Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption

Nuclear Regulatory Commission · 2011

Read Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption by Nuclear Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-14425.txt.

Description

Notice published in the Federal Register on 2011-06-10 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 34105-34108] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-14425] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [NRC-2011-0107; Docket Nos. 50-325 and 50-324] Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company, et al. (the licensee), is the.

Catalog record

CREATORNuclear Regulatory Commission
YEAR2011
COLLECTIONLAW
FORMATTXT
FILE SIZE19 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2011/06/10/2011-14425/carolina-power-and-light-company-brunswick-steam-electric-plant-units-1-and-2-exemption

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption Citation: us:fr:2011-14425 Creator: Nuclear Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/06/10/2011-14425/carolina-power-and-light-company-brunswick-steam-electric-plant-units-1-and-2-exemption Context: Notice published in the Federal Register on 2011-06-10 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 34105-34108] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-14425] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [NRC-2011-0107; Docket Nos. 50-325 and 50-324] Carolina Power & Light Company, Brunswick Steam Electric Plant Units 1 and 2; Exemption 1.0 Background Carolina Power & Light Company, et al. (the licensee), is the holder of Facility Operating License Nos. DPR-71 and DPR-62, which authorize operation of the Brunswick Steam Electric Plant (BSEP), Units 1 and 2, respectively. The licenses provide, among other things, that the facility is subject to all rules, regulations, and orders of the U.S. Nuclear Regulatory Commission (NRC, Commission) now or hereafter in effect. The facility consists of two boiling water reactors located in Southport, North Carolina. 2.0 Request/Action By letter dated December 16, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103630405, as supplemented by letter dated January 27, 2011 (ADAMS Accession No. ML110400193), and pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 26.9, ``Specific exemptions,'' the licensee requested an exemption from the requirements of 10 CFR 26.205(c), ``Work hours scheduling,'' and (d), ``Work hour controls,'' during declarations of severe weather conditions such as tropical storm and hurricane-force winds at the BSEP site. Subsequent letters dated March 7 and April 13, 2011 (ADAMS Accession Nos. ML110730275 and ML11110A021, respectively) provided responses to the NRC staff's requests for additional information (RAIs). [[Page 34106]] The NRC staff has reviewed the licensee's request using the regulations contained in 10 CFR 26.205 and 10 CFR 26.207, and related Statement of Considerations in the 10 CFR Part 26, ``Fitness for Duty Programs'' Final Rule published in the Federal Register on March 31, 2008 (73 FR 16966-17235). As stated in 10 CFR Part 26, Subpart I, ``Managing Fatigue,'' the requirements in 10 CFR 26.205 apply to individuals identified in 10 CFR 26.4(a)(1) through (a)(5). These individuals' duties are: (1) Operating or onsite directing of the operation of structures, systems and components (SSCs) that a risk-informed evaluation process has shown to be significant to public health and safety; (2) performing health physics or chemistry duties required as a member of the onsite emergency response organization's minimum shift complement; (3) performing the duties of a fire brigade member who is responsible for understanding the effects of fire and fire suppressants on safe shutdown capability; (4) performing maintenance or onsite directing of the maintenance of SSCs that a risk-informed evaluation process has shown to be significant to public health and safety; and (5) performing security duties as an armed security force officer, alarm station operator, response team leader, or watchperson. The regulations in 10 CFR 26.205(c) require that an individual's work hours be scheduled consistent with the objective of preventing impairment from fatigue due to the duration, frequency, or sequencing of successive shifts. Paragraph 26.205(d) of 10 CFR provides the actual work hour controls, which include a maximum of 16 work hours in any 24-hour period, 26 work hours in any 48-hour period, and 72 work hours in any 7-day period. This section also specifies the minimum break times between work periods and the minimum number of days off that should be provided by a licensee to the identified individuals. Paragraph 10 CFR 26.205(b) provides the requirement and method to calculate work hours and days worked. Paragraph 10 CFR 26.205(b)(3) provides the requirement to include in the ``calculation period'' all work hours performed for the licensee prior to beginning or resuming duties subject to work hour controls. Paragraph 10 CFR 26.207(d) provides an allowance for licensees to not meet the requirements of 10 CFR 26.205(c) and (d) during declared emergencies, as defined in the licensee's emergency plan. The licensee in its letter dated December 16, 2010, states that the requested exemption applies to individuals who perform duties identified in 10 CFR 26.4(a)(1) through (a)(5) who are designated by BSEP as ``covered workers.'' The requested exemption is to support effective response to severe weather conditions when travel to and from the BSEP site may not be safe or even possible. During these times, the licensee sequesters sufficient individuals, including covered workers, to perform work as a member of the storm crew. The licensee staffs those who will be sequestered onsite during the severe wind event to perform two 12-hour shifts. The licensee states that the storm crews are augmented by the emergency response organization (ERO) personnel based on the severity category of the storm. Therefore, the exemption request would also apply to members of the ERO who are subject to work hour controls and who will also be sequestered on site during the severe weather conditions. The exemption request specifies that the exemption is not for discretionary maintenance activities. The licensee requested an exemption from the requirements of 10 CFR 26.206(c) and (d) during the period of time defined by the following entry and exit conditions. Entry Condition: This is the start time when individuals designated to the storm crew performing duties identified in 10 CFR 26.4(a)(1) through (a)(5) will not have to meet the requirements of 10 CFR 26.205(c) and (d). This occurs when the site enters procedure 0AI-68, ``Brunswick Nuclear Plant Response to Severe Weather Warnings,'' and senior plant management determines that travel conditions to the site will potentially become hazardous such that storm crew staffing will be required based on verifiable weather conditions. Verifiable weather conditions are defined as when the site is located within the National Hurricane Center 5-day cone of probability for predicted winds of tropical storm or hurricane-force impact. Exit Condition: This is the time when BSEP personnel must fully comply with the requirements of 10 CFR 26.205(c) and (d) following severe weather involving tropical storm or hurricane force winds. This date and time will be determined by senior plant management and will be when sufficient personnel are available to meet the requirements of 10 CFR 26.205(c) and (d). The licensee added that upon exiting the exemption the work hour controls will be applied and that the affected individuals will be provided a minimum of a 10-hour break prior to the start of the first shift following exiting the exemption. The licensee states that there is no need for an exemption for BSEP covered workers during the period of declared emergency when the sustained wind speed is greater than 100 miles per hour (mph), since, in accordance with 10 CFR 26.207(d), licensees are not required to meet the requirements of 10 CFR 26.205(c) and (d) during a declared emergency. The licensee indicated that the exemption will be applied during the period defined by the entry and exit conditions, regardless of whether BSEP enters the period of declared emergency. As a result, there will be only one set of entry and exit conditions. In its letter dated December 16, 2010, the licensee committed to maintain the following guidance in a site procedure: The entry conditions necessary to sequester site personnel that are consistent with the conditions specified in the BSEP exemption