Decommissioning Planning

Nuclear Regulatory Commission · 2011

Read Decommissioning Planning by Nuclear Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-14267.txt.

Description

Rule published in the Federal Register on 2011-06-17 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 35512-35575] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-14267] [[Page 35511]] Vol. 76 Friday, No. 117 June 17, 2011 Part II Nuclear Regulatory Commission ----------------------------------------------------------------------- 10 CFR Parts 20, 30, 40, et al. Decommissioning Planning; Final Rule Federal Register / Vol. 76 , No. 117 /.

Catalog record

CREATORNuclear Regulatory Commission
YEAR2011
COLLECTIONLAW
FORMATTXT
FILE SIZE472 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2011/06/17/2011-14267/decommissioning-planning

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Decommissioning Planning Citation: us:fr:2011-14267 Creator: Nuclear Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/06/17/2011-14267/decommissioning-planning Context: Rule published in the Federal Register on 2011-06-17 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 35512-35575] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-14267] [[Page 35511]] Vol. 76 Friday, No. 117 June 17, 2011 Part II Nuclear Regulatory Commission ----------------------------------------------------------------------- 10 CFR Parts 20, 30, 40, et al. Decommissioning Planning; Final Rule Federal Register / Vol. 76 , No. 117 / Friday, June 17, 2011 / Rules and Regulations [[Page 35512]] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 20, 30, 40, 50, 70, and 72 [NRC-2008-0030] RIN 3150-AI55 Decommissioning Planning AGENCY: Nuclear Regulatory Commission. ACTION: Final rule. ----------------------------------------------------------------------- SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to improve decommissioning planning and thereby reduce the likelihood that any current operating facility will become a legacy site. The amended regulations require licensees to conduct their operations to minimize the introduction of residual radioactivity into the site, which includes the site's subsurface soil and groundwater. Licensees also may be required to perform site surveys to determine whether residual radioactivity is present in subsurface areas and to keep records of these surveys with records important for decommissioning. The amended regulations require licensees to report additional details in their decommissioning cost estimate (DCE), eliminate the escrow account and line of credit as approved financial assurance mechanisms, and modify other financial assurance requirements. The amended regulations require decommissioning power reactor licensees to report additional information on the costs of decommissioning and spent fuel management. DATES: The final rule is effective on December 17, 2012. Compliance with the reporting provisions in Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(8)(v) and (vii) is required by March 31, 2013. ADDRESSES: You can access publicly available documents related to this document using the following methods: NRC's Public Document Room (PDR): The public may examine and have copied, for a fee, publicly available documents at the NRC's PDR, O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. NRC's Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of the NRC's public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC's PDR reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to [email protected]. Federal Rulemaking Web Site: Public comments and supporting materials related to this final rule can be found at http://www.regulations.gov by searching on Docket ID NRC-2008-0030. Address questions about NRC dockets to Carol Gallagher, telephone: 301-492- 3668; e-mail: [email protected]. FOR FURTHER INFORMATION CONTACT: Robert D. MacDougall, Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: 301-415-5175; e-mail: [email protected], or Kevin O'Sullivan, Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001, telephone: 301-415-8112; e-mail: [email protected]. SUPPLEMENTARY INFORMATION: I. Background II. Discussion A. What action is the NRC taking? B. Whom does this action affect? C. What steps did NRC take to prepare for this rulemaking? D. What alternatives did NRC consider? E. What is a legacy site? F. What are financial assurances? G. Why might some materials licensees not have funds to decommission their facility? H. Why is 10 CFR 50.82 being amended? I. What changes are being made to 10 CFR 20.1406? J. Which surveys are required under amended 10 CFR 20.1501(a)? K. What information must the licensee collect under amended 10 CFR 20.1501? L. How will licensees report required information to the NRC? M. What financial assurance information must licensees report to the NRC? N. What changes are being made to financial assurance regulations? O. Will some licensees who currently do not have financial assurance need to get financial assurance? P. What changes are being made with respect to materials facilities' decommissioning funding plan (DFP) and DCE? Q. What changes are being made with respect to license transfer regulations for materials licensees? R. What changes are being made with respect to permanently shutdown reactor decommissioning fund status and spent fuel management plan reporting? S. When do these actions become effective? T. Has NRC prepared a cost-benefit analysis of the final rule? U. Has NRC evaluated the additional paperwork burden to licensees? III. Summary and analysis of public comments on the proposed rule IV. Discussion of Final Amendments by Section V. Criminal Penalties VI. Agreement State Compatibility VII. Voluntary Consensus Standards VIII. Environmental Assessment and Finding of No Significant Environmental Impact: Availability IX. Paperwork Reduction Act Statement X. Regulatory Analysis XI. Regulatory Flexibility Certification XII. Backfit Analysis XIII. Congressional Review Act I. Background The NRC issued comprehensive and risk informed decommissioning regulations in 1997 as Subpart E of 10 CFR part 20 (62 FR 39058; July 21, 1997). This set of requirements is known as the License Termination Rule (LTR). The LTR is based on calculated doses, and it established specific radiological criteria for remediation of lands and structures to complete site decommissioning and successfully terminate the license. The LTR provides an overall approach for license termination for two different site conditions: unrestricted use and restricted conditions for use after license termination. The LTR applies to the decommissioning of facilities licensed under the regulations in 10 CFR parts 30, 40, 50, 60, 61, 63, 70, and 72. In the 1997 LTR final rule, in response to a public comment that the requirements of then-proposed regulations in 10 CFR 20.1406 should apply to all licensees rather than only to applicants for new licenses, the Commission stated: Applicants and existing licensees, including those making license renewals, are already required by 10 CFR part 20 to have radiation protection programs aimed towards reducing exposure and minimizing waste. In particular, Sec. 20.1101(a) requires development and implementation of a radiation protection plan commensurate with the scope and extent of licensed activities and sufficient to ensure compliance with the provisions of 10 CFR part 20. Section 20.1101(b) requires licensees to use, to the extent practicable, procedures and engineered controls to achieve public doses that are [as low as reasonably achievable] ALARA. In addition, lessons learned and documented in reports such as NUREG-1444 [ML080860275 and ML080860308] have focused attention on the need to minimize and control waste generation during operations as part of development of the required radiation protection plans. Furthermore, the financial assurance requirements issued in the January 27, 1988 (53 FR 24018), rule on planning for decommissioning require licensees to provide adequate funding for decommissioning. These funding [[Page 35513]] requirements create great incentive to minimize contamination and the amount of funds set aside and expended on cleanup. (62 FR 39082; July 21, 1997). Current 10 CFR 20.1101(a) requires each licensee to implement a radiation protection program to ensure compliance with the regulations in 10 CFR part 20. Current Sec. 20.1101(b) requires each licensee to use, to the extent practical, procedures and engineering controls based upon sound radiation protection principles to achieve occupational

Read the complete text