Cable from Lincoln Requesting Maximum Weather Forecasts

Central Intelligence Agency · 1954

Read Cable from Lincoln Requesting Maximum Weather Forecasts by Central Intelligence Agency (1954) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/cia-0000135986.txt.

Introduction

The CIA cable from 4 February 1954 deals with maximum weather forecasts, the basic planning data on which the air campaign would depend, in a file now declassified. The name Lincoln marks the forward station of PBSUCCESS, the CIA campaign that brought down President Arbenz in June 1954. A reader gets the unpolished version here, complete with code names, short titles, and gaps left by the censors.

Catalog record

CREATORCentral Intelligence Agency
YEAR1954
COLLECTIONDECLASSIFIED
FORMATTXT
FILE SIZE1395
VERSION1.0
LICENSEPublic Domain
RIGHTSPUBLIC DOMAIN
SOURCEInternet Archive — CIA Reading Room mirror

Source: https://archive.org/details/cia-readingroom-document-0000135986

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

_— GIA HISTORICAL REVIEW Pauw
ciassiziep messace RELEASE AS SANITIZED is

k MAR Sk

OFRECGTOR
LINCOLN
WH (1-2)

PRECEDENCE

TO: DIR GITEs SLINC ©
RYBAT PBSUGCESS : =

é

4. WEATHER: OPERATIONAL PLANNING NECESSITATES MAX IMUM
WEATHER FORECASTS TO ENSURE SUCCESS. ACTION PERIOD WELL FALL
WITHIN NORMAL RAINY SEASON. THEREFORE, IMPERATIVE AIR AND
GROUND OPERATIONS SE SCHEDULED FOR BREAKS AND FAVORABLE PERTODS-

2, URGE AMO PLAN SOONEST TO PROVIDE LINC ALL AVAILABLE
WEATHER FORECAST ‘DATA FOR THE MONTHS OF MAY ANG JUNE.

3. WEATHER VARSES CONS!DERABLY DURING ABOVE PERIOD WITHIN
THE TARGET AREA DEPENDING ON TERRAIN FEATURES, THUS VERY IM~
PORTANT TO ATTAIN LOCAL FORECASTS FOR ABOVE AS COMPLETE AS
POSSIBLE FOR EACH GF THE NINE TARGETS.

hh, FORECASTS To SNOLUDE ESTIMATES ON CEILINGS, ViSiBiLiTy.
SLOUD COVER, RAINFALL, MEAN TEMPERATURES ( DAY, NIGHT) HUMIDITY,
POSSIBLE GROUND FOGS, YIND StRECTION AND VELOCITY, AND THUNDER-
STORMS «

5. REQUEST PROCEDURES BE ESTABLISHED FOR THE PROCUREMENT

AND TRANSMITTAL OF THE FOREGOING {INFO WITH THE MENT MUM POSSIBLE

oo ————
:
1 a =
3 £ Sate © ae
YAIR IGE L DSO IE OE |

A COPY OF THIS MESSAGE Cosy Ko. /

:
i
{
i
Coe.

iT 1S FORBIDDEN TO MAK

v1

I, MAR Sky
LING 866 (IN 23982)
PAGE o2=

TIME LAG, PREPARING FOR LATER STAGE DEVELOPMENTS WHEREIN
SUGH INFO MUST BE FORWARDED BY PRIORITY GABLE.
END OF MESSAGE

pet Ps
8 E _CoRE -

~~

Read the complete text