Super-Efficient Air Conditioning
Premer, Jeffrey · 2026
Read Super-Efficient Air Conditioning by Premer, Jeffrey (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/doe-osti-2997806-super-efficient-air-conditioning.txt.
Introduction
Baryon Inc.'s final report on award DE-EE0009683 covers a super-efficient air conditioning project. Jeffrey Premer of Wilmington, Delaware, led work that ran from October 2022 with an extension to March 2025. The design centers on a cooler, called the BDC unit in project records, built around heat and mass exchangers, a membrane system, and a water distribution system. Every milestone in the plan is marked accomplished.
First-year work delivered thermal models of the cooler and a flow model of the water distribution. A model of the membrane system followed. Each was checked against literature data or simple experiments within stated bands of 5 to 10 percent. Candidate exchanger materials ranged from treated textiles to rigid Kraft paper, with uneven water spread noted as a flaw to fix. The second year reached the project's second go/no-go gate, a laboratory prototype judged against 70 percent of the target effectiveness.
Catalog record
| CREATOR | Premer, Jeffrey |
|---|---|
| YEAR | 2026 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 39 KB |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | DOE OSTI |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Final Report For submission to: Department of Energy, Energy Efficiency and Renewable Energy, EE-1 Award number: DE-EE0009683 Project title: Super-Efficient Air-Conditioning Unit Principal Investigator: Jeffrey Premer PI Phone: 702-888-2229 PI Email: [email protected] Submission date: August 10, 2026 DUNS: 080986082 Recipient Organization: Baryon Inc., 1013 Centre Road, Suite 403S, Wilmington, DE 19805 Project/Grant Period: Oct. 1, 2022 – Sept. 30, 2023, Extension period October 1, 2024 – March 31, 2025 Reporting Period End Date: March 31, 2025 Reporting Officer Jeffrey Premer This material is based upon work supported by the U.S. Department of Energy’s Office of Critical Minerals and Energy Innovation (CMEI) under the Building Technologies Office BENEFIT award number DE-EE0009683. 1. Accomplishments: What was done? What was learned? During the project, the team was able to achieve all of the milestones and the final project goal. The final effect of the project is an air conditioning module with a capacity of 10 kW (34,120 Btu/hr) operating in a real environment achieving 60-80% energy savings in comparison with the traditional system. At this stage the team is focused on development of the commercial prototype and continuation of testing and improving of different and more advanced versions of the prototypes. Tests were performed in order to improve the current design of the heat exchangers and develop better and more reliable solutions. The first commercial prototype of the unit was developed and it was tested during the last quarter of the project. The team continues their discussions with one of the world’s leading outsource manufacturing companies to pilot the commercial development of the technology. a. What are the major goals and objectives of this project? The objective of this project is to develop and validate a fully functional 10 kW (34,120 Btu/hr) air conditioning unit prototype capable of >60% average energy savings in comparison to baseline traditional residential and commercial cooling equipment, with a cooling coefficient of performance (COP) >12.5 in humid climatic conditions, net- zero water consumption, scalable to medium and large-scale units for different building types, and an installed cost of ≤$12/kBtu/h. MILESTONE SUMMARY Milestone Number SOPO Milestone Planned Status (sequential Task/ Verification Method (include Go/No Go Completion (accomplished/not numbering Subtask (Method for verifying success) metric) Date accomplished/ of Number milestones) partly completed) 1.1 1.1. Detailed thermal 1/1.1 09/01/22 Confirmation email to Federal models of the BDC Project Officer+ provides the Accomplished Q1 cooler which provide test methods and conditions for agreement within 5- testing. Verification conditions 10% with the will be selected based on literature data materials available in the most (Establishing detail recent and adequate literature design of the heat after approval from DOE. and mass exchangers for testing) 1.2 1.2. Detailed CFD 1/1.2 09/01/22 Confirmation email to Federal model of the water Project Officer+ provides the Accomplished Q2 distribution system test methods and conditions for which provides testing. Verification conditions agreement within will be determined based on 10% with the simple selected plate shape, which will experiments be selected based on a heat performed (Design of transfer model and confirmed the arrangements of with DOE. the water distribution system for testing) 1.3 Mathematical model 1/1.3 09/01/22 Confirmation email to Federal of the membrane Project Officer+ provides the Accomplished Q2 system which test methods and conditions for provides agreement testing. Verification conditions within 10% with the will be selected based on experimental data materials available. In the most recent and adequate literature after approval from DOE. G/N-G 1 Complete the BDC, 1 10/01/22 Confirmation email to Federal Accomplished Q3 water system, and Project Officer+ provides test dehumidification methods and conditions for system models, testing. Verification conditions achieving agreement will be selected based on within 10% of materials available in the most literature and recent and adequate literature laboratory data, and after approval from DOE. complete fabrication and testing of the BDC, water system, and dehumidification system. The water distribution system is able to distribute water with the diffusion rate of at least 0.3 cm2 on the plate materials of BDC cooler. The dehumidifier is able to reduce the humidity level of airflow of 0.6 CFM with a temperature equal to 25°C from 60% to 50%. 2.1 Selection of at least 2/2.1 11/01/23 Confirmation email to Federal Accomplished Q1 one pair of plate Project Officer+ provides the material (porous test methods and conditions for layer and testing. The plate materials will impenetrable be selected for the plate shape coating) determined during research Task 1. Verification conditions will be confirmed with DOE. 2.2 Simple system testing 2/2.5 08/01/23 Confirmation email to Federal Accomplished Q8 complete and Project Officer+ provides verification of the methods and conditions for assumed testing. Verification will be characteristics under realized under standard simulated heat ASHRAE conditions for (achieving at least certification of air conditioning 70% of the target equipment: minimal outdoor performance). temperature equal to 35°C/24 (DB/WB), maximal indoor temperature equal to 27/19°C (DB/WB). 2.3 Operating 2/2.6 08/01/23 Confirmation email to Federal Accomplished Q8 laboratory-based Project Officer+ provides the system made of the test methods and conditions for BDC cooler and testing. Verification will be MDPlus realized under standard dehumidifier. ASHRAE conditions for Performance to certification of air conditioning achieve at least 70% equipment: minimal outdoor of model predictions temperature equal to 35°C/24 for the same (DB/WB), maximal indoor geometry. temperature equal to 27/19°C (DB/WB). G/N-G 2 Demonstrate a 2 10/01/23 Confirmation email to Federal Accomplished Q8 laboratory-based Project Officer+ provides the prototype that will test methods and conditions for achieve ≥70% of the testing. Verification will be target effectiveness realized under standard during the ASHRAE conditions for experimental tests certification of air conditioning (42% energy savings equipment: minimal outdoor in comparison with temperature equal to 35°C/24 the traditional air (DB/WB), maximal indoor conditioning system) temperature equal to 27/19°C (DB/WB). 3.1 Thermal and mass 3/3.1 12/01/23 Confirmation email to Federal Accomplished Q9 transfer Project Officer+ provides the characteristics of the test methods and conditions for entire system testing. Verification will be (accuracy of 0.2ºC realized under standard and 2% RH). ASHRAE conditions for certification of air conditioning equipment: minimal outdoor temperature equal to 35°C/24 (DB/WB), maximal indoor temperature equal to 27/19°C (DB/WB). 3.2 Optimal 3/3.2 03/01/24 Confirmation email to Federal Accomplished Q10 configuration for the Project Officer+ provides the value proposition. test methods and conditions for testing 3.3 Air conditioning 3/3.3 10/01/2024 Confirmation email to Federal Accomplished Q14 module with a Project Officer+ provides test capacity of 10 kW methods and conditions for (34,120 Btu/hr) testing. Verification will be operating in a real realized under standard environment ASHRAE conditions for achieving 60-80% certification of air conditioning energy savings in equipment: minimal outdoor comparison with the temperature equal to 35°C/24 traditional system. (DB/WB), maximal indoor temperature equal to 27/19°C (DB/WB). 4.1 Completion of an 4/4.1 11/01/2023 Confirmation email to Federal Accomplished Q12 initial TEA Model for Project Officer. Components material selection will be optimized for standard and component ASHRAE conditions for optimization certification of air conditioning equipment: minimal outdoor temperature equal to 35°C/24 (DB/WB), maximal indoor temperature equal to 27/19°C (DB/WB). 4.2 Completion of a 4/4.2 10/01/2024 Confirmation email to Federal Accomplished Q12 detailed TEA Model Project Officer. Components for system will be optimized for standard fabrication and ASHRAE conditions for scaleup certification of air conditioning equipment: minimal