BIM-integrated carbon footprint assessment for sustainable buildings using real-time monitoring and optimization

Sixu Yu, Yuyang Zhang · 2026

Read BIM-integrated carbon footprint assessment for sustainable buildings using real-time monitoring and optimization by Sixu Yu, Yuyang Zhang (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/pmc-13328572.txt.

Description

Sixu Yu and Yuyang Zhang built a system that tracks and cuts a building's carbon output in real time in two thousand twenty-six. Static checks miss how a building runs hour by hour. Their framework joins a digital building model with live sensor data and artificial intelligence in four layers.

They ran it for twelve months in a large certified green office building. Running emissions fell by twenty-six point five percent from the baseline, while comfort stayed acceptable. A forecasting module predicted the next day with about ninety-two percent accuracy. About eighteen percent of emissions came when the building was empty, a pattern static checks would miss. Payback was estimated at under two years.

Catalog record

CREATORSixu Yu, Yuyang Zhang
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE50 KB
VERSION1.0
LICENSECC BY 4.0
RIGHTSCC BY
SOURCEEurope PMC

Source: https://europepmc.org/articles/PMC13328572

Browse the full library · About the Tower of Babel