Preventive spare parts supply strategy for large-scale equipment based on performance degradation

Yongjia Gao, Jieyu Liu, Can Li, Qiang Shen, Ruiyan Zhang, Zhichao Feng · 2026

Read Preventive spare parts supply strategy for large-scale equipment based on performance degradation by Yongjia Gao, Jieyu Liu, Can Li, Qiang Shen, Ruiyan Zhang, Zhichao Feng (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/plos-pone-0348476.txt.

Description

Keeping spare parts ready keeps big machines running, but replacing parts on a fixed calendar wastes money and still misses failures. Yongjia Gao and colleagues propose timing part supply by how far a machine's performance has worn down, in this 2026 PLOS One engineering paper.

Their method scores machine health from several signs, draws a band describing how health declines, and fits a standard wear curve to that band. From expected health, they compute how many parts will be needed and when to order, allowing for shipping time. The aim is shorter stoppages and fewer parts bought too early or too late.

Catalog record

CREATORYongjia Gao, Jieyu Liu, Can Li, Qiang Shen, Ruiyan Zhang, Zhichao Feng
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE62544
LICENSECC_BY
RIGHTSCC BY
SOURCEPLOS

Source: https://doi.org/10.1371/journal.pone.0348476

Browse the full library · About the Tower of Babel