FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Energy Department; Federal Energy Regulatory Commission · 2011
Read FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-20042.txt.
Description
Notice published in the Federal Register on 2011-08-09 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [FR Doc No: 2011-20042] [[Page 48853]] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14202-000] FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 13, 2011, Free Flow Power Project 70, LLC filed an application.
Catalog record
| CREATOR | Energy Department; Federal Energy Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 5 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Citation: us:fr:2011-20042
Creator: Energy Department; Federal Energy Regulatory Commission
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/08/09/2011-20042/ffp-project-70-llc-notice-of-preliminary-permit-application-accepted-for-filing-and-soliciting
Context: Notice published in the Federal Register on 2011-08-09 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo).
[FR Doc No: 2011-20042]
[[Page 48853]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14202-000]
FFP Project 70, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On May 13, 2011, Free Flow Power Project 70, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Mississippi Lock and Dam 19 Water Power Project (Mississippi
Lock and Dam 19 Project or project) to be located at the
abandoned lock and dry dock area of the Army Corp of Engineer's (Corps)
Mississippi Lock and Dam 19 on the Mississippi River, near
Keokuk, Lee County, Iowa and Hancock County, Illinois. The sole purpose
of a preliminary permit, if issued, is to grant the permit holder
priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The existing dam is composed of four sections: the dam, an existing
hydro powerhouse, an abandoned navigational lock at which the project
is proposed, and an operational navigational lock. The dam and
powerhouse are owned and operated by Ameren UE, and the two lock
structures are owned and operated by the Corps.
The proposed project would consist of the following: (1) A 370-
foot-wide, 660-foot-long new approach channel; (2) a 500-foot-long new
guide wall to separate barge traffic going into the existing
operational lock and direct water flow into the powerhouse; (3) an
undetermined length of new retaining wall constructed along the eastern
edge of the approach channel; (4) a 200-foot-wide, 250-foot-long new
reinforced concrete powerhouse containing three new turbine-generators,
each rated at 17 megawatts; (5) a 520-foot-wide, 1,100 foot-long new
tailrace channel; (6) a discharge retaining wall of undetermined length
constructed along the existing operational lock to protect the lock
foundation against scour and undermining; (7) a 60-foot-wide, 75-foot-
long new substation containing a step-up transformer and high-side and
low-side disconnects; (8) a 900-foot-long, 161-kilovolt (kV)
transmission line connecting the substation to Ameren UE's existing
infrastructure; and (9) appurtenant facilities. The estimated annual
generation of the Mississippi Lock and Dam 19 Water Power
Project would be 200 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation,
239 Causeway Street, Suite 300, Boston, MA 02114; phone: (978) 283-
2822.
FERC Contact: Sergiu Serban; phone: (202) 502-6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected] or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14202-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: July 29, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-20042 Filed 8-8-11; 8:45 am]