Black Canyon Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Energy Department; Federal Energy Regulatory Commission · 2011
Read Black Canyon Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-12116.txt.
Description
Notice published in the Federal Register on 2011-05-18 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 28766-28767] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-12116] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14110-000] Black Canyon Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March.
Catalog record
| CREATOR | Energy Department; Federal Energy Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 4 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Black Canyon Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Citation: us:fr:2011-12116
Creator: Energy Department; Federal Energy Regulatory Commission
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/05/18/2011-12116/black-canyon-hydro-llc-notice-of-preliminary-permit-application-accepted-for-filing-and-soliciting
Context: Notice published in the Federal Register on 2011-05-18 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo).
[Pages 28766-28767]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-12116]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14110-000]
Black Canyon Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On March 14, 2011, Black Canyon Hydro, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Black Canyon
Hydroelectric Project (project) to be located on the North Fork of the
Snoqualmie River, near North Bend, King County, Washington. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) An
approximately 35-foot-wide, 7-foot-tall inflatable dam; (2) a 90-foot-
wide, 7-foot-tall diversion intake structure; (3) a 9-foot-wide, 7-
foot-tall fish ladder; (4) a 7,300-foot-long, 12-foot-diameter
penstock; (5) a 60-foot-long, 100-foot-wide metal powerhouse with two
Francis turbine units, one rated at 16-megawatts (MW), the other rated
at 9 MW; (6) a 150-foot-long, 40-foot-wide tailrace; (7) a 0.75-mile
extension of the existing logging road; (8) a 4.2-mile-long, 115-
kilovolt (kV) transmission line; and (9) appurtenant facilities. The
estimated annual generation of the project would be 90,000 megawatt-
hours.
Applicant Contact: Mr. Chris Spens, Licensing Manager, Black Canyon
Hydro, LLC, 3633 Alderwood Avenue, Bellingham, Washington 98225; phone:
(360) 738-9999.
[[Page 28767]]
FERC Contact: Kelly Wolcott; phone: (202) 502-6480.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected] or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14110-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: May 11, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-12116 Filed 5-17-11; 8:45 am]