Investigation on a Novel Reinforcement Method of Grouting Sleeve Connection Considering the Absence of Reserved Reinforcing Bars in the Transition Layer

Sheng Gu, Jun Yang, Saifeng Shen, Xing Li · 2024

Read Investigation on a Novel Reinforcement Method of Grouting Sleeve Connection Considering the Absence of Reserved Reinforcing Bars in the Transition Layer by Sheng Gu, Jun Yang, Saifeng Shen, Xing Li (2024) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/pmc-11643728.txt.

Description

Sheng Gu, Jun Yang, Saifeng Shen, and Xing Li test a repair for a building joint in 2024. Prefab concrete parts join through grouted sleeves, but missing starter bars in the joint layer can cripple the link. The flaw shows up after quality checks or build errors.

The team proposed a fix and built forty-five test pieces with varied settings, plus nine pieces to check weld fit. Two sleeve steels welded well to the bars; cast iron did not. With a long enough weld, pieces failed by bar snapping rather than joint slip. The fix looks workable for the defect, they conclude.

Catalog record

CREATORSheng Gu, Jun Yang, Saifeng Shen, Xing Li
YEAR2024
COLLECTIONPAPERS
FORMATTXT
FILE SIZE35 KB
VERSION1.0
LICENSECC BY 4.0
RIGHTSCC BY
SOURCEEurope PMC

Source: https://europepmc.org/articles/PMC11643728

Browse the full library · About the Tower of Babel