Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Woodhull Storage Pool Boundary Project and Request for Comments on Environmental Issues

Energy Department; Federal Energy Regulatory Commission · 2011

Read Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Woodhull Storage Pool Boundary Project and Request for Comments on Environmental Issues by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-16998.txt.

Description

Notice published in the Federal Register on 2011-07-07 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 39865-39867] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-16998] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-493-000] Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Woodhull Storage Pool Boundary Project and Request for Comments.

Catalog record

CREATOREnergy Department; Federal Energy Regulatory Commission
YEAR2011
COLLECTIONLAW
FORMATTXT
FILE SIZE11 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2011/07/07/2011-16998/dominion-transmission-inc-notice-of-intent-to-prepare-an-environmental-assessment-for-the-proposed

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Woodhull Storage Pool Boundary Project and Request for Comments on Environmental Issues Citation: us:fr:2011-16998 Creator: Energy Department; Federal Energy Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/07/07/2011-16998/dominion-transmission-inc-notice-of-intent-to-prepare-an-environmental-assessment-for-the-proposed Context: Notice published in the Federal Register on 2011-07-07 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 39865-39867] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-16998] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-493-000] Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Woodhull Storage Pool Boundary Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the proposed Woodhull Storage Pool Boundary Project (Project) involving Dominion Transmission, Inc.'s (Dominion) extension of the certificated boundary of the Woodhull Natural Gas Storage Pool in Steuben County, New York. The EA will be used by the Commission in its decision-making process to determine whether the [[Page 39866]] project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the Project Amendment. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on July 29, 2011. This notice is being sent to the Commission's current environmental mailing list for the Project Amendment. State and local government representatives are asked to notify their constituents of this project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a Dominion representative about the acquisition or modification of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, Dominion could initiate condemnation proceedings where compensation would be determined in accordance with state or federal law. A fact sheet prepared by the FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do I Need To Know?'' is available for viewing on the FERC Web site (http://www.ferc.gov). This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission's proceedings. Summary of the Proposed Project Dominion is proposing to extend the perimeter of its Woodhull Natural Gas Storage Pool (Pool) existing boundary by an additional 2,000 feet, impacting 5,472.27 acres below ground surface (bgs). Located in the Oriskany Sandstone geologic formation 3,995 feet bgs and capped by Marcellus Shale and Onondaga Limestone Formations 30 feet above, Dominion contends that extending the perimeter would protect the Pool from encroachment from third parties drilling into the Marcellus Shale and potentially jeopardizing the sealing/trapping geology of the natural gas storage zone. Land Requirements No facilities would be constructed; therefore there would be no impact on the surface. Dominion's proposal would only enlarge the Pool's current boundary by 2,000 feet creating a buffer zone around the Pool. The general location of the proposed facilities is shown in Appendix 1. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from the issuance or amendment of a Certificate of Public Convenience and Necessity. NEPA also requires us \1\ to discover and address concerns the public may have about proposals. This process is referred to as ``scoping''. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to be addressed in the EA. All comments received will be considered during the preparation of the EA. --------------------------------------------------------------------------- \1\ ``We,'' ``us,'' and ``our'' refer to the environmental staff of the Commission's Office of Energy Projects. --------------------------------------------------------------------------- In the EA we will discuss impacts that could occur as a result of the storage field extension. We will also evaluate possible alternatives to the proposed project or portions of the project. Our independent analysis of the issues will be presented in the EA. The EA will be placed in the public record, and depending on the comments received during the scoping process, may be published and distributed to the public. A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section beginning on page 4. With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that they will be received in Washington, DC on or before July 29, 2011. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number (CP11-493-000) with your submission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at (202) 502-8258 or [email protected]. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ``eRegister.'' You will be asked to select the type of filing you are making. A comment on a particular project is considered a ``Comment on a Filing''; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials;

Read the complete text