Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
Homeland Security Department; Coast Guard · 2011
Read Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT by Homeland Security Department; Coast Guard (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-15351.txt.
Description
Rule published in the Federal Register on 2011-06-21 by Homeland Security Department; Coast Guard. Text from federalregister.gov (official edition: govinfo). [FR Doc No: 2011-15351] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-0492] Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. ----------------------------------------------------------------------- SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from.
Catalog record
| CREATOR | Homeland Security Department; Coast Guard |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 4 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
Citation: us:fr:2011-15351
Creator: Homeland Security Department; Coast Guard
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/06/21/2011-15351/drawbridge-operation-regulations-connecticut-river-old-lyme-ct
Context: Rule published in the Federal Register on 2011-06-21 by Homeland Security Department; Coast Guard. Text from federalregister.gov (official edition: govinfo).
[FR Doc No: 2011-15351]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0492]
Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Amtrak Railroad Bridge at mile 3.4, across the Connecticut River at Old
Lyme, Connecticut. The deviation is necessary to facilitate scheduled
maintenance at the bridge. This deviation allows the bridge to remain
in the closed position during the deviation period.
DATES: This deviation is effective from 12:01 a.m. through 6 a.m. on
June 23, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0492 and are available online
at http:[sol][sol]www.regulations.gov, inserting USCG-2011-0492 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Judy Leung-Yee, Project Officer, First Coast Guard
District, [email protected], or telephone (212) 668-7165. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Amtrak Railroad Bridge, across the
Connecticut River at mile 3.4, at Old Lyme, Connecticut, has a vertical
clearance in the closed position of 19 feet at mean high water and 22
feet at mean low water. The drawbridge operation regulations are listed
at 33 CFR 117.205(b).
The waterway users are commercial and recreational vessels.
The owner of the bridge, National Railroad Passenger Company
(Amtrak), requested a temporary deviation from the regulations to
facilitate repair of the main gear box and secondary reducer at the
bridge.
Under this temporary deviation the Amtrak Railroad Bridge may
remain in the closed position between 12:01 a.m. and 6 a.m. on June 23,
2011. Vessels that can pass under the bridge in the closed position may
do so at any time.
The local marinas and commercial users were notified. No objections
were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 8, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-15351 Filed 6-20-11; 8:45 am]