Energy Northwest; Columbia Generating Station

Nuclear Regulatory Commission · 2018

Read Energy Northwest; Columbia Generating Station by Nuclear Regulatory Commission (2018) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2018-15091.txt.

Description

Notice published in the Federal Register on 2018-07-16 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 32916-32918] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2018-15091] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 50-397; NRC-2018-0146] Energy Northwest; Columbia Generating Station AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and finding of no significant impact; issuance. ----------------------------------------------------------------------- SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering.

Catalog record

CREATORNuclear Regulatory Commission
YEAR2018
COLLECTIONLAW
FORMATTXT
FILE SIZE16 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2018/07/16/2018-15091/energy-northwest-columbia-generating-station

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Energy Northwest; Columbia Generating Station Citation: us:fr:2018-15091 Creator: Nuclear Regulatory Commission Year: 2018 Source-URL: https://www.federalregister.gov/documents/2018/07/16/2018-15091/energy-northwest-columbia-generating-station Context: Notice published in the Federal Register on 2018-07-16 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 32916-32918] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2018-15091] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 50-397; NRC-2018-0146] Energy Northwest; Columbia Generating Station AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and finding of no significant impact; issuance. ----------------------------------------------------------------------- SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. NPF- 21, issued on May 22, 2012, and held by Energy Northwest (the licensee) for the operation of Columbia Generating Station (Columbia), located in Benton County, Washington. The proposed amendment would revise the Environmental Protection Plan (Non-Radiological) (EPP), contained in Appendix B to the Columbia renewed facility operating license. The NRC is issuing a final environmental assessment (EA) and finding of no significant impact (FONSI) associated with the proposed license amendment. DATES: The EA and FONSI referenced in this document is available on July 16, 2018. ADDRESSES: Please refer to Docket ID NRC-2018-0146 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0146. Address questions about NRC dockets to Jennifer Borges; telephone: 301-287- 9127; email: [email protected]. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to [email protected]. The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced. NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: John Klos, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-5136; email: [email protected]. SUPPLEMENTARY INFORMATION: I. Introduction The NRC is considering issuance of an amendment to Renewed Facility Operating License No. NPF-21 issued to [[Page 32917]] Energy Northwest for operation of Columbia, located in Benton County, Washington. The licensee submitted its license amendment request by letter dated December 18, 2017 (ADAMS Accession No. ML17352B255). If approved, the license amendment would add Section 4.2.2, ``Aquatic Issues,'' to the Columbia EPP to require Energy Northwest to adhere to the specific requirements within the Incidental Take Statement (ITS) in the currently applicable biological opinion. The NRC prepared an EA to document its findings related to the proposed license amendment request in accordance with Section 51.21 of title 10 of the Code of Federal Regulations (10 CFR). Based on the results of the EA documented herein, the NRC did not identify any significant environmental impacts associated with the proposed amendment and is, therefore, issuing a FONSI in accordance with 10 CFR 51.32. II. Environmental Assessment Plant Site and Environs Columbia is a single unit plant with a boiling water reactor and a closed-cycle cooling system that withdraws water from and discharges water to the Columbia River. The facility occupies approximately 1,089 acres (441 hectares) of land leased from the U.S. Department of Energy within the Hanford Reservation. The leased land is located in Benton County, Washington, 12 miles (19 kilometers) northwest of Richland and approximately 160 miles (257 kilometers) southeast of Seattle. The Columbia River borders the site to the east and flat rolling hills surround the site. The U.S. Atomic Energy Commission, the NRC's predecessor agency, and the NRC have previously conducted environmental reviews of Columbia operations in several documents, which contain more detailed descriptions of the plant site and environs. Those documents include the Final Environmental Statement related to construction of the facility in December 1972 (ADAMS Accession No. ML101870543); the Final Environmental Statement related to initial operation of the facility in December 1981 (ADAMS Accession No. ML100570374); and NUREG-1437, ``Generic Environmental Impact Statement [GEIS] for License Renewal of Nuclear Plants, Supplement 47, Regarding Columbia Generating Station-- Final Report,'' dated April 2012 and its associated GEIS documents (ADAMS Package Accession No. ML12097A267). Description of the Proposed Action The proposed action would add language in Section 4.2, ``Environmental Monitoring,'' of the Columbia EPP to require Energy Northwest to adhere to the specific requirements within the ITS in the currently applicable biological opinion. The proposed action would be in accordance with the licensee's application dated December 18, 2017. By amending Section 4.2 of the EPP to state that Energy Northwest must adhere to the ITS in the currently applicable biological opinion, the proposed action would require Energy Northwest's compliance with the National Marine Fisheries Service's (NMFS) biological opinion, dated March 10, 2017 (ADAMS Accession No. ML17072A036). This biological opinion applies to Upper Columbia River spring run Chinook salmon (Oncorhynchus tshawytscha) and Upper Columbia River steelhead (Oncorhynchus mykiss), and concludes that the continued operation of Columbia is not likely to jeopardize the continued existence of these species or destroy or adversely modify the designated critical habitat of these species. The ITS included in the biological opinion exempts the incidental take of these species from the prohibitions of Section 9 of the Endangered Species Act of 1973, as amended (ESA), provided that the specified Reasonable and Prudent Measures (RPMs) are implemented. The RPMs are: 1. Minimize the potential for incidental take of ESA-listed species as a result of elevated concentrations of chemical constituents in the mainstem Columbia River. 2. Minimize the potential for incidental take of ESA-listed species as a result of entrainment and impingement associated with the cooling water intake structure for Columbia. 3. Minimize the potential for incidental take \1\ of ESA-listed species as a result of biological monitoring. --------------------------------------------------------------------------- \1\ The ESA prohibits the take of any federally listed species without a special exemption and states that the term ``take'' means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. --------------------------------------------------------------------------- 4. Ensure completion of a monitoring and reporting program to confirm that the terms and conditions in this ITS were effective in avoiding and minimizing incidental take from permitted activities and ensuring incidental take is not exceeded. In order to implement the RPMs, the ITS prescribes a number of Terms and Conditions (T&Cs). The T&Cs require Energy Northwest to conduct effluent monitoring (RPM1), conduct impingment and entrainment studies (RPM 2), implement various best practices while conducting biological monitoring studies to minimize impacts to listed species (RPM 3), and submit a report to NMFS regarding all biological monitoring activites (RPM 4). Specificially, to minimize chemical exposures to ESA-listed species as described in RPM 1, Energy Northwest must conduct physical and chemical monitoring of the Columbia effluent, as specified in its National Pollutant Discharge Elimination

Read the complete text