Project Phase 1 Report: Reducing Data Center Peak Cooling Demand and Energy Costs With Cold Underground Thermal Energy Storage (Cold UTES)

McTigue, Josh, Cole, Wesley, Oh, Hyunjun et al. · 2026

Read Project Phase 1 Report: Reducing Data Center Peak Cooling Demand and Energy Costs With Cold Underground Thermal Energy Storage (Cold UTES) by McTigue, Josh, Cole, Wesley, Oh, Hyunjun et al. (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/doe-osti-3377214-project-phase-1-report-reducing-data-cen.txt.

Introduction

Report NLR/TP-5700-100780, dated June 2026, closes phase one of a plan to cool data centers with stored cold. Josh McTigue of the National Laboratory of the Rockies heads a team from Berkeley Lab, the University of Chicago, Princeton, and the Energy Department's geothermal office. Data centers face cooling peaks on the hottest hours. Cold underground thermal energy storage banks chill in cheap hours and spends it at the peak. It asks how much peak load and cost the shift can cut.

Models pair the storage with growing data halls. Indoors, cold can idle the chillers at peak hours, freeing floor space. Outdoors, it trims dry coolers needed for extreme heat. Even so, space saved does not stop halls from crowding out IT gear. Under twelve percent grid growth, IT floor share falls to 54.4 percent by 2029 in a case. Phase one ends with those bounds for the design phase.

Catalog record

CREATORMcTigue, Josh, Cole, Wesley, Oh, Hyunjun et al.
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE351 KB
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEDOE OSTI

Source: https://www.osti.gov/biblio/3377214

Browse the full library · About the Tower of Babel