Read POWER ELECTRONICS GRID TIED SYSTEM FINAL REPORT by Campbell, Steven, Chinthavali, Madhu Sudhan, Starke, Michael (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/doe-osti-3740797-power-electronics-grid-tied-system-final.txt.

Introduction

Oak Ridge report ORNL/TM-2025/4295, dated October 2025, closes CRADA NFE-21-05953 on a grid-tied power electronics system. Steven Campbell, Madhu Chinthavali, and Michael Starke are the printed authors. Utilities face a messy task wiring scattered energy gear into one grid. Differing owners, controls, and device types push each job toward a one-off design. The project set out to show a repeatable fix at low voltage.

Separate resources were grouped into a single node that a utility can dispatch like one plant. The node also keeps key loads alive during outages. Hardware trials ran at the GRID-C testbed in Building 3114. Solar, storage, grid ties, and loads joined on a direct-current bus spanning eight hundred to fifteen hundred volts, tied to one fused box for safety. Layered software agents ran each unit. A utility partner helped shape test cases around cheap dispatch and outage survival.

Catalog record

CREATORCampbell, Steven, Chinthavali, Madhu Sudhan, Starke, Michael
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE24 KB
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEDOE OSTI

Source: https://www.osti.gov/biblio/3740797

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

ORNL/TM-2025/4295 Oak Ridge National Laboratory: Power Electronics Grid Tied System Final CRADA Report Steven Campbell CRADA final report for Madhu Chinthavali CRADA number NFE-21-05953 Michael Starke Approved for public release. October 2025 Distribution is unlimited. ORNL is managed by UT-Battelle LLC for the US Department of Energy DOCUMENT AVAILABILITY Online Access: US Department of Energy (DOE) reports produced after 1991 and a growing number of pre-1991 documents are available free via https://www.osti.gov. The public may also search the National Technical Information Service’s National Technical Reports Library (NTRL) for reports not available in digital format. DOE and DOE contractors should contact DOE’s Office of Scientific and Technical Information (OSTI) for reports not currently available in digital format: US Department of Energy Office of Scientific and Technical Information PO Box 62 Oak Ridge, TN 37831-0062 Telephone: (865) 576-8401 Fax: (865) 576-5728 Email: [email protected] Website: www.osti.gov This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. FINAL REPORT CERTIFICATION (ORNL-851) ORNL/TM-2025/4295 Electrification and Energy Infrastructure Research Division POWER ELECTRONICS GRID TIED SYSTEM FINAL REPORT Steven Campbell Madhu Chinthavali Michael Starke October 2025 Prepared by OAK RIDGE NATIONAL LABORATORY Oak Ridge, TN 37831 managed by UT-BATTELLE LLC for the US DEPARTMENT OF ENERGY under contract DE-AC05-00OR22725 iii CONTENTS LIST OF FIGURES ......................................................................................................................................iv ABBREVIATIONS .......................................................................................................................................v ABSTRACT...................................................................................................................................................7 1. STATEMENT OF OBJECTIVES .........................................................................................................7 2. BENEFITS TO THE FUNDING DOE OFFICE’S MISSION..............................................................7 3. TECHNICAL DISCUSSION OF WORK PERFORMED BY ALL PARTIES ...................................7 4. PLANS FOR FUTURE COLLABORATION ....................................................................................17 5. CONCLUSION....................................................................................................................................17 LIST OF FIGURES Figure 1: Economic power dispatch and resiliency use cases. ......................................................................8 Figure 2: Single Line Diagram of the GRID-C testbed at Building 3114. ....................................................9 Figure 3: Testbed with source, resource, and load connections...................................................................10 Figure 4: Testbed with converters tied to each source, resource, and load..................................................11 Figure 5: RIC PV agents including interface, intelligence, converter, and resource agents........................12 Figure 6: RIC grid agents including interface, intelligence, converter, and resource agents. .....................12 Figure 7: RMC interface with adopted grid and PV systems. .....................................................................13 Figure 8: Dashboard showing initial node operation with active PV and grid. ...........................................13 Figure 9: RIC showing ES agents launched – ES initialized to faulted state. .............................................14 Figure 10: RMC with PV and grid running and ES in faulted state. ...........................................................14 Figure 11: Dashboard showing node operation with PV and grid interconnected and ES inactive but available to the node. ................................................................................................................15 Figure 12: RMC showing node operation with PV, grid, and ES interconnected and active......................15 Figure 13: ES agents active and regulated to the optimized setpoint from RMC........................................16 Figure 14: Dashboard showing Node operation with PV, grid, and ES interconnected and active. ...........16 Figure 15: SCS and ORNL Technical Discussion Regarding Future Testbed Deployment. (L–R: Steven Campbell, Brendan Preece, and Jason Autrey)...................................................................17 iv ABBREVIATIONS AC Alternating Current CHIL Computer-Hardware-in-the-Loop CRADA Cooperative Research and Development Agreement DAB Dual-Active-Bridge DC Direct Current DER Distributed Energy Resource DOE US Department of Energy ES Energy Storage GRID-C Grid Research Innovation and Development Center HUB Energy Hub HVAC Heating, Ventilation, and Air Conditioning kW Kilowatt kWh Kilowatt hour M3PE Modular Medium-Voltage Multiport Power Electronics MVAC Medium Voltage Alternating Current NTRL National Technical Reports Library OE Office of Electricity ORNL Oak Ridge National Laboratory OSTI Office of Scientific and Technical Information PE Power Electronic PV Photovoltaic RIC Resource Integration Controller RMC Resource Management Controller SCS Southern Company Services SSPS Solid State Power Substation TM Technical Memorandum Vdc Volts Direct Current v vi ABSTRACT Across the country, electric utilities are grappling with the persistent hurdles of integrating Distributed Energy Resources (DERs). Managing these assets safely and effectively is a complex endeavor, complicated by varying ownership structures, management philosophies, and the diversity of the technologies themselves. Consequently, the industry has seen a proliferation of bespoke system designs, control strategies, and communication frameworks—forcing utilities to spend significant time and resources developing one-off integration solutions. This project addressed these integration hurdles through a scalable demonstration of intelligent devices designed to coordinate and control diverse resources in low-voltage applications. This concept minimized the need for complex integration by transforming the separate DERs into a dispatchable virtual power plant (VPP) with integrated resiliency functions (called a Node). By collaborating with a utility partner, the project focused on developing rapidly implementable use cases that bridged the gap between theoretical control and real-world deployment. 1. STATEMENT OF OBJECTIVES This project emphasized two critical pillars for modernizing the electric grid and overcoming DER integration hurdles: (1) an integrated ecosystem of power electronics and intelligent controllers capable of synchronizing functions to satisfy both economic and resiliency objectives, and (2) the validation of this platform through deployment in a live, real-world environment. To meet these targets, four challenges had to be overcome to ensure the proof of principle product was achieved: (1) the deployment of a scalable demonstration platforms with real-world environments for newly developed grid technology testing; (2) advanced components and new packaging and assembly of subsystems required for a heavy, customer interactive grid, (3) system integration solutions for in-field demonstrations of prototypes to accelerate the adoption of the technologies while minimizing customer risks associated with such early prototype demonstrations, and (4) integration methods for bridging the gap between high-risk research and development and technology adoption by utilities. 2. BENEFITS TO THE FUNDING DOE OFFICE MISSION This work directly aligned with the DOE Office of Electricity’s (OE) mission by accelerating the deployment of grid modernization solutions—a primary objective of the Grid Modernization Laboratory Consortium (GMLC). The project facilitated more efficient resource utilization while fostering the development of shared knowledge networks. Furthermore, by championing regional perspectives and strengthening ties between local stakeholders and industry partners, this initiative bolstered the foundational relationships necessary to advance a secure, resilient, and modern electric grid. 3. TECHNICAL DISCUSSION OF WORK PERFORMED BY ALL PARTIES Together, Oak Ridge National Laboratory (ORNL) and Southern Company Services (SCS) defined use cases for solid state power substations (SSPS) which incorporated typical scenarios (price responsive systems and resilient power delivery). These use cases have been validated in a computer-hardware-in- the-loop (CHIL) environment. For proof-of-principle, two different scenarios were combined into a single operational run at the Grid Research Innovation and Development Center (GRID-C) shown in Figure 1. This work leveraged a previous collaboration with SCS, where economic power dispatch optimization of a Node was the main objective (buy energy at a low cost, store, and use during a high cost period). In general, this capability provided a means for a utility to use price signals to incentivize Node control response (i.e. utility issues a high price signal when utility peak

Read the complete text