Security-Constrained Substation Reconfiguration Considering Busbar and Coupler Contingencies

Ali Rajaei, and Jochen L. Cremer · 2026

Read Security-Constrained Substation Reconfiguration Considering Busbar and Coupler Contingencies by Ali Rajaei, and Jochen L. Cremer (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2603-04203.txt.

Introduction

Rajaei and Cremer present secure substation redesign for busbar and coupler outages. This paper presents a mixed-integer linear plan for secure substation redesign, covering N-1 line, coupler, and busbar outages for secure substation topology. Earlier methods ignore substation topology safety, mainly for substations lacking busbar splitting, which can bring grave results. Linear AC power flow equations ensure power-flow accuracy.

Catalog record

CREATORAli Rajaei, and Jochen L. Cremer
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE61707
LICENSEhttp://creativecommons.org/licenses/by/4.0/
RIGHTSCC BY
SOURCEarXiv

Source: https://arxiv.org/abs/2603.04203

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Security-Constrained Substation Reconfiguration Considering Busbar and Coupler Contingencies Ali Rajaei, and Jochen L. Cremer Abstract Substation reconfiguration via busbar splitting can mitigate transmission grid congestion and reduce operational costs. However, existing approaches neglect the security of substation topology, particularly for substations without busbar splitting (i.e., closed couplers), which can lead to severe consequences. Additionally, the computational complexity of optimizing substation topology remains a challenge. This paper introduces a MILP formulation for security-constrained substation reconfiguration (SC-SR), considering N-1 line, coupler and busbar contingencies to ensure secure substation topology. To efficiently solve this problem, we propose a heuristic approach with multiple master problems (HMMP). A central master problem optimizes dispatch, while independent substation master problems determine individual substation topologies in parallel. Linear AC power flow equations ensure PF accuracy, while feasibility and optimality sub-problems evaluate contingency cases. The proposed HMMP significantly reduces computational complexity and enables scalability to large-scale power systems. Case studies on the IEEE 14-bus, 118-bus, and PEGASE 1354-bus system show the effectiveness of the approach in mitigating the impact of coupler and busbar tripping, balancing system security and cost, and computational efficiency. Nomenclature Indices and Sets i\in\mathcal{V} Index for substations (nodes). b\in\mathcal{B} Index for busbars \mathcal{B}=\{b1,b2\} . ij\in\mathcal{L} Index for transmission lines (from i to j ). g\in\mathcal{G} Index for generators. d\in\mathcal{D} Index for load demands. c\in\Omega^{*} Index for contingency states. \Omega^{l} : line contingencies, \Omega^{c} : coupler contingencies, \Omega^{b} : busbar contingencies. c=0 is normal state. c\in\Omega_{i} Index for contingencies of elements of substation i , including the coupler c_{i} and the busbars b1_{i},b2_{i} . \mathcal{L}_{i},\mathcal{G}_{i},\mathcal{D}_{i} Elements connected to substation i . \Omega^{cnd},\Omega^{split} Candidate and selected substations for splitting. Parameters \hat{P}_{d},\hat{Q}_{d} Active and reactive power demand. \underline{P}_{g},\overline{P}_{g} Minimum and maximum active power generation. \underline{Q}_{g},\overline{Q}_{g} Minimum and maximum reactive power generation. \overline{r}^{u}_{g},\overline{r}^{d}_{g} Maximum ramp-up and ramp-down. \underline{V}_{i},\overline{V}_{i} Minimum and maximum squared voltage magnitude. \overline{Z^{s}} Maximum number of busbar splitting. \hat{P}^{m}_{g} Active power generation cleared in the electricity market. b_{ij},g_{ij} Susceptance and conductance of line ij . \overline{S}_{ij} Maximum apparent power flow of line ij . \overline{S}_{i} Maximum apparent power flow of the coupler in substation i . \phi_{d} Tangent of the power factor angle of loads. \pi_{g},\pi^{u}_{g},\pi^{d}_{g},\pi_{d} Cost (€/MWh) of generation, ramp-up, ramp-down, and load shedding. M^{\theta},M^{v} Big-M parameters. \hat{x},\hat{z} Fixed dispatch and topology solution. \epsilon^{f},\epsilon^{o} Feasibility and optimality thresholds. p_{c} Probability of contingency c . \alpha Relative additional generation cost. Variables P_{g,b,c},Q_{g,b,c} Active and reactive power generation for contingency states. P^{0}_{g} Active power dispatch for normal state. r^{u}_{g},r^{d}_{g} Ramp-up and ramp-down spinning reserve. P_{d,b},Q_{d,b} Active and reactive load demand. P^{\prime}_{d,b,c},Q^{\prime}_{d,b,c} Active and reactive load shedding. P_{i,c},Q_{i,c} Active and reactive power flow through the coupler at substation i from busbar b1 to b2 . P_{ij,c},Q_{ij,c} Active and reactive power flow of line ij from i side. P_{ij,b,c},Q_{ij,b,c} Active and reactive power flow of line ij through busbar b at substation i . P^{L}_{ij,c},Q^{L}_{ij,c} Active and reactive power loss of line ij . \theta_{i,b,c},V_{i,b,c} Voltage angle and squared voltage magnitude of substation i busbar b . \theta_{ij,c},V_{ij,c} Voltage angle and squared voltage magnitude at the end of line ij on the side of i . z_{i} Connection status of coupler in substation i (0: open, 1: close). z_{g},z_{d} Connection status of generator and demand to busbars ( 0:b1,1:b2 ). z_{ij} Connection status of line ij to substation i busbars ( 0:b1,1:b2 ). \mu_{.,c},\lambda_{.,c} Dual variables of Benders constraints for sub-problem c . \mathcal{O}^{MP}_{0},\mathcal{O}^{MP}_{i} Objective of the master problem for dispatch and topology of substation i . \mathcal{O}^{FSP}_{c},\mathcal{O}^{OSP}_{c} Objective of the feasibility and optimality sub-problems. \psi_{c} Positive auxiliary variables for Benders cuts. UB,LB Upper bound and lower bound. I Introduction The increasing share of distributed energy resources and the rapid electrification of various sectors pose challenges for system operators in alleviating the increased congestion in the grid. Transmission network topology control, particularly substation reconfiguration via busbar splitting, is a promising solution to alleviate congestion and reduce operational costs, offering an alternative to costly redispatch measures [ 32 , 44 ] . However, the security of substation topology is often overlooked, especially when busbar splitting is not applied. System operators rely on experience or predefined manuals for substation topology, while outages of substation elements are neglected in the contingency list, which can lead to severe consequences. On January 8, 2021, the outage of a single highly loaded busbar coupler (or ‘coupler’) triggered cascading failures that ultimately split the European grid into two areas [ 36 ] . This happened because the substation topology was not adjusted after a transmission line was taken out of service, and the N-1 coupler outage was not considered in the contingency analysis, as Fig. 1 shows. To prevent such events, ENTSO-E recommends selecting substation topologies that minimize the flow through couplers and including all transmission elements, such as couplers, in the contingency list [ 36 ] . In this context, this paper proposes a computationally efficient and scalable approach to determine secure substation topologies considering busbars, couplers, and line contingencies, that can be integrated with current operational practices in large-scale grids, and probabilistic approaches or market applications to balance system security and operational cost. Optimal transmission line switching (OTS), first formulated by Fisher et al. [ 18 ] as a MILP, extends the DC optimal power flow (OPF) by adding binary variables for line switching to reduce costs. As the OTS problem [ 18 ] is NP-hard [ 28 ] , heuristic approaches, such as sensitivity analysis [ 19 , 41 ] and constraint identification [ 15 ] are proposed. To address N-1 line contingencies, [ 26 ] uses Benders decomposition (BD) to handle violations, while [ 42 ] uses sensitivity factors to formulate a security-constrained (SC) OTS. Moreover, corrective line switching actions are explored in [ 29 , 30 ] . However, these works do not consider substation reconfiguration actions. Optimal substation reconfiguration (OSR) involves adjusting substation topology, including busbar splitting and the reconfiguration of transmission feeders to the busbars (referred to as substation configuration) [ 32 , 44 ] . Several works, such as [ 44 , 49 , 3 , 5 , 47 , 46 , 9 ] use sensitivity analysis as a heuristic approach to identify candidate busbar splitting actions. These heuristic approaches assume a fixed generation dispatch and substation configuration, focusing solely on identifying busbar splitting actions to marginally improve their objective, but they do not provide an optimal substation configuration. [ 24 ] proposes a MILP formulation of OSR based on node-breaker modeling and DC OPF. Alternatively, [ 21 ] uses shift factors to develop a MILP that incorporates substation reconfiguration in the SC-OPF problem. [ 35 ] develops a heuristic search approach based on the locality effects of switching actions to solve the MIP. [ 17 ] proposes an iterative approach that decouples topology and redispatch optimization. [ 23 ] extends the work in [ 24 ] by incorporating N-1 line contingencies using BD. [ 34 ] advances these works by developing an SC-OPF with corrective busbar splitting actions using the column-and-constraint generation technique. [ 10 , 8 , 33 ] focus on hybrid AC/DC grids. In particular, [ 33 ] extends [ 34 ] by introducing soft busbar splitting in converter substations, while [ 8 ] extends [ 10

Read the complete text