Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental Assessment and Finding of No Significant Impact
Nuclear Regulatory Commission · 2011
Read Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental Assessment and Finding of No Significant Impact by Nuclear Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-12444.txt.
Description
Notice published in the Federal Register on 2011-05-20 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 29277-29278] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-12444] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278; NRC-2011-0112] Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory.
Catalog record
| CREATOR | Nuclear Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 13 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental Assessment and Finding of No Significant Impact Citation: us:fr:2011-12444 Creator: Nuclear Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/05/20/2011-12444/exelon-generation-company-llc-peach-bottom-atomic-power-station-unit-nos-2-and-3-environmental Context: Notice published in the Federal Register on 2011-05-20 by Nuclear Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 29277-29278] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-12444] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278; NRC-2011-0112] Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment for renewed Facility Operating License Nos. DPR-44 and DPR-56, issued to Exelon Generation Company, LLC (Exelon, the licensee) for operation of the Peach Bottom Atomic Power Station, Units 2 and 3 (PBAPS), located near Lancaster, Pennsylvania, in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.90. In accordance with 10 CFR 51.21, the NRC staff prepared an environmental assessment documenting its finding. Based on the results of the environmental assessment, the NRC is issuing a finding of no significant impact. Environmental Assessment Identification of the Proposed Action The proposed action would revise the renewed Facility Operating Licenses for PBAPS to possess, but not separate, byproduct material, specifically Class B and Class C low-level radioactive waste (LLRW), from Exelon's Limerick Generating Station, Units 1 and 2 (LGS). The LLRW will be stored in the PBAPS Low-Level Radioactive Waste Storage Facility (LLRWSF). The proposed action is in accordance with the licensee's application dated January 6, 2010, as supplemented by letters dated August 20, 2010, October 14, 2010, and December 6, 2010. The Need for the Proposed Action The proposed action is needed to provide the licensee with adequate storage capacity, in lieu of constructing alternate storage facilities, for its Class B and Class C LLRW generated at LGS since it does not currently have access to a licensed disposal facility for this LLRW. The State of South Carolina's licensed low-level radioactive waste disposal facility, located in Barnwell, has limited access to the facility from radioactive waste generators located in States that are not part of the Atlantic Low-Level Waste Compact. Pennsylvania is not a member of the Atlantic Low-Level Waste Compact. Therefore, LGS and PBAPS do not have access to the Barnwell disposal facility for their Class B and Class C LLRW. LGS does not have the capability to store all the LLRW it generates. However, PBAPS has a LLRWSF capable of safely storing a large amount of LLRW, on an interim basis. Environmental Impacts of the Proposed Action The proposed action involves the transportation of LLRW from LGS for interim storage at PBAPS. The LLRW will be transported by truck in accordance with U.S. Department of Transportation and NRC regulations. The distance between the plant sites is less than the distance that was previously traveled to the Barnwell disposal facility in South Carolina. The licensee anticipates that there will be approximately two to three shipments a year of LLRW to PBAPS from LGS. The projected number of shipments is consistent with the past annual average number of trips to the Barnwell facility. While the total travel distance for LLRW generated at LGS, once a new disposal site is determined, may be more or less than the current travel distance from LGS to the Barnwell facility, this circumstance is subject to change regardless of interim storage at PBAPS. Since eventual transport of LLWR to a final disposal site will be accomplished in accordance with NRC and DOT regulations, no significant environmental impact will result regardless of the distance to the final disposal site. However, the proposed action will reduce the total annual number of miles driven for the transport of LLRW during the interim storage period. With less miles traveled, it is expected that there will be no change or possibly a corresponding reduction in the impacts associated with transportation during the interim storage period, such as lower radiation exposure to the truck driver and members of the public along the transportation route. The proposed action would not result in an increased risk of accidents and radiological hazards beyond those associated with the transport to the Barnwell facility. There will be no change to radioactive effluents from the power plants or the LLRW containers that affect radiation exposures to plant workers and members of the public. The interim storage building is designed to comply with NRC regulatory guidance, primarily Generic Letter 81-38, ``Storage of Low-Level Radioactive Wastes at Power Reactor Sites,'' November 10, 1981, and to meet radiation protection standards in 10 CFR part 20, ``Standards for Protection Against Radiation,'' and 40 CFR part 190, ``Environmental Radiation Protection Standards for Nuclear Power Operations.'' Guidance in Section 11.4, ``Solid Waste Management System,'' of NUREG-0800, ``Safety Review Plan for the Review of Safety Analysis and Reports for Nuclear Power Plants,'' Revision 3, March 2007, was also reviewed and assessed with respect to the proposed action. The cumulative dose from handling the LLRW from PBAPS and from the additional LLRW from the LGS will be controlled by station procedures to ensure compliance with the radiation dose standards to workers and members of the public. Based on this information, the staff concludes that the radiological impacts associated with the transportation, handling, and storage of LLRW at PBAPS will not result in a significant impact to plant workers and members of the public. The proposed action will not significantly increase the probability or consequences of accidents. No changes are being made in the types of effluents that may be released offsite. There is no significant increase in the amount of any effluent released offsite. There is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action. The proposed action does not involve a change to plant buildings or land areas on the PBAPS site. The proposed action does not result in changes to land use or water use, or result in changes to the quality or quantity of non-radiological effluents. With less miles traveled, it is expected that there will be no change or possibly a corresponding reduction in the impacts associated with transportation such as reduced use of fossil fuels and reduced air emissions [[Page 29278]] that would affect air quality during the interim storage period. No changes to the National Pollutant Discharge Elimination System permit are needed. No effects on the aquatic or terrestrial habitat in the vicinity of the plant, or to threatened, endangered, or protected species under the Endangered Species Act, or impacts to essential fish habitat covered by the Magnuson-Stevens Act are expected. There are no impacts to historical and cultural resources. There would be no impact to socioeconomic resources. Therefore, no changes to or different types of non-radiological environmental impacts are expected as a result of the proposed action. Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action. The details of the NRC staff's safety evaluation will be provided in the license amendment, if approved by the NRC, which will be issued as part of