Data Center Spatio-Temporal Load Flexibility in Security-Constrained Unit Commitment for Enhanced Grid Efficiency and Reliability
Haoxiang Wan, Xingpeng Li · 2026
Read Data Center Spatio-Temporal Load Flexibility in Security-Constrained Unit Commitment for Enhanced Grid Efficiency and Reliability by Haoxiang Wan, Xingpeng Li (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2605-18517.txt.
Introduction
Haoxiang Wan and Xingpeng Li propose, in a 2026 paper, a modular security-constrained unit commitment plan coordinating flexible data center workloads with system scheduling. Three models cover spatial shifting across sites, temporal shifting at each site, and joint spatio-temporal flexibility. On a modified IEEE 24-bus test system, the joint model wipes out all base-case and post-contingency violations at 40 percent flexibility. It also cuts renewable curtailment by up to 84.4 percent at 30 percent flexibility.
Catalog record
| CREATOR | Haoxiang Wan, Xingpeng Li |
|---|---|
| YEAR | 2026 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 25991 |
| LICENSE | http://creativecommons.org/licenses/by/4.0/ |
| RIGHTS | CC BY |
| SOURCE | arXiv |
Source: https://arxiv.org/abs/2605.18517
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Data Center Spatio-Temporal Load Flexibility in Security-Constrained Unit Commitment for Enhanced Grid Efficiency and Reliability Haoxiang Wan, Xingpeng Li Abstract Data center electricity consumption reached 4.4% of U.S. total in 2023 and is projected to grow to 6.7–12% by 2028, imposing increasing stress on transmission networks while representing a largely untapped source of controllable demand-side flexibility. This paper proposes a modular security-constrained unit commitment (SCUC) framework that coordinates flexible data center workloads with system-level scheduling to reduce renewable curtailment, alleviate congestion, and lower operating costs. Three mixed-integer linear programming (MILP) models are formulated: the Data Center Spatial model (DC-S), enabling instantaneous workload redistribution across geographically distributed sites; the Data Center Temporal model (DC-T), permitting each site to shift its deferrable load across time while preserving the daily energy balance; and the Data Center Spatio-Temporal model (DC-ST), jointly activating both mechanisms and spanning the largest feasible operating region. Case studies on a modified IEEE 24-bus reliability test system show that DC-ST eliminates all base-case and post-contingency transmission violations at a flexibility ratio of 40%, and reduces renewable curtailment by up to 84.4% at 30% relative to the inflexible baseline. Sensitivity analysis further reveals that moderate flexibility levels of 20%–30% already capture most of the achievable benefits, supporting practical deployment with limited operational burden on data center operators. Nomenclature Sets and Indices: \mathcal{N} Set of all buses. \mathcal{G} Set of all generators. \mathcal{G}_{n} Set of generators at bus n . \mathcal{L} Set of all branches. \mathcal{T} Set of all time periods, \{1,\ldots,24\} . \mathcal{K} Set of N -1 contingency scenarios. \mathcal{D} Set of data center buses. \mathcal{S} Set of renewable generation buses. \delta^{+}(n) / \delta^{-}(n) Receiving-/sending-end branch sets at bus n . g Generator index. n Bus index. l Branch index. t Time period index. c Contingency scenario index. f_{l} / t_{l} Sending-/receiving-end bus of branch l . Generator Parameters: C^{\mathrm{E}}_{g} Linear variable energy cost ($/MWh). C^{\mathrm{NL}}_{g} No-load cost ($). C^{\mathrm{SU}}_{g} Start-up cost ($). P^{\min}_{g} / P^{\max}_{g} Minimum/maximum output limits (p.u.). R^{\mathrm{SP}}_{g} Min spinning reserve ramp rate (p.u.). R^{\mathrm{H}}_{g} Hourly ramp rate (p.u./h). R^{\mathrm{SR}}_{g} Start-up ramp capability (p.u.). R^{\mathrm{SD}}_{g} Shut-down ramping limit of generator g . T^{\mathrm{up}}_{g} / T^{\mathrm{dn}}_{g} Minimum up/down times (h). Data Center Parameters: D^{\mathrm{orig}}_{t} Pre-optimization data center load profile (p.u.). \overline{D}_{n} Physical capacity of site n (p.u.). \beta Flexibility ratio, \beta\in[0,1] . D^{\mathrm{fix}}_{n,t} Non-deferrable load component (p.u.) \hat{D}^{\mathrm{flex}}_{n,t} Nominal flexible quota (p.u.). Decision Variables: P_{g,t} Generator output (p.u.). u_{g,t} Commitment status (binary). v_{g,t} Start-up indicator (binary). R^{v}_{g,t} Spinning reserve (p.u.). \theta_{n,t} Voltage angle at bus n (rad). P^{f}_{l,t} Branch flow on line l (p.u.). D_{n,t} Total data center (DC) load at site n , co-optimized with unit commitment (p.u.). D^{\mathrm{flex}}_{n,t} Optimized flexible load component, distinct from nominal quota \hat{D}^{\mathrm{flex}}_{n,t} (p.u.). R^{\mathrm{use}}_{n,t} Utilized renewable output (p.u.). R^{\mathrm{curt}}_{n,t} Curtailed renewable output (p.u.). \alpha_{l,t} Base-case thermal violation slack (p.u.). \sigma_{n,t} Base-case load shedding (p.u.). P^{c}_{g,t} Post-contingency generator output (p.u.). \theta^{c}_{n,t} Post-contingency voltage angle (rad). P^{f,c}_{l,t} Post-contingency branch flow (p.u.). \alpha^{c}_{l,t} Post-contingency thermal violation slack (p.u.). \sigma^{c}_{n,t} Post-contingency load shedding (p.u.). I Introduction The rapid expansion of cloud computing, artificial intelligence, and digital services has driven sustained growth in large-scale data center (DC) electricity demand [ 4 , 1 ] . According to the 2024 U.S. Department of Energy report, U.S. DC electricity consumption reached 4.4% of the national total in 2023 and is projected to grow to 6.7–12% by 2028 [ 12 ] , reshaping regional load profiles and introducing new operational challenges for power system operators, including heightened transmission congestion, increased reliance on high-cost peaking resources, and reduced scheduling flexibility [ 9 , 3 , 13 ] . Concurrently, the large-scale integration of renewable energy like solar photovoltaic (PV) generation has amplified system uncertainty; its location-dependent, time-concentrated output can exacerbate network congestion and, when delivery to load centers is constrained, induce renewable curtailment [ 2 , 3 , 13 ] . Unlike conventional industrial loads, DCs serve a heterogeneous mix of latency-critical and delay-tolerant workloads [ 14 , 16 , 5 ] . Computationally intensive but scheduling-flexible tasks—batch processing, model training, large-scale analytics—can be deferred in time or, for operators with geographically distributed facilities, migrated across sites. This characteristic positions DCs as a structurally unique demand-side resource: one that can be coordinated to absorb renewable generation during high-output intervals, relieve transmission bottlenecks, and reduce reliance on costly corrective actions [ 14 , 18 , 16 ] . Prior work on DC-based demand response and workload management has focused predominantly on the operator’s perspective, targeting electricity cost minimization, carbon-aware scheduling, and geographic load balancing [ 17 , 7 , 6 ] . While these studies establish the technical feasibility and economic incentives for flexible computing, the integration of DC flexibility into power system scheduling—particularly within security-constrained operational frameworks subject to unit commitment logic and N -1 contingency requirements—remains comparatively underexplored. Furthermore, the spatial and temporal dimensions of DC flexibility are typically studied in isolation, obscuring their complementary operational roles and precluding a direct quantification of the marginal value of each dimension. Motivated by these gaps, this paper develops a security-constrained unit commitment (SCUC) framework that co-optimizes generator scheduling with flexible DC demand as a system-level resource, extending prior SCUC formulations focused on computational acceleration, corrective redispatch, and conventional demand response [ 11 , 10 , 15 ] . Workload flexibility is captured through modular constraints representing (i) spatial workload redistribution across DC sites, (ii) temporal load shifting at the same site, and (iii) their joint activation, each maintaining rigorous energy accounting and full compatibility with power flow and N -1 contingency modeling. The contributions of this work are as follows: • A unified, modular mixed-integer linear programming (MILP) formulation that embeds three DC flexibility models (spatial, temporal, and joint spatio-temporal) within a single SCUC structure, enabling apples-to-apples comparison under identical generator, network, and N -1 security constraints. • The marginal value of spatial and temporal flexibility is separately quantified within a security-constrained scheduling framework, showing that temporal flexibility dominates cost reduction while spatial flexibility better absorbs renewable curtailment, and that joint coordination captures synergistic benefits beyond either dimension alone. • A sensitivity analysis on the flexibility ratio \beta identifies a diminishing-returns regime that yields a practical guideline: moderate flexibility ( \beta\!=\!0.20 to 0.30 ) captures most of the achievable grid relief. II System Model and Methodology The proposed framework extends a standard SCUC formulation [ 11 , 10 ] to incorporate flexible DC loads as controllable demand-side resources. The enhanced model co-optimizes generator commitment and dispatch, DC load allocation, and renewable generation utilization, subject to network flow, N -1 contingency security, and DC energy conservation constraints. The objective function is linear in all decision variables and is given by: \displaystyle\min\; \displaystyle\sum_{g,t}\Bigl(C^{\mathrm{E}}_{g}P_{g,t}+C^{\mathrm{NL}}_{g}u_{g,t}+C^{\mathrm{SU}}_{g}v_{g,t}\Bigr) \displaystyle+M\!\left(\sum_{l,t}\alpha_{l,t}+\sum_{l,c,t}\alpha^{c}_{l,t}+\sum_{n,t}\sigma_{n,t}+\sum_{n,c,t}\sigma^{c}_{n,t}\right) (1) where C_{g}^{\rm E} is a constant linear energy cost coefficient. The first line minimizes total generation cost, while the second penalizes thermal violations and load shedding in both base-case and post-contingency states via a uniform large penalty M . Generator dispatch and reserve [ 11 , 10 ] : \displaystyle P_{g}^{\min}u_{g,t} \displaystyle\leq P_{g,t}\leq P_{g}^{\max}u_{g,t}-R_{g,t}^{v}, \displaystyle\forall g,t (2) \displaystyle R_{g,t}^{v} \displaystyle\leq R_{g}^{\mathrm{SP}}u_{g,t}, \displaystyle\forall g,t (3) \displaystyle\sum_{g}R_{g,t}^{v} \displaystyle\geq\max_{g\in\mathcal{G}}\{P_{g}^{\max}\}, \displaystyle\forall t (4) Constraint ( 2 ) bounds dispatch within committed capacity net of spinning reserve. Constraints ( 3 )–( 4 ) enforce