphasizes the importance of smart energy in optimizing profit and reducing emissions in a tire CLSCM. Moreover, the study found that a hybrid manufacturing-remanufacturing policy is best under variable production and variable demand. Sarkar et al. Sarkar et al.58 considered carbon emissions from transportation only, but the current study shows how emissions can be reduced through smart energy. Both Iqbal et al.11 and the proposed studies examine sustainability in supply networks; however, they differ in focus, structure, and environmental strategies. Iqbal et al.11 advocates a zero-waste strategy for green supply chain management, proposing a three-tier primary–secondary–closed-loop system designed to eliminate waste by transforming spoiled food into secondary products and recycling packaging materials. Along with these, they aimed to reduce energy use through optimal cycle times. But the proposed model, smart energy–enabled three-echelon CLSCM for tires, focuses on minimizing carbon emissions and enhancing profitability by integrating smart energy, price-dependent demand, carbon tax regulations, and variable manufacturing-remanufacturing. Iqbal et al.11 focuses on waste reduction and energy efficiency in food supply chains. In contrast, this study underscores the importance of emission reduction, smart energy utilization, and profitability in tire manufacturing, illustrating complementary yet distinct approaches to sustainable supply chain management. Both Iqbal et al.11 and the proposed studies examine sustainability in supply networks; however, they differ in focus, structure, and environmental strategies. Iqbal et al.11 advocates a zero-waste strategy for green supply chain management, proposing a three-tier primary–secondary–closed-loop system designed to eliminate waste by transforming spoiled food into secondary products and recycling packaging materials. Along with these, they aimed to reduce energy use through optimal cycle times. But the proposed model, smart energy–enabled three-echelon CLSCM for tires, focuses on minimizing carbon emissions and enhancing profitability by integrating smart energy, price-dependent demand, carbon tax regulations, and variable manufacturing-remanufacturing. Iqbal et al.11 focuses on waste reduction and energy efficiency in food supply chains. In contrast, this study underscores the importance of emission reduction, smart energy utilization, and profitability in tire manufacturing, illustrating complementary yet distinct approaches to sustainable supply chain management. Sarkar et al.67 developed a smart sustainable production model for multi-type bio-fuel under a flexible production system, inspection, and price-dependent variable demand. They had used renewable energy for air handling and lighting in the manufacturing sector for inventory management. While the current model is developed with a three-echelon supply chain for tires, this study examines the importance of smart energy in production for manufacturers and in inventory management for each player. Moreover, the study found that a hybrid manufacturing-remanufacturing policy is best under variable production, variable demand, and optimal delivery scheduling. Sarkar et al.67 did not consider carbon emissions in their model, but the current model, which studies emissions from transportation under a carbon tax policy, shows how emissions can be reduced with smart energy. Sarkar et al.67 developed a smart sustainable production model for multi-type bio-fuel under a flexible production system, inspection, and price-dependent variable demand. They had used renewable energy for air handling and lighting in the manufacturing sector for inventory management. While the current model is developed with a three-echelon supply chain for tires, this study examines the importance of smart energy in production for manufacturers and in inventory management for each player. Moreover, the study found that a hybrid manufacturing-remanufacturing policy is best under variable production, variable demand, and optimal delivery scheduling. Sarkar et al.67 did not consider carbon emissions in their model, but the current model, which studies emissions from transportation under a carbon tax policy, shows how emissions can be reduced with smart energy. Sensitivity analysis This section describes the sensitivity analysis of some crucial parameters. The performance of the sensitivity analysis helps understand the robustness of the proposed model and how changes in input parameters affect the total profit of the formulated profit function. The proposed model assesses sensitivity to changes in input parameters of ±50% and ±25%. Analyzing different parameters is very helpful for business organizations in making informed decisions on the use of smart energy, flexible production, inventory management, pricing, and other effective choices. However, the sensitivity of the three players’ crucial parameters is shown below, and the observations are discussed. Sensitivity analysis for retailers’ parameters In this part of the sensitivity analysis, some crucial parameter of the retailer are analyzed to revel their impact on the total profit of the system (Fig. 8). Analysis of demand parameters Demand forecasting for any SCM is very important. Accurate forecasting can allow the retailer to manage inventory levels within its capacity, avoiding overstock or stockouts. Demand changes for various reasons; price is one of them. Further, the initial market demand parameter is very sensitive to profit maximization. Now, a 50% decrease in initial demand results in a 28.68% reduction in total profit and an increase in the same influence of total profit by 28.68%. For the change of the parameter by ±25%, the total profit changes by \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$+$$\end{document}10.71% and −10.72%, respectively (Fig. 8a). The price transformation factor in the demand function is another sensitive parameter for changes in total profit. The modification in this factor (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x_i$$\end{document}) by ±50% implies that the total profit changes −2.13% and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$+$$\end{document}2.13%, respectively (Fig. 8b). Analysis of holding cost and lead time parameter The retailer stores products after receiving them from the manufacturer and keeps them until all products are sold out. In that case, if the unit holding cost changes drastically, then the overall expenses and hence the profit will be affected by this. For this model, it was found that if the unit holding cost rises by 50%, the profit decreases to 5.81%, and a 50% decrease in unit holding cost results in an increase in total profit of 5.82% (Fig. 8b). The other crucial parameter is the retailer’s lead time. If the lead time, i.e., the time between placing an order and receiving it, is increased, then demand may decrease and hence profit. In this model, it was found that if the lead time increased by 50%, the total profit decreased by 0.37%, and decreasing the lead time by 50% increased the total profit by 0.37% (Fig. 8d). Analysis of ordering cost and energy consumption related parameter This part of the sensitivity analysis discusses the effects of the ordering cost factor and the energy consumption parameter for light and air handling. For the change in the retailer’s ordering cost by ±50%, the total profit of the supply chain changes symmetrically by ±0.05%. Again, if one changes the retailer’s lighting energy consumption parameter by ±50%, the SCM profit changes by ±0.02%. Whereas, for the change in the energy consumption parameter of the air handling by ±50% and ±25%, the supply chain profit changes by ±0.12% and ±0.05%, respectively. A graph for the same can be found in Fig. 8c.Fig. 8Graphical representation of sensitivity analysis of different parameter of retailers. Graphical representation of sensitivity analysis of different parameter of retailers. Sensitivity analysis for the manufacturer’s parameters This part analyzes the manufacturer’s parameters to show their sensitivity to the total profit of the supply chain. The graphical representation is given in Fig. 9 Analysis of energy related parameter In any production system, one of the most crucial requirements is energy for tasks such as machine operation, building management, air handling, common services, and others. Now, the change in energy consumption across tasks has a different impact on total profit. Like energy consumption, the price per unit of energy has a crucial effect on total profit as well. The analysis found that the energy consumption for production is the most sensitive parameter. Numerically, it was observed that if consumption increased by 50%, the total profit decreased by 12.75%, and if consumption decreased by 50%, the total profit increased by 15.55% (Fig. 9e). If the consumption for lighting, BMS, and common services changes by ±50%, the total profit changes almost the same in both directions, which are almost 2% in each case (Fig. 9d). The other crucial parameter is the price of renewable energy per unit. The decrease in renewable energy cost by 50% shows an increase in the profit by 3.45%, and an increase of per unit cost declines the profit by 3.63% (Fig. 9b). Analysis of production related parameter In an SCM, unit production cost and an efficient manufacturing setup with a variable production rate significantly affect SCM profit. The variability in the manufacturing setup can respond to changing market demand by adjusting the manufacturing rate. The unit manufacturing cost under the variable production system varies with raw material costs, development, and tool/die costs. The analysis shows that profit decreased by 24.77% when raw material costs increased by 50% and raw material expenses decreased by 50%, resulting in a 26.94% increase in total profit. For the change in raw material expenses by ±25%, the total profit changes by −12.66% and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$+$$\end{document}3.20%, respectively (Fig. 9f). The next sensitive parameter related to production is the tool/die cost. The reduction of this cost by 50% implies the increase of the total profit by 4.26%, and the profit decreased to 3.19% when the value of the tool/die component increased by 50% (Fig. 9b). The development cost parameter is another sensitive parameter. The profit decreases by 1.02% and increases by 1.05% for the change by 50% and −50% (see Fig. 9a). The remanufacturing rate for remanufactured EOL product is variable and equivalent to the collection rate. Now, the change in remanufacturing costs has a crucial impact on the total profit of the SCM. Analysis found that due to the change in remanufacturing cost by ±50%, the total profit changed by −3.57% and 3.62%, respectively (Fig. 9b). Analysis of holding cost related parameter In the proposed model, the manufacturer remanufactures EOL products along with the production of new products. Therefore, the manufacturer needs to store both new products and EOL products. In that case, a change in unit product holding cost may significantly affect total profit. The analysis found that, when the per-unit holding cost of both EOL and new products increased by 50%, the total profit decreased to 1.02% and 9.55%, respectively. On the other hand, if the per-unit holding cost decreases by 50%, the total profit increases by 1.01% and 11.72%, respectively. The graphical representations for both analyses are depicted in Figs. 9a, e. Analysis of ordering and setup cost related parameter In the manufacturer’s production process within an SCM, setting up a smooth, effective production system is crucial. In that case, the setup cost parameter is very effective for a profitable SCM. An increase in this parameter by 50% reduces the total profit by 0.17%, whereas a 50% decrease in this cost parameter implies an increase in the total profit by 0.17% (Fig. 9c). Therefore, the setup cost parameter is highly sensitive, and supply chain managers should carefully determine setup costs. Ordering expenses for the retailer are another essential factor with a significant impact on supply chain profitability. The analysis shows that if the ordering cost is reduced by 50%, the total profit increases to 0.03%, and if the value of the ordering cost is increased by 50%, the total profit increases to 0.03% (Fig. 9c).Fig. 9Graphical representation of sensitivity analysis of different crucial parameters of the manufacturer. Graphical representation of sensitivity analysis of different crucial parameters of the manufacturer. Sensitivity analysis for 3PLs parameter and smart energy parameter The variation in total profit for the change in some key parameter of 3PLs are analyzed here. The graphical representation is given in Fig. 10 Analysis of smart energy parameter The model is developed to assess the efficiency of smart energy, a combination of traditional and renewable energy. Because the prices per unit of traditional and renewable energy differ, the change in the percentage of renewable energy has a significant impact on total profit. The model found that 42% use of smart energy provided the optimal result. Now, if all players of the supply chain use 50% less smart energy, then the total profit decreases to 3.45% and the increase of the same by 50% leads the total profit to 3.63% (Fig. 10d). Analysis of holding and collection cost parameter During the collection of EOL products, 3PL incurs per-unit collection costs, and after collection, 3PL stores them before sending them to the manufacturer. If end consumers demand more to sell EOL tires, how does that affect the system’s profit? The analysis revealed that a 50% increase in collection costs leads to a total profit of −2.86%, and if the 3PL manages to pay 50% to end consumers, the total profit rises to 2.89% (Fig. 10a). The other sensitive parameter is the per-unit holding cost of EOL products. The results showed that a 50% change in unit holding cost leads to a 1.46% change in total profit (Fig. 10a). Analysis of transportation and emissions related parameter In the proposed CLSCM for tires, the involved 3PLs collect EOL tires, transport them to the manufacturer, and provide the manufacturer with a container for delivering final products to all retailers. Throughout this process, transportation is handled by 3PLs. The increase in transportation leads to increased emissions, which implies an increase in total cost68. The sensitivity analysis found that, with fixed and variable transportation costs rising by 50%, total profit decreases by 0.37% and 0.06%, respectively. The decrease of the same by 50% argues that the total profit increases by 0.38% and 0.06% respectively. Like transportation cost, the change in variable emissions cost by ±50%, the total profit changes symmetrically by 0.71%. Graphically, these are represented in Figs. 10b, c.Fig. 10Graphical representation of sensitivity analysis of 3PL and the use of smart energy consumption. Graphical representation of sensitivity analysis of 3PL and the use of smart energy consumption. The model is developed with approximately 120 parameters, but not all of them have a significant impact on the study’s outcome. Some parameters, such as the ith retailer’s order quantity (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$P_i$$\end{document}) and the manufacturer’s lot size (q), are dependent variables. Furthermore, the parameters used for energy consumption due to the use of fan, light, machine, BMS, hours of lighting usage, and common services, and the parameters used for the number of bulbs and fans used by the retailers, manufacturer, and 3PLs and the distance between nodes of the CLSCM actually these parameters ensure structural completeness of the mathematical model and these parameters have negligible impact on the outcome of the proposed study. In addition to these parameters, after thorough investigation of the model through sensitivity analysis, we categorised the parameters into two groups: those with a strong influence on the outcome and those with moderate influence. The parameters with strong influence are the proportion of smart energy used (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha$$\end{document}), the price of renewable and traditional energy (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_1$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ec_2$$\end{document}), raw material cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_0$$\end{document}), development cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_1$$\end{document}), tool/die cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$b_2$$\end{document}), initial demand (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\Delta _i$$\end{document}), scalling parameter of price (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x_i$$\end{document} and \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$y_i$$\end{document}), and fixed and variable emissions cost (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$D_f,~ D_v,~D_{vr},~D_{fr}$$\end{document}) parameters. The parameters with moderate influence on the outcome are the setup cost and holding cost for all players involved in the CLSCM, transportation cost, and the scale parameter related to container management. Computational complexity of the problem The proposed model is developed with a manufacturer, 3PL, and multiple retailers to maximize the overall profit. The developed profit function is a mixed integer non linear function. The computational complexity of the formulated problem increases non polynomially with the increases of the number of the decision variables. In the model the number of continuous decision variables is moderate, which are selling price, production rate, collection rate, and cycle time and one integer variable, which is container capacity. Therefore the computational complexity is manageable for medium and large size systems. Furthermore the convergence of the formulated function is achieved using Mathematica 11.0 software. The scalability of the model is tested through the discussion of the sensitivity analysis of the profit function for different parameter used to formulate the model. The sensitivity was performed with a range of \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$-50$$\end{document}% to \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$+50$$\end{document}% with a step size of 25%. The sensitivity analysis discusses the stable convergence of the model. For the larger industrial system which involves many retailer or multiple products, the computational duration may increase with the increase of retailers. However the growth of this time complexity remains tractable for large size systems like involving 10 to 20 retailers under modern computational platforms. Managerial insights This section provides some points for the industry managers by analyzing the result of this extensive research. Energy is one of the backbones of production and inventory management in the tire SCM. As a result, it is an essential responsibility for the manager to maximize profits through effective energy management. Smart energy is cost-effective and ecologically beneficial since it combines traditional and renewable energy. As a result, for smart energy consumption following the proposed policy, profit increased by up to 12.7%, and emissions were reduced by up to 41.98%. Therefore, managers should follow the proposed policy to maximize total profits and minimize emissions.Following numerical research, the energy cost for lighting and air handling significantly impacts the system’s profit. Reducing costs in these two scenarios is undoubtedly an essential challenge for managers. In building management services like air conditioning, heating, ventilation, and lighting, the introduction of automation can reduce energy consumption by up to 25% to 50% and hence the total cost regarding energy consumption69. Therefore, installing a motion sensor can automate lighting and air conditioning systems. Automating lighting and air conditioning systems may reduce energy consumption costs while increasing profit. Consequently, tire supply chain management managers should automate lighting and air conditioning systems by installing motion sensors.SCM managers have a dilemma when establishing a suitable production strategy. The numerical findings of the presented model show that a hybrid manufacturing-remanufacturing method reduces the volume of waste tires and increases overall profit more than a pure manufacturing policy. The hybrid strategy has two options: fixed remanufacturing and variable remanufacturing. The hybrid strategy with variable remanufacturing yields the model’s global best performance. The SCM managers should follow the proposed model to maximize their profit.The discussion of the results of the proposed model indicates that there are several scopes for the Governments to implement policies which can accelerate the transition toward sustainable and energy-efficient closed-loop supply chain. The Government may introduce subsidy policy for the use of renewable energy, which can be economically attractive for the SCM players in increasing the percentage of renewable energy share in the smart energy. Along with the policy makers can increase the investment in the improvement of smart grid and digital infrastructure, which may effectively reduce the operational barriers and enhance the reliability of smart energy integration for the SCM players. Further the Government or the policy makers can provide the incentives to support the green transportation system such as electric fleet adoption, fuel-efficient routing technologies. These green initiatives can effective in reducing emissions in both forward and reverse SCM from the transportation sections.The optimum delivery sequence for a store indicates the significance of the retailer’s lead time. Consequently, Retailer 2, with the lowest demand, gets a replenishment first since it has the shortest lead time. Retailers’ lead time is essential when using returnable transport items (RTI) for tire transportation in SCM. Otherwise, the seller’s demand chooses the most effective delivery schedule. However, while using RTI, managers must consider retailer demand and lead time. Energy is one of the backbones of production and inventory management in the tire SCM. As a result, it is an essential responsibility for the manager to maximize profits through effective energy management. Smart energy is cost-effective and ecologically beneficial since it combines traditional and renewable energy. As a result, for smart energy consumption following the proposed policy, profit increased by up to 12.7%, and emissions were reduced by up to 41.98%. Therefore, managers should follow the proposed policy to maximize total profits and minimize emissions. Energy is one of the backbones of production and inventory management in the tire SCM. As a result, it is an essential responsibility for the manager to maximize profits through effective energy management. Smart energy is cost-effective and ecologically beneficial since it combines traditional and renewable energy. As a result, for smart energy consumption following the proposed policy, profit increased by up to 12.7%, and emissions were reduced by up to 41.98%. Therefore, managers should follow the proposed policy to maximize total profits and minimize emissions. Following numerical research, the energy cost for lighting and air handling significantly impacts the system’s profit. Reducing costs in these two scenarios is undoubtedly an essential challenge for managers. In building management services like air conditioning, heating, ventilation, and lighting, the introduction of automation can reduce energy consumption by up to 25% to 50% and hence the total cost regarding energy consumption69. Therefore, installing a motion sensor can automate lighting and air conditioning systems. Automating lighting and air conditioning systems may reduce energy consumption costs while increasing profit. Consequently, tire supply chain management managers should automate lighting and air conditioning systems by installing motion sensors. Following numerical research, the energy cost for lighting and air handling significantly impacts the system’s profit. Reducing costs in these two scenarios is undoubtedly an essential challenge for managers. In building management services like air conditioning, heating, ventilation, and lighting, the introduction of automation can reduce energy consumption by up to 25% to 50% and hence the total cost regarding energy consumption69. Therefore, installing a motion sensor can automate lighting and air conditioning systems. Automating lighting and air conditioning systems may reduce energy consumption costs while increasing profit. Consequently, tire supply chain management managers should automate lighting and air conditioning systems by installing motion sensors. SCM managers have a dilemma when establishing a suitable production strategy. The numerical findings of the presented model show that a hybrid manufacturing-remanufacturing method reduces the volume of waste tires and increases overall profit more than a pure manufacturing policy. The hybrid strategy has two options: fixed remanufacturing and variable remanufacturing. The hybrid strategy with variable remanufacturing yields the model’s global best performance. The SCM managers should follow the proposed model to maximize their profit. SCM managers have a dilemma when establishing a suitable production strategy. The numerical findings of the presented model show that a hybrid manufacturing-remanufacturing method reduces the volume of waste tires and increases overall profit more than a pure manufacturing policy. The hybrid strategy has two options: fixed remanufacturing and variable remanufacturing. The hybrid strategy with variable remanufacturing yields the model’s global best performance. The SCM managers should follow the proposed model to maximize their profit. The discussion of the results of the proposed model indicates that there are several scopes for the Governments to implement policies which can accelerate the transition toward sustainable and energy-efficient closed-loop supply chain. The Government may introduce subsidy policy for the use of renewable energy, which can be economically attractive for the SCM players in increasing the percentage of renewable energy share in the smart energy. Along with the policy makers can increase the investment in the improvement of smart grid and digital infrastructure, which may effectively reduce the operational barriers and enhance the reliability of smart energy integration for the SCM players. Further the Government or the policy makers can provide the incentives to support the green transportation system such as electric fleet adoption, fuel-efficient routing technologies. These green initiatives can effective in reducing emissions in both forward and reverse SCM from the transportation sections. The discussion of the results of the proposed model indicates that there are several scopes for the Governments to implement policies which can accelerate the transition toward sustainable and energy-efficient closed-loop supply chain. The Government may introduce subsidy policy for the use of renewable energy, which can be economically attractive for the SCM players in increasing the percentage of renewable energy share in the smart energy. Along with the policy makers can increase the investment in the improvement of smart grid and digital infrastructure, which may effectively reduce the operational barriers and enhance the reliability of smart energy integration for the SCM players. Further the Government or the policy makers can provide the incentives to support the green transportation system such as electric fleet adoption, fuel-efficient routing technologies. These green initiatives can effective in reducing emissions in both forward and reverse SCM from the transportation sections. The optimum delivery sequence for a store indicates the significance of the retailer’s lead time. Consequently, Retailer 2, with the lowest demand, gets a replenishment first since it has the shortest lead time. Retailers’ lead time is essential when using returnable transport items (RTI) for tire transportation in SCM. Otherwise, the seller’s demand chooses the most effective delivery schedule. However, while using RTI, managers must consider retailer demand and lead time. The optimum delivery sequence for a store indicates the significance of the retailer’s lead time. Consequently, Retailer 2, with the lowest demand, gets a replenishment first since it has the shortest lead time. Retailers’ lead time is essential when using returnable transport items (RTI) for tire transportation in SCM. Otherwise, the seller’s demand chooses the most effective delivery schedule. However, while using RTI, managers must consider retailer demand and lead time. Conclusions The proposed model studied a sustainable three-echelon CLSCM for tires with multi-retailers, single manufacturers, and 3PLs under a flexible manufacturing-remanufacturing policy. The study found the integrated effect of smart energy and carbon emissions in the proposed CLSCM for tires. The study found the maximum profit under the retailer’s price-dependent variable-demand strategy. The profit function of the CLSCM was highly nonlinear in selling price, production rate, cycle time, and EOL product collection rate. The model was solved using the classical optimization method. The numerical experiment found the following crucial results: the strategy of using smart energy by supply chain players increases total profit by 7.40% and reduces energy-related emissions by 41.99%. The analysis of the results showed that the manufacturer’s delivery scheduling strategy for final products is more cost-effective than a traditional delivery process. The proposed supply chain effectively reduced waste through the manufacturer’s remanufacturing strategy, and the results showed the manufacturer’s efficiency in waste reduction was 41%. The other interesting finding regarding remanufacturing was that there is a trade-off between remanufacturing and per unit emissions costs, i.e., as carbon costs increase, the remanufacturing rate decreases. From the retailer’s perspective, the flexible selling price strategy yielded a 3.84% increase over a fixed price policy. However, sustainability was obtained by the use of smart energy, by reducing waste under flexible manufacturing-remanufacturing procedures, and by maximizing the total system profit under a flexible price policy. This study covers a comprehensive analysis of a three-echelon sustainable SCM by considering the effective utilization of smart energy. However, there are several areas where the study could contribute by addressing the limitations of the proposed study. The study maximizes the total profit by addressing the environmental sustainability through the use of smart energy, remanufacturing, and emissions reduction, which made the problem a single objective function based optimization model. The study is restricted to a single-objective profit-maximization framework. As a result, it does not explicitly address trade-offs among profit maximization, emissions minimization, and optimal energy consumption. This fact limits the applicability of the proposed study, as it does not address multiple sustainability criteria simultaneously while maximizing total profit. Therefore, the model could be extended by incorporating multi-objective optimization techniques to minimize emissions and energy consumption and maximize total profit of the system67. The consideration of multiple retailers made the proposed model realistic, but in the modern era, the expansion of the retail system has created a more competitive business environment. Considering only the offline retail channel limits the study’s scope for retail opportunities. In this regard, the adoption of omnichannel retailing could increase tire demand and thereby enhance the economic sustainability of the system70. In the formulation of an SCM model, each node of the SCM imposes some constraints, such as capacity and budget constraints. Further, the model discussed the emissions dimension under the carbon tax policy. But the consideration of a carbon cap-and-trade policy may be more useful in real-world scenarios for reducing environmental degradation. The absence of these constraints in the model limits its applicability in the real world. Therefore, the model could be extended to account for space and budget constraints, as well as a carbon cap constraint, to form a bounded optimization model71,72. All the parameters in the model are considered to have precise value, which is not possible in real life scenario. Therefor the model can be extended by incorporating fuzzy costs instead of crisp value only73,74. Supplementary Information Supplementary Information. Supplementary Information.