The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption
Energy Department; Federal Energy Regulatory Commission · 2011
Read The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-16171.txt.
Description
Notice published in the Federal Register on 2011-06-28 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [FR Doc No: 2011-16171] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-4-000] The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption Take notice that on June 8, 2011, the Connecticut Transmission Municipal Electric Energy Cooperative filed a petition requesting full waiver or exemption.
Catalog record
| CREATOR | Energy Department; Federal Energy Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 3 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption
Citation: us:fr:2011-16171
Creator: Energy Department; Federal Energy Regulatory Commission
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/06/28/2011-16171/the-connecticut-transmission-municipal-electric-energy-cooperative-notice-of-request-for-waiver-or
Context: Notice published in the Federal Register on 2011-06-28 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo).
[FR Doc No: 2011-16171]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. TS11-4-000]
The Connecticut Transmission Municipal Electric Energy
Cooperative; Notice of Request for Waiver or Exemption
Take notice that on June 8, 2011, the Connecticut Transmission
Municipal Electric Energy Cooperative filed a petition requesting full
waiver or exemption from any reciprocity-based standards of conduct
requirements under Order Nos. 899, FERC Stats. & Regs. ] 31,035 (2006),
or Order No. 717, FERC Stats. & Regs. ] 31,280 (2008).
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail [email protected].
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Intervention and Protest Date: 5 p.m. Eastern Time on Wednesday
June 29, 2011.
Dated: June 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-16171 Filed 6-27-11; 8:45 am]