Guidelines for reporting non-randomised pilot and feasibility studies.

Lancaster GA, Thabane L. · 2019

Read Guidelines for reporting non-randomised pilot and feasibility studies. by Lancaster GA, Thabane L. (2019) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/europmc-pmc6778655.txt.

Introduction

Lancaster and Thabane offer guidelines for reporting non-randomized pilot and feasibility studies. Submissions to the journal Pilot and Feasibility Studies keep rising. A 2016 CONSORT extension covered randomized pilot trials well. Authors of non-randomized versions were left unsure how to report. This editorial fills that gap with general guidance.

The advice is to use the CONSORT pilot extension as the main reference anyway. Most items can be adapted, or skipped when they do not apply. Supplementary checklists on the Equator website can help alongside it. The journal had published 379 studies by the end of 2018. Consistent reporting should make this growing literature easier to read and reuse.

Catalog record

CREATORLancaster GA, Thabane L.
YEAR2019
COLLECTIONPAPERS
FORMATTXT
FILE SIZE30 KB
LICENSECC BY 4.0
RIGHTSCC BY
SOURCEEurope PMC

Source: https://europepmc.org/articles/PMC6778655

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Guidelines for reporting non-randomised pilot and feasibility studies By Gillian A Lancaster, Lehana Thabane Published in: Pilot and Feasibility Studies DOI: 10.1186/s40814-019-0499-1 ABSTRACT Abstract As the number of submissions to Pilot and Feasibility Studies increases, there is a need for good quality reporting guidelines to help researchers tailor their reports in a way that is consistent and helpful to other readers. The publication in 2016 of the CONSORT extension to pilot and feasibility trials filled a much-needed gap, but there still remains some uncertainty as to how to report pilot and feasibility studies that are not randomised. This editorial aims to provide some general guidance on how to report the most common types of non-randomised pilot and feasibility studies that are submitted to the journal. We recommend using the CONSORT extension to pilot and feasibility trials as the main reference document—it includes detailed elaboration and explanation of each item, and in most cases, simple adaptation, or non-use of items that are not applicable, will suffice. Several checklists found on the Equator website may provide helpful supplementary guidance, when used alongside the CONSORT extension, and we give some examples. INTRODUCTION Since the inception of the BMC journal Pilot and Feasibility Studies in 2015 [1], the number of published studies has risen sharply each year, totalling 379 by the end of 2018. In 2016, the Consolidated Standards of Reporting Trials (CONSORT) extension to randomised pilot and feasibility trials and two related methodology papers were published by the Pilot and Feasibility Studies (PAFS) Working Group (see the “Acknowledgements” section) to aid researchers in the planning and reporting of these types of studies [2–5]. An associated PAFS website was created as a point of reference for information about pilot and feasibility studies and associated events (https://pilotandfeasibilitystudies.qmul.ac.uk/). Recently, we also published an editorial guide to the reporting of protocols of randomised pilot and feasibility trials [6], recommending the use of the CONSORT extension guideline [2, 3] alongside the SPIRIT (Standard Protocol Items: Recommendations for Interventional Trials) checklist [7]. These publications have focused on guidelines for reporting randomised pilot and feasibility trials, but as the number of manuscript submissions to the journal continues to increase (by 200% from 2015 to 2018), there has arisen a need for some guidance on the reporting of non-randomised pilot and feasibility studies. Many non-randomised studies are undertaken before a randomised pilot or feasibility trial takes place and may comprise a wide spectrum of study designs. In this editorial, we discuss the most common types of non-randomised studies seen in the journal and give guidance on how they should be reported. In most cases, we recommend referring to the CONSORT extension to pilot and feasibility trials [2, 3] as many of the items (excluding items that are specific to the randomisation nature of the study) will be relevant for reporting other types of pilot and feasibility studies, and the guideline provides helpful examples and commentary for each of the 26 items. Many other guidelines exist on the Equator (Enhancing the QUAlity and Transparency Of health Research) website (http://www.equator-network.org/), and with minor amendments, some can be adapted for reporting certain types of non-randomised studies. This editorial is based on our experience of submissions to the journal over the past 4 years, and while it does not provide comprehensive coverage of all types of non-randomised pilot and feasibility studies, it will hopefully provide some useful suggestions and signposts to relevant guidance and examples as an aid to reporting these studies. A point to note here is that our work to date has shown that there is a lack of consensus over the usage of the words ‘pilot’ and ‘feasibility’ [4], and so as a consequence, both terms are currently being used interchangeably in the journal. GUIDANCE FOR REPORTING NON-RANDOMISED PILOT AND FEASIBILITY STUDIES FOR SUBMISSION TO THE JOURNAL In the journal Pilot and Feasibility Studies, aided by the CONSORT extension to pilot and feasibility trials, authors are encouraged to report the purpose of a feasibility or pilot study in the context of the planned future study. Many types of non-randomised feasibility studies are at an earlier stage of preparation to that of a randomised pilot or feasibility trial. The proposed methodology and procedures for the main randomised controlled trial (RCT) may still be under development and not yet ready to fully pilot test. These studies usually focus on one or more related but substantive areas of development along the RCT preparatory pathway (e.g. intervention development, development of patient-reported outcome measures (PROMS), piloting of several components of the main trial and piloting the feasibility of implementation). Moreover, not all pilot and feasibility studies relate to trials or interventional studies; some concern testing out design features of future large-scale cohort studies, such as the feasibility of roll-out across a wide area or being able to obtain buy-in from different stakeholders. Other researchers may want to test the feasibility of preliminary hypotheses of associations between variables that may be important to inform future research before any kind of intervention is developed or future study planned. Table 1 lists the main types of non-randomised feasibility studies seen in the journal, and we provide guidance and examples for reference. [Table: Main types of non-randomised feasibility studies submitted to the journal, where to find guidance and published examples] Intervention development Studies that describe intervention development typically adopt mainly qualitative methods. The Template for Intervention Description and Replication (TIDieR) guideline exists for reporting intervention description [8]. Intervention development studies often describe a theoretical model that underpins the reasoning behind the intervention and through literature review or focus group work develop a feasible intervention model. This new intervention is then tried out on a small number of patients and adopted or modified as necessary. The first thematic series of the journal covered intervention development and drew upon the expertise of guest editor, Professor Pat Hoddinott, to oversee the papers contributing to the series. Around the same time, Professor Alicia O’Cathain and colleagues published a guidance paper on maximising the impact of qualitative research in feasibility studies for RCTs (a highly accessed article) [9]. Hand in hand with the nine papers in the thematic series, these provide a good set of examples covering issues of complex intervention development [10–12] and strategic optimisation [13], a person-based approach to enhancing acceptability [14], intervention mapping [15] and obtaining clinical collaboration through a Knowledge to Action framework [16]. Development of PROMs PROM development, or development of any questionnaire-based outcome measure, has some methodological similarities to the previous section in terms of selection of the proposed items for the PROM. Items generally stem from an underlying theoretical model and literature review, aided by focus group work with some preliminary testing. The PROM is then assessed for its preliminary reliability and validity in certain patient populations related to its intended use. In our second thematic series of the journal, guest editor, Professor Georgina Jones, presents seven papers that represent the types of pilot work that might take place in PROM development, including issues of translation and back-translation for use in another language [17], time and cost of administration [18], technology-based assessment [19] and the use of e-PROMS [20]. In another study, the authors follow the RE-AIM (Reach, Effectiveness,

Read the complete text