Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators
Talbot, Paul W., Bryan, Jacob A., McDowell, Dylan et al. · 2025
Read Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators by Talbot, Paul W., Bryan, Jacob A., McDowell, Dylan et al. (2025) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/doe-osti-3022420-navigating-integration-key-challenges-fo.txt.
Description
Idaho National Laboratory report INL/RPT-25-87663, by Paul Talbot and eight colleagues, examines what it will take to plug fast-growing data centers into a power system that includes nuclear generation. Data centers are projected to consume 6.7 to 12 percent of United States electricity by 2028, driven by artificial intelligence and cloud demand, while nuclear plants offer firm baseload power but move on slower siting and licensing timelines.
The report works stakeholder by stakeholder: data centers need speed and uptime, utilities face a flood of large-load interconnection requests, and nuclear providers must handle siting, ramping, and regulation. Grid risks are concrete, including an ERCOT review finding more than 30 near-miss events since 2020 in which large loads disconnected suddenly. Collaboration strategies close the report, tied to federal AI and energy initiatives.
Catalog record
| CREATOR | Talbot, Paul W., Bryan, Jacob A., McDowell, Dylan et al. |
|---|---|
| YEAR | 2025 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 134 KB |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | DOE OSTI |