An act to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington.

United States Congress · 2000

Read An act to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington. by United States Congress (2000) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/plaw-106-372-2000.txt.

Description

A Washington pumping plant study is broadened by Public Law 106-372, approved October 27, 2000. It amends an earlier law about electrification of the Chandler Pumping Plant at Prosser Diversion Dam. The heading gains the words or Water Exchange, and a new alternative is added.

As an alternative to electrification, the Secretary may use up to four million dollars of the appropriated sums to study the engineering feasibility of a water exchange. The exchange would swap Columbia River water for water historically diverted from the Yakima River. The study is done with the Kennewick Irrigation District and in consultation with the Bonneville Power Administration, with a report required.

Catalog record

CREATORUnited States Congress
YEAR2000
COLLECTIONDECLASSIFIED
FORMATTXT
FILE SIZE2708
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEGovernment Publishing Office (govinfo.gov)

Source: https://www.govinfo.gov/app/details/PLAW-106publ372

Browse the full library · About the Tower of Babel