Intelligent system in the cost control of commercial complex projects: Data-driven optimization method

Shiming Wang, Yifei Li, Debao Yao, Xiao Li, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran · 2026

Read Intelligent system in the cost control of commercial complex projects: Data-driven optimization method by Shiming Wang, Yifei Li, Debao Yao, Xiao Li, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/PMC13278410.txt.

Description

Shiming Wang leads a 2026 study of an intelligent, data-driven method for controlling costs in large commercial complex building projects. Such projects mix shopping, dining, offices, and housing, and their costs are hard to manage. The method joins value engineering, a way to raise value per cost, with a fuzzy ranking model to weigh building functions against their costs in real time.

Applied to an existing commercial complex, the optimized approach cut total cost by about two point nine percent against traditional methods across civil, building, heating, and electrical work. Continuous monitoring is meant to curb wasteful building choices as work proceeds. Post-project reviews feed lessons back into the system for later projects.

Catalog record

CREATORShiming Wang, Yifei Li, Debao Yao, Xiao Li, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran, Tien Anh Tran
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE95632
LICENSEhttps://creativecommons.org/licenses/by/4.0
RIGHTSCC BY
SOURCEEurope PMC

Source: https://europepmc.org/article/MED/PMC13278410

Browse the full library · About the Tower of Babel