Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive

Energy Department; Federal Energy Regulatory Commission · 2011

Read Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-10226.txt.

Description

Rule published in the Federal Register on 2011-04-28 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 23690-23708] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-10226] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 40 [Docket No. RM09-9-000; Order No. 751] Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and.

Catalog record

CREATOREnergy Department; Federal Energy Regulatory Commission
YEAR2011
COLLECTIONLAW
FORMATTXT
FILE SIZE139 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2011/04/28/2011-10226/version-one-regional-reliability-standards-for-facilities-design-connections-and-maintenance

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive Citation: us:fr:2011-10226 Creator: Energy Department; Federal Energy Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/04/28/2011-10226/version-one-regional-reliability-standards-for-facilities-design-connections-and-maintenance Context: Rule published in the Federal Register on 2011-04-28 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 23690-23708] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-10226] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 40 [Docket No. RM09-9-000; Order No. 751] Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive AGENCY: Federal Energy Regulatory Commission, Energy. ACTION: Final rule. ----------------------------------------------------------------------- SUMMARY: Under section 215 of the Federal Power Act, the Commission hereby approves four revised regional Reliability Standards developed by the Western Electricity Coordinating Council and approved by the North American Electric Reliability Corporation, which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. These regional Reliability Standards have been designated by the Western Electricity Coordinating Council as FAC-501-WECC-1--Transmission Maintenance, PRC-004-WECC-1--Protection System and Remedial Action Scheme Misoperation, VAR-002-WECC-1--Automatic Voltage Regulators, and VAR-501-WECC-1--Power System Stabilizer. Reliability Standard FAC-501- WECC-1 addresses transmission maintenance for specified transmission paths in the Western Interconnection. Reliability Standard PRC-004- WECC-1 addresses the analysis of misoperations that occur on transmission and generation protection systems and remedial action schemes in the Western Interconnection. Reliability Standard VAR-002- WECC-1 is meant to ensure that automatic voltage regulators remain in service on synchronous generators and condensers in the Western Interconnection. Reliability Standard VAR-501-WECC-1 is meant to ensure that power system stabilizers remain in service on synchronous generators in the Western Interconnection. In addition, the Commission approves five new regional definitions applicable within the Western Interconnection. DATES: Effective Date: This rule will become effective June 27, 2011. FOR FURTHER INFORMATION CONTACT: Nick Henery (Technical Information), Office of Electric Reliability, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, (202) 502-8636. Scott Sells (Technical Information), Office of Electric Reliability, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, (202) 502-6664. A. Cory Lankford (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, (202) 502-6711. SUPPLEMENTARY INFORMATION: Table of Contents Paragraph numbers I. Background........................................... 2 A. Mandatory Reliability Standards.................. 2 B. Western Electricity Coordinating Council......... 5 C. Proposed Regional Reliability Standards.......... 7 II. Discussion.......................................... 11 A. FAC-501-WECC-1 Transmission Maintenance.......... 14 1. WECC Transfer Path Table..................... 19 2. System Operating Limits...................... 25 3. Summary...................................... 33 B. PRC-004-WECC-1................................... 34 1. WECC Transfer Path Table and WECC Remedial 40 Action Schemes Table........................... 2. Summary...................................... 51 C. VAR-002-WECC-1................................... 52 1. Automatic Voltage Regulator In-Service 57 Requirement.................................... 2. Exclusion of Synchronous Generators That 68 Operate Less Than Five Percent of All Hours During a Calendar Quarter...................... 3. Automatic Voltage Regulator Replacement...... 73 4. Automatic Voltage Regulator Performance...... 78 5. Summary...................................... 85 D. VAR-501-WECC-1................................... 86 1. Power System Stabilizer In-Service 88 Requirement.................................... 2. Exclusion of Synchronous Generators That 96 Operate for Less Than Five Percent of All Hours During a Calendar Quarter...................... 3. Power System Stabilizer Replacement.......... 100 4. Power System Stabilizer Performance.......... 105 5. Reporting Burden............................. 112 6. Summary...................................... 117 E. NERC VAR-002-1.1b................................ 118 F. Violation Risk Factors and Violation Severity 122 Levels............................................. [[Page 23691]] III. Information Collection Statement................... 134 IV. Environmental Analysis.............................. 139 V. Regulatory Flexibility Act........................... 140 VI. Document Availability............................... 144 VII. Effective Date and Congressional Notification...... 147 135 FERC ] 61,061 Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Issued April 21, 2011 1. Under section 215 of the Federal Power Act (FPA),\1\ the Commission hereby approves four revised regional Reliability Standards developed by the Western Electricity Coordinating Council (WECC) and approved by the North American Electric Reliability Corporation (NERC), which the Commission has certified as the Electric Reliability Organization (ERO) responsible for developing and enforcing mandatory Reliability Standards. These regional Reliability Standards have been designated by WECC as FAC-501-WECC-1--Transmission Maintenance, PRC- 004-WECC-1--Protection System and Remedial Action Scheme Misoperation, VAR-002-WECC-1--Automatic Voltage Regulators, and VAR-501-WECC-1--Power System Stabilizer. Reliability Standard FAC-501-WECC-1 addresses transmission maintenance for specified transmission paths in the Western Interconnection. Reliability Standard PRC-004-WECC-1 addresses the analysis of misoperations that occur on transmission and generation protection systems and remedial action schemes in the Western Interconnection. Reliability Standard VAR-002-WECC-1 is meant to ensure that automatic voltage regulators remain in service on synchronous generators and condensers in the Western Interconnection. Reliability Standard VAR-501-WECC-1 is meant to ensure that power system stabilizers remain in service on synchronous generators in the Western Interconnection. In addition, the Commission approves five new regional definitions applicable within the Western Interconnection. --------------------------------------------------------------------------- \1\ 16 U.S.C. 824o (2006). --------------------------------------------------------------------------- I. Background A. Mandatory Reliability Standards 2. Section 215 of the FPA requires a Commission-certified ERO to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO, subject to Commission oversight, or by the Commission independently.\2\ --------------------------------------------------------------------------- \2\ 16 U.S.C. 824o(e)(3). --------------------------------------------------------------------------- 3. Reliability Standards that the ERO proposes to the Commission may include Reliability Standards that are proposed to the ERO by a Regional Entity to be effective in that region.\3\ A Regional Entity is an entity that has been approved by the Commission to enforce Reliability Standards under delegated authority from the ERO.\4\ When the ERO reviews a regional Reliability Standard that would be applicable on an Interconnection-wide basis and that has been proposed by a Regional Entity organized on an Interconnection-wide basis, the ERO must rebuttably presume that the regional Reliability Standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest.\5\ In turn, the Commission must give ``due weight'' to the technical expertise of the ERO and of a Regional Entity organized on an Interconnection-wide basis.\6\ --------------------------------------------------------------------------- \3\ 16 U.S.C. 824o(e)(4). \4\ 16 U.S.C. 824o(a)(7) and (e)(4). \5\ 18 CFR 39.5 (2010). \6\ 16 U.S.C. 824o(d)(2). --------------------------------------------------------------------------- 4. In Order No. 672, the Commission urged uniformity of Reliability Standards, but recognized a potential need for regional differences.\7\ Accordingly, the Commission stated that: --------------------------------------------------------------------------- \7\ Rules Concerning Certification of the Electric Reliability Organization; Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, 71 FR 8662 (Feb. 17, 2006), FERC Stats. & Regs. ] 31,204, at P 290, order on reh'g, Order No. 672-A, 71 FR 19814 (Apr. 18, 2006), FERC Stats. & Regs. ] 31,212 (2006). As a general matter, we will accept the following two types of regional differences, provided they are otherwise just, reasonable, not unduly discriminatory or preferential and in the public interest, as required under the statute: (1) a regional difference that is more stringent than the continent-wide Reliability Standard, including a regional difference that addresses matters that the continent-wide Reliability Standard does not; and (2) a regional Reliability Standard that is necessitated by a physical difference in the Bulk-Power System.\8\ --------------------------------------------------------------------------- \8\ Id. P 291. --------------------------------------------------------------------------- B. Western Electricity Coordinating Council 5. On April 19, 2007, the Commission accepted delegation agreements between NERC and each of eight Regional Entities.\9\ In its order, the Commission accepted WECC as a Regional Entity

Read the complete text