An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project

Mohammad Senisel Bachari, Asgar Khademvatani, Mahdi Iranfar · 2026

Read An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project by Mohammad Senisel Bachari, Asgar Khademvatani, Mahdi Iranfar (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/plos-pone-0357560.txt.

Description

Mohammad Senisel Bachari, Asgar Khademvatani, and Mahdi Iranfar tackle risk planning for large construction projects in a 2026 PLOS ONE article. Big builds face risks that interact, and older planning methods tend to treat each phase separately. Their framework joins the whole chain, from spotting risks and judging them to picking responses, into one system that can weigh fuzzy, judgment based inputs.

A case study on a real liquefied petroleum gas pipeline project puts the framework to work. It sorted twenty distinct risks and twelve possible responses, then used an optimization model to choose the best six responses within the project's limits. That chosen set cut the project's total risk value by more than a third, showing how the method turns expert judgment into a concrete plan.

Catalog record

CREATORMohammad Senisel Bachari, Asgar Khademvatani, Mahdi Iranfar
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE102580
LICENSECC_BY
RIGHTSCC BY
SOURCEPLOS

Source: https://doi.org/10.1371/journal.pone.0357560

Browse the full library · About the Tower of Babel