Mitigation of transient beam loading in a compact high duty cycle injector via hardware upgrade and multi-objective optimization
Hao Hu, Yu’ang Xia, Yan Wang, Yifeng Zeng, Kaifeng Liu, Tongning Hu · 2026
Read Mitigation of transient beam loading in a compact high duty cycle injector via hardware upgrade and multi-objective optimization by Hao Hu, Yu’ang Xia, Yan Wang, Yifeng Zeng, Kaifeng Liu, Tongning Hu (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/PMC13550539.txt.
Description
Hao Hu and colleagues redesign a compact electron injector so its beam stays even from the first pulse to the last, in a 2026 accelerator engineering paper. The injector feeds a high-power terahertz free-electron laser. At high duty cycles the beam itself drains the accelerating fields unevenly. That effect, transient beam loading, spoils energy and timing uniformity across the pulse train.
Their fix splits the radio-frequency power feeds so the two accelerating structures can be timed independently, and makes the first cavity's coupling adjustable. A many-objective genetic algorithm then tuned four settings jointly: injection time, radio phase, coupling, and the delay between structures. Single-knob tuning could not balance energy and phase together, but the global search settled the macropulse near fourteen million electron volts with minimal spread. Simulations support the design for similar compact machines.
Catalog record
| CREATOR | Hao Hu, Yu’ang Xia, Yan Wang, Yifeng Zeng, Kaifeng Liu, Tongning Hu |
|---|---|
| YEAR | 2026 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 35371 |
| LICENSE | https://creativecommons.org/licenses/by/4.0 |
| RIGHTS | CC BY |
| SOURCE | Europe PMC |