Environmental Assessment and Finding of No Significant Impact for Special Nuclear Material License Application From Tennessee Valley Authority for Watts Bar Nuclear Plant, Unit 2, Spring City, TN
Nuclear Regulatory Commission · 2011
Read Environmental Assessment and Finding of No Significant Impact for Special Nuclear Material License Application From Tennessee Valley Authority for Watts Bar Nuclear Plant, Unit 2, Spring City, TN by Nuclear Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-14559.txt.
Description
Notice published in the Federal Register on 2011-06-13 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 34273-34276] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-14559] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 70-7018; NRC-2008-0369] Environmental Assessment and Finding of No Significant Impact for Special Nuclear Material License Application From Tennessee Valley Authority for Watts Bar Nuclear Plant, Unit 2, Spring City, TN.
Catalog record
| CREATOR | Nuclear Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 18 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Environmental Assessment and Finding of No Significant Impact for Special Nuclear Material License Application From Tennessee Valley Authority for Watts Bar Nuclear Plant, Unit 2, Spring City, TN Citation: us:fr:2011-14559 Creator: Nuclear Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/06/13/2011-14559/environmental-assessment-and-finding-of-no-significant-impact-for-special-nuclear-material-license Context: Notice published in the Federal Register on 2011-06-13 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 34273-34276] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-14559] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 70-7018; NRC-2008-0369] Environmental Assessment and Finding of No Significant Impact for Special Nuclear Material License Application From Tennessee Valley Authority for Watts Bar Nuclear Plant, Unit 2, Spring City, TN AGENCY: Nuclear Regulatory Commission. ACTION: Publication of Environmental Assessment and Finding of No Significant Impact. ----------------------------------------------------------------------- FOR FURTHER INFORMATION CONTACT: Mary T. Adams, Senior Environmental Engineer, Advanced Fuel Cycle, Enrichment, and Uranium Conversion Branch, Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: 301-492-3113; Fax number: 301-492- 3359; E-mail: [email protected]. SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is considering the issuance of a license to Tennessee Valley Authority (TVA), to authorize the receipt, possession, inspection, and storage of special nuclear material (SNM) in the form of 193 fresh fuel assemblies at TVA's Watts Bar site in Spring City, TN. This license would be subject to the requirements of Title 10 of the Code of Federal Regulations (10 CFR), part 70. TVA plans to use this SNM in operating its proposed Watts Bar Nuclear Plant, Unit 2 (WBN2). TVA's request for authorization to operate WBN2 is the subject of a separate 10 CFR part 50 licensing action being evaluated by the NRC. TVA's existing reactor at the Watts Bar site, Unit 1 (WBN1), has operated since 1996. The NRC has prepared an environmental assessment (EA), set forth below, in support of the SNM storage license, in accordance with 10 CFR part 51 (Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions), which implements section 102(2) of the National Environmental Policy Act [[Page 34274]] (NEPA) of 1969, as amended 42 U.S.C. 4321, et seq. Based on the EA, the NRC has concluded that a Finding of No Significant Impact (FONSI) is appropriate regarding issuance of the SNM license. II. Background NEPA requires a Federal agency to prepare an environmental impact statement (EIS) for any major federal action having the potential to significantly affect the quality of the human environment. Consistent with their responsibilities as Federal agencies under NEPA, both TVA and NRC previously prepared EISs regarding the operation of Units 1 and 2 at the Watts Bar Nuclear site. Some of the relevant history in this regard is briefly summarized below. In 1978, the NRC published NUREG-0498, Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant Unit No. 1 and 2 (FES-OL). After safety issues were raised, TVA decided not to pursue its WBN reactor licenses for several years. Regarding operation of Unit 1, NRC prepared Supplement 1 to NUREG-0498 in April 1995 (ML081430592), to evaluate changes in environmental impacts that occurred as a result of changes made in the WBN Plant design and methods of operations after the 1978 FES-OL. The TVA Final Supplemental EIS for Unit 2 was issued in June 2007 (ML080510469). The related Record of Decision by the TVA Board of Directors was published in the Federal Register on August 15, 2007 (72 FR 45859), and the 2007 EIS was submitted to the NRC on February 15, 2008. Table 2-1 of the 2007 EIS provides a TVA summary of the potential environmental effects of operating WBN2. On March 4, 2009, pursuant to 10 CFR part 50, TVA submitted an updated application to the NRC for a power reactor operating license (OL) for WBN2 (ML090700378). The TVA Final Safety Analysis Report (FSAR) supporting the WBN2 OL request was submitted to the NRC on April 30, 2009 (ML091400067). On September 11, 2009 (74 FR at 46799), the NRC published a notice of intent to prepare a second supplement to NUREG-0498--the NRC EIS for WBN that was issued in 1978 and supplemented in 1995. NRC anticipates that the draft of this second supplement will be published for public comment in mid-2011. The scope of the EA below is limited to assessing the potential impacts of the receipt, possession, inspection, and storage of fresh reactor fuel at the Watts Bar site that would be used to operate WBN2 if such authorization is later granted. The EA's scope does not include completion of construction, or operation, of WBN2. III. Environmental Assessment Pursuant to 10 CFR part 70, Domestic Licensing of Special Nuclear Material, TVA applied for an SNM license by application dated November 12, 2009 (ML100120487). The license would authorize TVA to receive, possess, inspect, and store SNM (in the form of 193 fully-assembled fresh fuel assemblies) for potential future use in its proposed WBN2 reactor. Description of the Proposed Action The proposed action is to issue TVA a 10 CFR part 70 license authorizing it to receive, possess, inspect, and store SNM in the form of 193 fully-assembled fuel assemblies that would later form the initial reactor core of WBN 2. The SNM in the fuel assemblies would be enriched up to 5% in the isotope U-235. The fresh fuel assemblies for WBN2 would be received and stored in areas common to WBN1 and WBN2. Specifically, these assemblies would be stored either in the WBN1 storage racks within the WBN1 fuel storage vault, or in the WBN1 spent fuel pool. TVA requested that its SNM license term last until June 30, 2013, or until it receives an OL for WBN2. The safety and environmental reviews for the proposed WBN2 OL are not part of the proposed action evaluated in this EA. Need for the Proposed Action TVA anticipates receiving the initial core of WBN 2 before NRC would issue the OL for the Unit 2 reactor. TVA needs this SNM license to authorize WBN 2 to receive, possess, inspect, and store the fresh fuel during the time period before the OL is issued. If an OL is issued, the OL would authorize use of the fresh fuel as well as the receipt, possession, storage, and use of additional fresh fuel that would be needed for operating WBN2. Thus, a separate Part 70 license would no longer be required and would be terminated. Alternatives to the Proposed Action TVA needs this SNM license to authorize WBN2 to receive, possess, inspect, and store the fresh fuel assemblies during the time period before the issuance of any WBN2 OL. An alternative to the proposed action is for NRC not to issue the SNM license. In that case, TVA would be unable to receive the fresh fuel for the initial WBN2 reactor core, causing a start-up delay if the OL for WBN2 were later granted. Environmental Impacts of the Proposed Action and Alternatives Section 1.3 of the November 12, 2009, SNM license application describes the affected environment, including site geography, demographics, meteorology, hydrology, and geology. The proposed activity is limited to the receipt, possession, inspection, and storage of SNM in the form of 193