16 U.S.C. § 837c — Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest
United States Congress · 2026
Read 16 U.S.C. § 837c — Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest by United States Congress (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-usc-t16-s837c.txt.
Description
United States Code, Title 16 (Conservation); Chapter 12F (Pacific Northwest Consumer Power Preference; Reciprocal Priority In Other Regions). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel. Any contract of the Secretary for the sale or exchange of electric energy generated at, or peaking capacity of, Federal hydroelectric plants in marketing areas outside the Pacific Northwest for use within the Pacific Northwest shall be subject to.
Catalog record
| CREATOR | United States Congress |
|---|---|
| YEAR | 2026 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 1 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | U.S. Code (OLRC) |
Source: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837c
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
16 U.S.C. § 837c — Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest Citation: us:usc:16:837c Creator: United States Congress Year: 2026 Source-URL: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837c Context: United States Code, Title 16 (Conservation); Chapter 12F (Pacific Northwest Consumer Power Preference; Reciprocal Priority In Other Regions). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel. Any contract of the Secretary for the sale or exchange of electric energy generated at, or peaking capacity of, Federal hydroelectric plants in marketing areas outside the Pacific Northwest for use within the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 837a and 837b of this title for any contract for the sale or exchange of hydroelectric energy or peaking capacity generated within the Pacific Northwest for use outside the Pacific Northwest.