Version One Regional Reliability Standard for Transmission Operations

Energy Department; Federal Energy Regulatory Commission · 2011

Read Version One Regional Reliability Standard for Transmission Operations by Energy Department; Federal Energy Regulatory Commission (2011) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/uslaw-fr-2011-10051.txt.

Description

Rule published in the Federal Register on 2011-04-27 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 23470-23477] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-10051] [[Page 23470]] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 40 [Docket No. RM09-14-000; Order No. 752] Version One Regional Reliability Standard for Transmission Operations AGENCY: Federal Energy Regulatory Commission.

Catalog record

CREATOREnergy Department; Federal Energy Regulatory Commission
YEAR2011
COLLECTIONLAW
FORMATTXT
FILE SIZE62 KB
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEFederal Register

Source: https://www.federalregister.gov/documents/2011/04/27/2011-10051/version-one-regional-reliability-standard-for-transmission-operations

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Version One Regional Reliability Standard for Transmission Operations Citation: us:fr:2011-10051 Creator: Energy Department; Federal Energy Regulatory Commission Year: 2011 Source-URL: https://www.federalregister.gov/documents/2011/04/27/2011-10051/version-one-regional-reliability-standard-for-transmission-operations Context: Rule published in the Federal Register on 2011-04-27 by Energy Department; Federal Energy Regulatory Commission. Text from federalregister.gov (official edition: govinfo). [Pages 23470-23477] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2011-10051] [[Page 23470]] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 40 [Docket No. RM09-14-000; Order No. 752] Version One Regional Reliability Standard for Transmission Operations AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. ----------------------------------------------------------------------- SUMMARY: Under section 215(d)(2) of the Federal Power Act, the Federal Energy Regulatory Commission approves regional Reliability Standard TOP-007-WECC-1 (System Operating Limits) developed by the Western Electric Coordinating Council (WECC) and submitted to the Commission for approval by the North American Electric Reliability Corporation. The primary purpose of this regional Reliability Standard is to ensure that actual flows and associated scheduled flows on major WECC transfer paths do not exceed system operating limits for more than 30 minutes. The Commission also approves the retirement of WECC regional Reliability Standard TOP-STD-007-0, which is replaced by the regional Reliability Standard approved in this Final Rule. The Commission also directs WECC to modify the associated violation risk factors and violation severity levels. DATES: Effective Date: This rule will become effective June 27, 2011. FOR FURTHER INFORMATION CONTACT: William Edwards (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. (202) 502-6669. Mindi Sauter (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. (202) 502-6830. E. Nick Henery (Technical Information), Office of Electric Reliability, Division of Policy Analysis and Rulemaking, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. (202) 502- 8636. Danny Johnson (Technical Information), Office of Electric Reliability, Division of Reliability Standards, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. (202) 502- 8892. SUPPLEMENTARY INFORMATION: Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Issued April 21, 2011. 1. Under section 215(d)(2) of the Federal Power Act (FPA),\1\ the Commission approves regional Reliability Standard TOP-007-WECC-1 (System Operating Limits) developed by the Western Electricity Coordinating Council (WECC) and submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC).\2\ The primary purpose of the approved regional Reliability Standard is to ensure that actual flows and associated scheduled flows on major WECC transfer paths do not exceed system operating limits (SOL) for more than 30 minutes. The Commission also approves the retirement of WECC regional Reliability Standard TOP-STD-007-0, which is replaced by the regional Reliability Standard approved in this Final Rule. The Commission also directs WECC to modify the associated violation risk factors (VRF) and violation severity levels (VSL). --------------------------------------------------------------------------- \1\ 16 U.S.C. 824o (2006). \2\ North American Electric Reliability Corp., 116 FERC ] 61,062, order on reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009). --------------------------------------------------------------------------- I. Background A. Mandatory Reliability Standards 2. Section 215 of the FPA requires a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO, subject to Commission oversight, or by the Commission independently.\3\ --------------------------------------------------------------------------- \3\ See 16 U.S.C. 824o(e). --------------------------------------------------------------------------- 3. Reliability Standards that the ERO proposes to the Commission may include Reliability Standards that are proposed to the ERO by a Regional Entity to be effective in that region.\4\ In Order No. 672,\5\ the Commission noted that: --------------------------------------------------------------------------- \4\ A Regional Entity is an entity that has been approved by the Commission to enforce Reliability Standards under delegated authority from the ERO. See 16 U.S.C. 824o(a)(7) and (e)(4). \5\ Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204 (2006), order on reh'g, Order No. 672-A, FERC Stats. & Regs. ] 31,212 (2006). As a general matter, we will accept the following two types of regional differences, provided they are otherwise just, reasonable, not unduly discriminatory or preferential and in the public interest, as required under the statute: (1) A regional difference that is more stringent than the continent-wide Reliability Standard, including a regional difference that addresses matters that the continent-wide Reliability Standard does not; and (2) a regional Reliability Standard that is necessitated by a physical difference in the Bulk-Power System.\6\ --------------------------------------------------------------------------- \6\ Id. P 291. When the ERO reviews a regional Reliability Standard that would be applicable on an interconnection-wide basis and that has been proposed by a Regional Entity organized on an Interconnection-wide basis, the ERO must rebuttably presume that the regional Reliability Standard is just, reasonable, not unduly discriminatory or preferential, and in the public interest.\7\ In turn, the Commission must give ``due weight'' to the technical expertise of the ERO and of a Regional Entity organized on an interconnection-wide basis.\8\ --------------------------------------------------------------------------- \7\ 16 U.S.C. 824o(d)(3). \8\ Id. Sec. 824o(d)(2). --------------------------------------------------------------------------- B. WECC Regional Reliability Standards 4. On April 19, 2007, the Commission accepted delegation agreements between NERC and each of eight Regional Entities.\9\ In the order, the Commission accepted WECC as a Regional Entity organized on an interconnection-wide basis. As a Regional Entity, WECC oversees Bulk- Power System reliability in the Western Interconnection. The WECC region encompasses nearly 1.8 million square miles, including 14 western U.S. states, the Canadian provinces of Alberta and British Columbia, and the northern portion of Baja California in Mexico. --------------------------------------------------------------------------- \9\ North American Electric Reliability Corp., 119 FERC ] 61,060 (2007). --------------------------------------------------------------------------- 5. In June 2007, the Commission approved eight regional Reliability Standards that apply in the Western Interconnection, including TOP-STD- 007-0.\10\ Currently-effective TOP-STD-007-0 has the stated purpose of ensuring that the Western Interconnection's operating transfer capability (OTC) limits requirements are not exceeded. In approving the current regional Reliability Standard, the Commission found that it was more stringent than the corresponding continent-wide Reliability Standard TOP-007-0. --------------------------------------------------------------------------- \10\ North American Electric Reliability Corp., 119 FERC ] 61,260 (2007) (June 2007 Order). --------------------------------------------------------------------------- 6. However, the Commission also directed WECC to develop modifications to TOP-STD-007-0 to address certain shortcomings identified by NERC with regard to such matters as format, aligning WECC regional definitions with the NERC Glossary of Terms used in Reliability Standards, [[Page 23471]] and removing compliance and measure references.\11\ --------------------------------------------------------------------------- \11\ Id. P 55, 110. --------------------------------------------------------------------------- C. WECC Regional Reliability Standard TOP-007-WECC-1 7. On March 25, 2009, NERC submitted a petition to the Commission seeking approval of TOP-007-WECC-1 and requesting the concurrent retirement of currently effective TOP-STD-007-0.\12\ NERC requests an effective date for the proposed regional Reliability Standard on the first day of the first quarter after applicable regulatory approval. --------------------------------------------------------------------------- \12\ North American Reliability Corp., March 25, 2009 Petition for Approval of Proposed Western Electric Coordinating Council Regional Reliability Standard TOP-007-WECC-1 (NERC Petition). --------------------------------------------------------------------------- 8. TOP-007-WECC-1 applies to transmission operators for the transmission paths in the most current table titled ``Major WECC Transfer Paths in the Bulk Electric System'' (WECC Transfer

Read the complete text