CenterPoint Energy Gas Transmission Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Line AM-46 Replacement Project
Energy Department; Federal Energy Regulatory Commission · 2011
Read CenterPoint Energy Gas Transmission Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Line AM-46 Replacement Project by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-17247.txt.
Description
Notice published in the Federal Register on 2011-07-11 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 40720-40721] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-17247] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-78-000] CenterPoint Energy Gas Transmission Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Line AM- 46 Replacement Project The staff.
Catalog record
| CREATOR | Energy Department; Federal Energy Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 8 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
CenterPoint Energy Gas Transmission Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Line AM-46 Replacement Project
Citation: us:fr:2011-17247
Creator: Energy Department; Federal Energy Regulatory Commission
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/07/11/2011-17247/centerpoint-energy-gas-transmission-company-llc-notice-of-availability-of-the-environmental
Context: Notice published in the Federal Register on 2011-07-11 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo).
[Pages 40720-40721]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-17247]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-78-000]
CenterPoint Energy Gas Transmission Company, LLC; Notice of
Availability of the Environmental Assessment for the Proposed Line AM-
46 Replacement Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Line
AM-46 Replacement Project proposed by CenterPoint Energy Gas
Transmission Company, LLC (CEGT) in the above-referenced docket. CEGT
requests authorization to construct, operate, and abandon pipeline
facilities in Howard, Hempstead, Sevier, and Little River Counties,
Arkansas. The proposed project would replace a segment of CEGT's
existing natural gas system to ensure a reliable natural gas supply of
50 million cubic feet per day to Ashdown, Arkansas.
The EA assesses the potential environmental effects of the
construction and operation of the Line AM-46 Replacement Project in
accordance with the requirements of the National Environmental Policy
Act of 1969 (NEPA). The FERC staff concludes that approval of the
proposed project, with appropriate mitigating measures, would not
constitute a major federal action significantly affecting the quality
of the human environment.
The U.S. Army Corps of Engineers participated as a cooperating
agency in the preparation of the EA. Cooperating agencies have
jurisdiction by law or special expertise with respect to resources
potentially affected by the proposal and participate in the NEPA
analysis. The project would require a permit from the USACE pursuant to
Section 404 of the Clean Water Act (33 United States Code 1344).
The proposed Line AM-46 Replacement Project involves the
abandonment of a total of 16.2 miles of CEGT's Line AM-46 and
associated segments; the construction of 16.7 miles of Line AM-204, a
new 10-inch-diameter pipeline in Howard, Hempstead, and Sevier
Counties, Arkansas; and the installation of a pig \1\ launcher at the
beginning of the new pipeline (MP 0.0) and a pig receiver at its
terminus (MP 16.7).
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that is inserted into and moves through
the pipeline, and is used for cleaning the pipeline, internal
inspections, or other purposes.
---------------------------------------------------------------------------
The EA has been placed in the public files of the FERC and is
available for public viewing on the FERC's Web site at http://www.ferc.gov using the eLibrary link. A limited number of copies of the
EA are available for distribution and public inspection at: Federal
Energy Regulatory Commission, Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
Copies of the EA have been mailed to federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; newspapers and libraries in the project area; and parties to
this proceeding.
Any person wishing to comment on the EA may do so. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that your comments are properly recorded and considered prior to
a Commission decision on the proposal, it is important that the FERC
receives your comments in Washington, DC on or before August 1, 2011.
For your convenience, there are three methods you can use to submit
your comments to the Commission. In all instances, please reference the
project docket number (CP11-78-000) with your submission. The
Commission encourages electronic filing of comments and has dedicated
eFiling expert staff available to assist you at (202) 502-8258 or
[email protected].
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. An eComment is an
easy method for interested persons to submit brief, text-only comments
on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at http://
[[Page 40721]]
www.ferc.gov under the link to Documents and Filings. With eFiling, you
can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Although your comments will be considered by the Commission, simply
filing comments will not serve to make the commenter a party to the
proceeding. Any person seeking to become a party to the proceeding must
file a motion to intervene pursuant to Rule 214 of the Commission's
Rules of Practice and Procedures (18 CFR 385.214).\2\ Only intervenors
have the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\2\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC or on the
FERC Web site (http://www.ferc.gov) using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number excluding the last three digits in the Docket Number field
(i.e., CP11-78). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to http://www.ferc.gov/esubscribenow.htm.
Dated: July 1, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-17247 Filed 7-8-11; 8:45 am]