Scalable Production Scheduling: Linear Complexity via Unified Homogeneous Graphs

Jonathan Hoss, Moritz Link, Noah Klarmann · 2026

Read Scalable Production Scheduling: Linear Complexity via Unified Homogeneous Graphs by Jonathan Hoss, Moritz Link, Noah Klarmann (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2604-23841.txt.

Description

Hoss, Link, and Klarmann solve job-shop scheduling with a unified graph framework that projects distinct node roles into one shared space. This lets a standard homogeneous graph network capture resource contention at linear cost, fixing the quadratic bottleneck of earlier models. Tests show top performance with strong zero-shot transfer. The job-to-machine ratio drives success most, and training at the saturation point where jobs match machines yields scale-free strategies.

Catalog record

CREATORJonathan Hoss, Moritz Link, Noah Klarmann
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE40903
LICENSEhttp://creativecommons.org/licenses/by/4.0/
RIGHTSCC BY
SOURCEarXiv

Source: https://arxiv.org/abs/2604.23841

Browse the full library · About the Tower of Babel