Ashton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Energy Department · 2011

Read Ashton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications by Energy Department (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-16180.txt.

Description

Notice published in the Federal Register on 2011-06-28 by Energy Department. Text from federalregister.gov (official edition: govinfo). [Pages 37806-37807] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-16180] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Project No. 14213-000] Ashton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 13, 2011, Ashton Hydro, LLC, filed an application for.

Catalog record

CREATOREnergy Department
YEAR2011
COLLECTIONLAW
FORMATTXT
FILE SIZE4 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2011/06/28/2011-16180/ashton-hydro-llc-notice-of-preliminary-permit-application-accepted-for-filing-and-soliciting

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Ashton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Citation: us:fr:2011-16180
Creator: Energy Department
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/06/28/2011-16180/ashton-hydro-llc-notice-of-preliminary-permit-application-accepted-for-filing-and-soliciting
Context: Notice published in the Federal Register on 2011-06-28 by Energy Department. Text from federalregister.gov (official edition: govinfo).

[Pages 37806-37807]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-16180]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

 [Project No. 14213-000]


 Ashton Hydro, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 13, 2011, Ashton Hydro, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Ashton Hydroelectric 
Project (Ashton Dam Project or project) to be located on the Blackstone 
River, in the Town of Cumberland, in Providence County, Rhode Island. 
The sole purpose of a preliminary permit, if issued, is to grant the 
permit holder priority to file a license application during the permit 
term. A preliminary permit does not authorize the permit holder to 
perform any land-disturbing activities or otherwise enter upon lands or 
waters owned by others without the owners' express permission.
    The proposed run-of-the-river project would consist of: (1) The 
existing 400-foot-long, 20-foot-high Ashton Dam, which is owned by the 
Rhode Island Department of Environmental Management and includes a 250-
foot-long main spillway, a two-gated outlet structure, and a 150-foot-
long auxiliary spillway; (2) an existing 35 acre reservoir having a 
normal storage capacity of about 112 acre-feet (ac-ft) at elevation of 
74 feet above mean sea level and a maximum storage capacity of about 
200 ac-ft; (3) a new intake on the upstream face of the existing dam; 
(4) a new powerhouse that would be integrated into the existing dam at 
the existing auxiliary spillway and outlet structure containing a 
single 1.0 megawatt bulb turbine-generating unit; (5) a new 0.25-mile-
long, 13.8-kilovolt transmission line extending from the new 
switchyard/substation to the existing utility pole number 47 in 
Cumberland, Rhode Island; and (6) fish passage/protection measures. The 
estimated annual generation of the project would be 3.5 gigawatt-hours.
    Applicant Contact: Mr. Bruce DiGennaro, Managing Partner, Essex 
Energy Partners, LLC, 27 Vaughan Ave., Newport, Rhode Island 02840; 
phone: (401) 619-4872.
    FERC Contact: John Ramer; phone: (202) 502-8969.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14213-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.


[[Page 37807]]


    Dated: June 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-16180 Filed 6-27-11; 8:45 am]

Read the complete text