10 U.S.C. § 8692 — Ford-class aircraft carriers: cost limitation baselines

United States Congress · 2026

Read 10 U.S.C. § 8692 — Ford-class aircraft carriers: cost limitation baselines by United States Congress (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-usc-t10-s8692.txt.

Description

United States Code, Title 10 (Armed Forces); Part IV (General Administration); Chapter 863 (Naval Vessels). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel. (a) Limitation.— The total amounts obligated or expended from funds authorized to be appropriated or otherwise made available for Shipbuilding and Conversion, Navy, or for any other procurement account, may not exceed the following amounts for the following aircraft carriers: (1) $13,224,000,000.

Catalog record

CREATORUnited States Congress
YEAR2026
COLLECTIONLAW
FORMATTXT
FILE SIZE2 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEU.S. Code (OLRC)

Source: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section8692

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

10 U.S.C. § 8692 — Ford-class aircraft carriers: cost limitation baselines
Citation: us:usc:10:8692
Creator: United States Congress
Year: 2026
Source-URL: https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section8692
Context: United States Code, Title 10 (Armed Forces); Part IV (General Administration); Chapter 863 (Naval Vessels). Current through Public Law 119-134, as published by the Office of the Law Revision Counsel.

(a) Limitation.—
The total amounts obligated or expended from funds authorized to be appropriated or otherwise made available for Shipbuilding and Conversion, Navy, or for any other procurement account, may not exceed the following amounts for the following aircraft carriers:
(1)
$13,224,000,000 for the construction of the aircraft carrier designated CVN–78.
(2)
$11,398,000,000 for the construction of the aircraft carrier designated CVN–79.
(3)
$12,202,000,000 for the construction of the aircraft carrier designated CVN–80.
(4)
$12,451,000,000 for the construction of the aircraft carrier designated CVN–81.
(b) Exclusion of Battle and Interim Spares From Cost Limitation.—
The Secretary of the Navy shall exclude from the determination of the amounts set forth in subsection (a) the costs of the following items:
(1)
CVN–78 class battle spares.
(2)
Interim spares.
(3)
Increases attributable to economic inflation after December 1, 2018, not otherwise included in the amounts listed in subsection (a).
(c) Written Notice and Briefing on Change in Amount.—
The Secretary of the Navy may adjust an amount listed in subsection (a) not fewer than 15 days after submitting written notice and providing a briefing to the congressional defense committees, each of which shall include the amount and rationale of any change and the resulting amount after such change.

Read the complete text