Intelligent system in the cost control of commercial complex projects: Data-driven optimization method
Shiming Wang, Yifei Li, Debao Yao, Xiao Li · 2026
Read Intelligent system in the cost control of commercial complex projects: Data-driven optimization method by Shiming Wang, Yifei Li, Debao Yao, Xiao Li (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/plos-pone-0343158.txt.
Description
Shiming Wang and colleagues propose a data-driven system for keeping the cost of building commercial complexes, malls and mixed-use giants, under control. Such projects sprawl across functions and trades, and overruns hide until late. Their framework applies value engineering, a discipline that prices every function a building must perform, and ranks those functions with a fuzzy version of a standard priority method that tolerates expert disagreement.
Cost and value coefficients for each function are then watched in real time, flagging construction choices whose price outruns their worth while change is still cheap. The authors validated the approach by re-running an existing complex through it and comparing the outcome with what actually happened. For developers, the appeal is a control room for cost that argues in functions, not just invoices.
Catalog record
| CREATOR | Shiming Wang, Yifei Li, Debao Yao, Xiao Li |
|---|---|
| YEAR | 2026 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 54174 |
| LICENSE | CC_BY |
| RIGHTS | CC BY |
| SOURCE | PLOS |