16 U.S.C. § 823a — Conduit hydroelectric facilities
United States Congress · 2026
Read 16 U.S.C. § 823a — Conduit hydroelectric facilities by United States Congress (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-usc-t16-s823a.txt.
Description
United States Code, Title 16 (Conservation); Chapter 12 (Federal Regulation And Development Of Power); Subchapter I (Regulation Of The Development Of Water Power And Resources). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel. (a) Qualifying conduit hydropower facilities (1) A qualifying conduit hydropower facility shall not be required to be licensed under this subchapter. (2) (A) Any person, State, or municipality proposing to construct a.
Catalog record
| CREATOR | United States Congress |
|---|---|
| YEAR | 2026 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 5 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | U.S. Code (OLRC) |
Source: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section823a
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
16 U.S.C. § 823a — Conduit hydroelectric facilities Citation: us:usc:16:823a Creator: United States Congress Year: 2026 Source-URL: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section823a Context: United States Code, Title 16 (Conservation); Chapter 12 (Federal Regulation And Development Of Power); Subchapter I (Regulation Of The Development Of Water Power And Resources). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel. (a) Qualifying conduit hydropower facilities (1) A qualifying conduit hydropower facility shall not be required to be licensed under this subchapter. (2) (A) Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria. (B) Not later than 15 days after receipt of a notice of intent filed under subparagraph (A), the Commission shall— (i) make an initial determination as to whether the facility meets the qualifying criteria; and (ii) if the Commission makes an initial determination, pursuant to clause (i), that the facility meets the qualifying criteria, publish public notice of the notice of intent filed under subparagraph (A). (C) If, not later than 30 days after the date of publication of the public notice described in subparagraph (B)(ii)— (i) an entity contests whether the facility meets the qualifying criteria, the Commission shall promptly issue a written determination as to whether the facility meets such criteria; or (ii) no entity contests whether the facility meets the qualifying criteria, the facility shall be deemed to meet such criteria. (3) For purposes of this section: (A) The term “conduit” means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. (B) The term “qualifying conduit hydropower facility” means a facility (not including any dam or other impoundment) that is determined or deemed under paragraph (2)(C) to meet the qualifying criteria. (C) The term “qualifying criteria” means, with respect to a facility— (i) the facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit; (ii) the facility has an installed capacity that does not exceed 40 megawatts; and (iii) on or before August 9, 2013, the facility is not licensed under, or exempted from the license requirements contained in, this subchapter. (b) Exemption qualifications Subject to subsection (c), the Commission may grant an exemption in whole or in part from the requirements of this subchapter, including any license requirements contained in this subchapter, to any facility (not including any dam or other impoundment) constructed, operated, or maintained for the generation of electric power which the Commission determines, by rule or order— (1) utilizes for such generation only the hydroelectric potential of a conduit; and (2) has an installed capacity that does not exceed 40 megawatts. (c) Consultation with Federal and State agencies In making the determination under subsection (b) the Commission shall consult with the United States Fish and Wildlife Service 1 National Marine Fisheries Service 1 and the State agency exercising administration over the fish and wildlife resources of the State in which the facility is or will be located, in the manner provided by the Fish and Wildlife Coordination Act (16 U.S.C. 661, et seq.), and shall include in any such exemption— (1) such terms and conditions as the Fish and Wildlife Service 1 National Marine Fisheries Service 1 and the State agency each determine are appropriate to prevent loss of, or damage to, such resources and to otherwise carry out the purposes of such Act, and (2) such terms and conditions as the Commission deems appropriate to insure that such facility continues to comply with the provisions of this section and terms and conditions included in any such exemption. (d) Violation of terms of exemption Any violation of a term or condition of any exemption granted under subsection (b) shall be treated as a violation of a rule or order of the Commission under this chapter. (e) Fees for studies