33 U.S.C. § 2255a — High water-low water preparedness

United States Congress · 2026

Read 33 U.S.C. § 2255a — High water-low water preparedness by United States Congress (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-usc-t33-s2255a.txt.

Description

United States Code, Title 33 (Navigation And Navigable Waters); Chapter 36 (Water Resources Development); Subchapter III (Inland Waterway Transportation System). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel. (a) Definitions In this section: (1) Bypass The term “bypass” means an alternate water route adjacent to a lock and dam on a Federal inland waterway system that can be used for commercial navigation during high water.

Catalog record

CREATORUnited States Congress
YEAR2026
COLLECTIONLAW
FORMATTXT
FILE SIZE2 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEU.S. Code (OLRC)

Source: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2255a

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

33 U.S.C. § 2255a — High water-low water preparedness
Citation: us:usc:33:2255a
Creator: United States Congress
Year: 2026
Source-URL: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2255a
Context: United States Code, Title 33 (Navigation And Navigable Waters); Chapter 36 (Water Resources Development); Subchapter III (Inland Waterway Transportation System). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel.

(a) Definitions
In this section:
(1) Bypass
The term “bypass” means an alternate water route adjacent to a lock and dam on a Federal inland waterway system that can be used for commercial navigation during high water conditions.
(2) Emergency condition
The term “emergency condition” means—
(A)
unsafe conditions on a Federal inland waterway system that prevent the operation of commercial vessels, resulting from a major change in water level or flows;
(B)
an obstruction in a Federal inland waterway system, including silt, sediment, rock formation, or a shallow channel;
(C)
an impaired or inoperable Federal lock and dam; or
(D)
any other condition determined appropriate by the Secretary.
(b) Emergency determination
The Secretary, in consultation with the District Commanders responsible for maintaining any Federal inland waterway system, the users of the waterway system, and the Coast Guard, may make a determination that an emergency condition exists on the waterway system.
(c) Emergency mitigation project
(1) In general
Subject to paragraph (2) and the availability of appropriations, and in accordance with all applicable Federal requirements, the Secretary may carry out an emergency mitigation project on a Federal inland waterway system with respect to which the Secretary has determined that an emergency condition exists under subsection (b), or on a bypass of such system, to remedy that emergency condition.
(2) Deadline
An emergency mitigation project under paragraph (1) shall—
(A)
be initiated by not later than 60 days after the date on which the Secretary makes the applicable determination under subsection (b); and
(B)
to the maximum extent practicable, be completed by not later than 1 year after the date on which the Secretary makes such determination.
(d) Authorization of appropriations

Read the complete text