KEK Accelerator Test Facility Low-Level RF and Timing Systems

\firstname Konstantin \lastname Popov \fnsep, \firstname Alexander \lastname Aryshev, \firstname Hiroshi \lastname Kaji, \firstname Toshiyuki \lastname Okugi · 2026

Read KEK Accelerator Test Facility Low-Level RF and Timing Systems by \firstname Konstantin \lastname Popov \fnsep, \firstname Alexander \lastname Aryshev, \firstname Hiroshi \lastname Kaji, \firstname Toshiyuki \lastname Okugi (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2602-00501.txt.

Description

Konstantin Popov and colleagues describe the low-level RF and timing systems of the KEK Accelerator Test Facility. Stable operation needs the timing and low-level RF systems in sync, distributing triggers and gates to klystrons, lasers, kicker magnets, and interlocks. It supplies phase-coherent references and clocks. Reaching about 100 femtosecond-level sync depends on the phase-noise density of the clocks and on preserving it in distribution. The paper reports clock phase-noise measurements and discusses the sync floor set by the linac and damping ring generators.

Catalog record

CREATOR\firstname Konstantin \lastname Popov \fnsep, \firstname Alexander \lastname Aryshev, \firstname Hiroshi \lastname Kaji, \firstname Toshiyuki \lastname Okugi
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE13191
LICENSEhttp://creativecommons.org/licenses/by/4.0/
RIGHTSCC BY
SOURCEarXiv

Source: https://arxiv.org/abs/2602.00501

Browse the full library · About the Tower of Babel