Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Energy Department; Federal Energy Regulatory Commission · 2011
Read Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-11911.txt.
Description
Notice published in the Federal Register on 2011-05-16 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [FR Doc No: 2011-11911] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12958-001; Project No. 12962-001] Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following.
Catalog record
| CREATOR | Energy Department; Federal Energy Regulatory Commission |
|---|---|
| YEAR | 2011 |
| COLLECTION | LAW |
| FORMAT | TXT |
| FILE SIZE | 6 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Federal Register |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Citation: us:fr:2011-11911
Creator: Energy Department; Federal Energy Regulatory Commission
Year: 2011
Source-URL: https://www.federalregister.gov/documents/2011/05/16/2011-11911/uniontown-hydro-llc-newburgh-hydro-llc-notice-of-applications-tendered-for-filing-with-the
Context: Notice published in the Federal Register on 2011-05-16 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo).
[FR Doc No: 2011-11911]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12958-001; Project No. 12962-001]
Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications
Tendered for Filing With the Commission and Establishing Procedural
Schedule for Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Applications: New Major License.
b. Project Nos.: 12958-001 and 12962-001.
c. Date Filed: April 29, 2011.
d. Applicant: Uniontown Hydro, LLC and Newburgh Hydro, LLC.
e. Name of Projects: Uniontown Hydroelectric Project and Newburgh
Hydroelectric Project.
f. Location: The projects would be located on the Ohio River at
existing U.S. Army Corps of Engineers locks and dams. The Uniontown
Project would be located at the John T. Myers Lock and Dam, in Union
County, Kentucky and Posey County, Indiana. The Newburgh Project would
be located at the Newburgh Lock and Dam, in Henderson County, Kentucky
and Warrick County, Indiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Brent L. Smith, COO, Symbiotics, P.O. Box
535, Rigby, Idaho 83442.
i. FERC Contact: Jennifer Adams; (202) 502-8087, or
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The existing John T. Myers Lock and Dam
is a 3,504-foot-long, 119-foot-high dam containing ten Taintor gates
and a concrete fixed weir. Each gate is 110-foot-wide by 32-foot-high.
The main and auxiliary locks are on the Indiana side of the river. The
main lock is 110-foot-wide by 1,200-foot-long and the auxiliary lock is
110-foot-wide by 600-foot-long. The impoundment above the John T. Myers
Lock and Dam has a surface area of 19,350 acres and a storage capacity
of 543,862 acre-feet. Because the purpose of the storage is
navigational only, the storage would not be used for power generation.
The proposed Uniontown Project (at the John T. Myers Lock and Dam)
would consist of: (1) A 340-foot-long by 75-foot-wide powerhouse and
inlet containing four Kaplan turbine-generators, with an installed
capacity of 24.0 MW each for a total plant capacity of 96.0 MW; (2) a
520-foot-wide by 38-foot-high trash rack, with 4-inch openings; (3) a
300-foot-wide by 57-foot-high concrete draft tube outlet; (4) a 14.47-
mile-long, 138-kV transmission line; and (5) appurtenant facilities.
The existing Newburgh Lock and Dam is a 2,275.5-foot-long by 122-
foot-high dam containing nine Taintor gates and a concrete fixed weir.
Each gate is 110-foot-wide by 32-feet-high. The main and auxiliary
locks are on the Indiana side of the river. The main lock is 110-foot-
wide by 1,200-foot-long and the auxiliary lock is 110-foot-wide by 600-
foot-long. The impoundment above the Newburgh Lock and Dam has a
surface area of 16,390 acres and a storage capacity of 455,800 acre-
feet. Because the purpose of the storage is navigational only, the
storage would not be used for power generation.
The proposed Newburgh Project (at the Newburgh Lock and Dam) would
consist of: (1) A 375-foot-long by 110-foot-wide powerhouse and inlet
containing five Kaplan turbine-generators, with an installed capacity
of 13.0 MW each for a total plant capacity of 65.0 MW; (2) a 400-foot-
wide by 44-foot-high trash rack, with 4-inch openings; (3) a 375-foot-
wide by 57-foot-high concrete draft tube outlet; (4) a 4.7-mile-long,
138-kV transmission line; and (5) appurtenant facilities.
l. Locations of the Applications: Copies of the applications are
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at http://www.ferc.gov,
using the ``eLibrary'' link. Enter the docket number, excluding the
last three digits in the docket number field to access the document.
For assistance, contact FERC Online Support at
[email protected], or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydropower Licensing Schedule. Revisions
to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for June 28, 2011.
Environmental Analysis.
Filing of recommendations, preliminary August 27, 2011.
terms and conditions, and fishway
prescriptions.
Commission issues Draft EA................ February 23, 2012.
Comments on Draft EA...................... March 24, 2012.
Modified terms and conditions............. May 23, 2012.
Commission Issues Final EA or EIS......... August 21, 2012.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: May 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-11911 Filed 5-13-11; 8:45 am]