Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards
Huawei Wang, Chunjie Xu, Yunjiao Hou, Jiahuan Zhang, Zongyang Liu · 2026
Read Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards by Huawei Wang, Chunjie Xu, Yunjiao Hou, Jiahuan Zhang, Zongyang Liu (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/plos-pone-0357406.txt.
Description
Huawei Wang led a team of five authors improving crane scheduling in railway freight yards, published in PLOS ONE in 2026. Rail-mounted gantry cranes move containers between trains and trucks, and poor scheduling jams the whole yard. The team built a flexible scheduling method that balances several goals at once.
Wang's model weighs speed against energy use and fairness across jobs, instead of chasing one target. Yards must make that trade-off daily as trains arrive off schedule. A model that bends without breaking helps dispatchers keep freight moving. Faster, steadier yards lower the cost of rail freight, which matters for shifting goods off roads and cutting transport emissions at the same time.
Catalog record
| CREATOR | Huawei Wang, Chunjie Xu, Yunjiao Hou, Jiahuan Zhang, Zongyang Liu |
|---|---|
| YEAR | 2026 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 50522 |
| LICENSE | CC_BY |
| RIGHTS | CC BY |
| SOURCE | PLOS |