ATIVAÇÃO DE UMA SUBESTAÇÃO DE 69 KV: ANÁLISE DE CONFORMIDADE NORMATIVA NA UFAL A.C. SIMÕES
Arthur Pereira da Costa, Igor Cavalcante Torres, Wellinsilvio Costa dos Santos · 2026
Read ATIVAÇÃO DE UMA SUBESTAÇÃO DE 69 KV: ANÁLISE DE CONFORMIDADE NORMATIVA NA UFAL A.C. SIMÕES by Arthur Pereira da Costa, Igor Cavalcante Torres, Wellinsilvio Costa dos Santos (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/openalex-w7213279265.txt.
Description
Arthur Pereira da Costa leads a team that checks a dead power post at a Brazil state college. The post, built to take high-strain power, sits idle at the A.C. Simoes grounds of the Federal College of Alagoas. The team walked the site and read the plans next to the rules of the state's power firm. A shift to the high line looms, and the post must be fit for it.
The plans, they find, fail the rules at the core. The civil, wired, and frame plans all hold flaws, in the size of the big gear most of all. Deep rework is the price of life for the post. One stroke of luck helps: the firm is building a fresh post close by, and a tie to it can make the link sound.
Catalog record
| CREATOR | Arthur Pereira da Costa, Igor Cavalcante Torres, Wellinsilvio Costa dos Santos |
|---|---|
| YEAR | 2026 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 27 KB |
| LICENSE | CC BY 4.0 |
| RIGHTS | CC BY |
| SOURCE | OpenAlex / Revista Ibero-Americana de Humanidades, Ciências e Educação |