Cable from Lincoln Response to Refs re Coordination of Ops; Indication of Lack
Central Intelligence Agency · 1954
Read Cable from Lincoln Response to Refs re Coordination of Ops; Indication of Lack by Central Intelligence Agency (1954) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/cia-0000136246.txt.
Introduction
A cable in the declassified CIA files, dated 5 May 1954, covers an answer on the coordination of operations, noting a lack of it inside the mission. Traffic like this ran the field side of PBSUCCESS, the secret CIA effort against the Arbenz government in Guatemala. Small as it is, the sheet documents one task, one report, or one order inside a much larger secret effort.
Catalog record
| CREATOR | Central Intelligence Agency |
|---|---|
| YEAR | 1954 |
| COLLECTION | DECLASSIFIED |
| FORMAT | TXT |
| FILE SIZE | 1508 |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Internet Archive — CIA Reading Room mirror |
Source: https://archive.org/details/cia-readingroom-document-0000136246
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
CLASSImtD MESSAGE
ROUTING
. 1 4
sate: = 18 JUN 5k Peres | : 2 ia
7O 2: DIRECTOR
atin
FROM: iN . eo es
ee fleece Lb ten arti HELLU
action: WH (PBS) (123) 1996
ogee es SPs
mwro : «BH {h), OCH (5), U/OCH (6), CO/P (L) {7}, SAfec/oci (8)
LINC 4006 (iN 19536) 17262 18 JUN 54. OPERATIONAL IMMEDIATE
PRECEDENCE
TO: OPIM SGUAT INFO: OPIM DIR CITE: SLINC
RYSAT PBSUCCESS
RE: A. GUAT 88h CIN 41906), B. GUAT B85 (IN 19447),
Co GUAT 886 (IN 1916), D. GUAT B87 (IN 19556)
4. REF Az REQUEST STRICT COMPLIANCE LiNC 383 (IN 17975).
LINC WILL COORDINATE ALL OPS SETWEEN YOUR STATION AND SALAL. THERE
CAN GNLY BE ONE COMMANDER THEREFORE AVOID COMMITMENTS ARMS ANC AiR
SUPPORT UNTIL CONF 1 FRED.
2, REF 8 AND C: LINC 3977 (EN 19238) WAS AN ORDER STATED iHPERA
TIVELY. YGUR REPLIES DO NOT INCICATE COMPLIANCE THEREWITH. THIS MSG
INTENDED AS SHOCK TREATAENT TO FORCE - ANDO ARMY TO TAKE ACTiC
WHICH WOULD PLACE THEM ON FRIENDLY StDE THERE BEING NO MIDDLE GROUND.
THES "ET GEORGE DO 17" SITUATION OBVIOUSLY TERMIN TES AT H HOUR.
PARR 6, REF C, NOT, APPRECIATED. a ae
3. REF C: leQuest: YOU RE FAD LINe 3858 a 17978) NOTING
PARA 2B ANG Co Sus iS, SUBORDINATE TO LINCOLN AND PRE-
SUMABLY SELL RESPOND TO LATTER S CaRECT ION 3 AS: ‘WELL AS GUAT STATION
THUS ENABLING OVERALL pinecr owe -aNe CONT ROE “OF Se ACCORD INGLY
YOU WILL MAKE KNOWN TO LER your neous REMENTS FoR SUPPORT” OF
AND LATTER HILL OIRECTISA TITERS” “END OF MESSAGE
iT aS one ;
ME AS COMMAND
_f
WAKE A COPY OF THIS MESSAGE = Copy No.