Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Energy Department; Federal Energy Regulatory Commission · 2011
Read Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-19070.txt.
Description
Notice published in the Federal Register on 2011-07-28 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 45252-45253] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-19070] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14125-000] Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March.
Catalog record
| CREATOR | Energy Department; Federal Energy Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 4 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Citation: us:fr:2011-19070
Creator: Energy Department; Federal Energy Regulatory Commission
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/07/28/2011-19070/reliable-storage-1-llc-notice-of-preliminary-permit-application-accepted-for-filing-and-soliciting
Context: Notice published in the Federal Register on 2011-07-28 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo).
[Pages 45252-45253]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-19070]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14125-000]
Reliable Storage 1 LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On March 25, 2011, Reliable Storage 1 LLC, filed an application,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of hydropower near the town of Lake City, in Campbell
County, Tennessee. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed pumped storage project would consist of the following:
(1) A 10-foot-high, 12,100-foot-long roller compacted concrete ringed
dike; (2) an upper reservoir with a surface area of 128.6 acres and an
7,914.4 acre-foot storage capacity; (3) a 180-foot-high, 1,248-foot-
long earth embankment dam creating; (4) a lower reservoir with a
surface area of 101 acres and an 7,594 acre-foot storage capacity; (5)
one 24-foot-diameter, 5,300-foot-long penstock; (6) a bifurcation to
three 14-foot-diameter, and 50-foot-long penstocks; (7) a powerhouse/
pumping station containing three pump/generating units with a total
generating capacity of 1,062 megawatts; (8) a substation; and (9) a
2.66-mile-long, 115 kV transmission line to an existing distribution
line. The proposed project would have an average annual generation of
2,761,000,000 megawatt-hours (MWh), which would be sold to theTennessee
Valley Authority.
Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation,
239 Causeway Street, Boston, MA 02114; phone (978) 283-2822.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed
[[Page 45253]]
electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected]; call toll-free at (866) 208-3676; or, for
TTY, contact (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and seven copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14125-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: July 20, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-19070 Filed 7-27-11; 8:45 am]