Statistical process control via p p -values

Hien Duy Nguyen, Dan Wang · 2026

Read Statistical process control via p p -values by Hien Duy Nguyen, Dan Wang (2026) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2601-17319.txt.

Introduction

Hien Duy Nguyen and Dan Wang study process control through p-values. Factories and labs chart key values to catch drift early. The authors chart p-values instead of raw measures. When a process is in control, a valid p-value stream is super-uniform. That trait holds with no model of the process itself. It works in nonparametric and two-phase designs.

A chart with no model demand is a strong draw. Teams can watch complex processes they cannot fully describe. False alarms stay in check if the p-values are valid. The work gives quality teams a flexible watch tool. It shifts focus from the measure to the proof of change.

Catalog record

CREATORHien Duy Nguyen, Dan Wang
YEAR2026
COLLECTIONPAPERS
FORMATTXT
FILE SIZE123 KB
VERSION1.0
LICENSEhttp://creativecommons.org/licenses/by/4.0/
RIGHTSCC BY
SOURCEarXiv

Source: https://arxiv.org/abs/2601-17319

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Statistical process control via p p -values Hien Duy Nguyen, Dan Wang Abstract We study statistical process control (SPC) through charting of p p -values. When in control (IC), any valid sequence ( P t ) t (P_{t})_{t} is super-uniform, a requirement that can hold in nonparametric and two-phase designs without parametric modelling of the monitored process. Within this framework, we analyse the Shewhart rule that signals when P t ≤ α P_{t}\leq\alpha . Under super-uniformity alone, and with no assumptions on temporal dependence, we derive universal IC lower bounds for the average run length (ARL) and for the expected time to the k k th false alarm ( k k -ARL). When conditional super-uniformity holds, these bounds sharpen to the familiar α − 1 \alpha^{-1} and k ​ α − 1 k\alpha^{-1} rates, giving simple, distribution-free calibration for p p -value charts. Beyond thresholding, we use merging functions for dependent p p -values to build EWMA-like schemes that output, at each time t t , a valid p p -value for the hypothesis that the process has remained IC up to t t , enabling smoothing without ad hoc control limits. We also study uniform EWMA processes, giving explicit distribution formulas and left-tail guarantees. Finally, we propose a modular approach to directional and coordinate localisation in multivariate SPC via closed testing, controlling the family-wise error rate at the time of alarm. Numerical examples illustrate the utility and variety of our approach. 1 Institute of Mathematics for Industry, Kyushu University, Japan. 2 School of Computing, Engineering, and Mathematical Sciences, La Trobe University, Australia. 3 Department of Statistics, School of Mathematics, Northwest University, Xi’an, China Keywords: statistical process control; p -values; exponentially weighted moving average; average run length; directional localisation 1 Introduction Statistical process control (SPC) comprises an important class of methods for monitoring the behaviour of manufacturing, engineering, and other production processes. Since their introduction by Shewhart, 1931 , the SPC literature has grown significantly, with works such as Zwetsloot & Woodall, 2021 , Waqas et al., 2024 , Ahmed et al., 2025 , and Tsung et al., 2025 providing good recent references on the current state of the art. Good introductions to the SPC literature appear in the texts of Xie et al., 2002 , Qiu, 2013 , and Chakraborti & Graham, 2019 . Typically, when conducting SPC, one seeks to monitor a process whose in-control state can be characterised as generating data from a null distribution, defined by a null hypothesis \mathrm{H}_{0} . One then wishes to detect whether the process becomes out-of-control (OOC), characterised as a deviation away from \mathrm{H}_{0} . In the discrete-time setting, at time point t\in\mathbb{N} , the analyst assesses deviation from the in-control (IC) state by sampling n_{t}\in\mathbb{N} observations from the data-generating process (DGP) and computing a test statistic Z_{t} whose distributional characteristics are known under \mathrm{H}_{0} . The analyst then monitors the sequence of test statistics \left(Z_{t}\right)_{t} and raises an alarm whenever the test of \mathrm{H}_{0} using Z_{t} is rejected at some specified level \alpha>0 . This choice controls the instantaneous false-alarm rate (FAR) of the monitoring process and the IC average run length, typically via a control limit for Z_{t} that can be characterised as a hypothesis-testing critical value depending on \alpha . This is the essence of the general scheme introduced by Shewhart, 1931 . A more sophisticated analyst can further employ time-point averaging methods, such as the cumulative sum (CUSUM) and exponentially weighted moving average (EWMA) charts introduced by Page, 1954 and Roberts, 1959 , respectively. The null distributions of these chart statistics can be obtained in specific parametric situations, such as under assumptions of normality (see, e.g., Roberts, 1959 , Lucas & Saccucci, 1990 , Lowry et al., 1992 , Lu & Reynolds, 1999 , Yeh et al., 2003 , and Knoth, 2005 ), but can be difficult to deduce in general. For any hypothesis \mathrm{H}_{0} , one can typically construct a sequence of p -values \left(P_{t}\right)_{t} , based on samples of sizes \left(n_{t}\right)_{t} , which can be used as test statistics for \mathrm{H}_{0} in place of \left(Z_{t}\right)_{t} . Here, we define the p -value as a random variable P taking values in the unit interval such that, under the null \mathrm{H}_{0} , the probability that P\leq\alpha is less than or equal to \alpha for each \alpha>0 , following the general definition of Lehmann & Romano, 2022 . The use of p -values in SPC has been explored in the works of Grigg & Spiegelhalter, 2008 , who derive and make use of the steady-state distribution of CUSUM statistics to compute p -values for monitoring; Grigg et al., 2009 and Li & Tsung, 2009 , who consider the use of p -values and false discovery rate control to simultaneously monitor multiple processes; and Li et al., 2013 , who suggest the charting of p -values as a unified framework for conducting SPC, particularly in the presence of variable sampling intervals (VSI) and variable sample sizes (VSS) in each time period. In this work, we continue to develop the use of the p -value as a charting tool for SPC. In particular, we demonstrate that p -values are applicable in both one- and two-phase monitoring programmes and, like Li et al., 2013 , we discuss how p -values are applicable in VSI and VSS settings. Without any assumption on stochastic dependence within the sequence \left(P_{t}\right)_{t} , we prove that the p -value chart that raises an alarm if P_{t}\leq\alpha has an average run length (ARL) that is always bounded below by \left(1+\alpha^{-1}\right)/2 , and under a conditional super-uniformity assumption, we prove that this can be improved to the typical \alpha^{-1} bound of parametric methods. To extend these observations, motivated by the notion of k -FWER (generalised family-wise error rate; the case k=1 corresponds to the usual family-wise error rate (FWER); Lehmann & Romano, 2005 ), we also study the k -ARL, defined as the average time until first observing k false alarms under the null hypothesis, which generalises the usual ARL (corresponding to the k=1 case). Without dependence assumptions, we prove that k -ARL is bounded below by \left(1+k\alpha^{-1}\right)/2 , which again improves to k\alpha^{-1} under conditional super-uniformity assumptions. These k -ARL bounds allow the p -value charts to be correctly calibrated for all DGPs where \mathrm{H}_{0} holds and mitigate against the time-consuming task of simulation-based ARL calibration, which only holds under the specific DGP assumptions that underlie the simulation study. Further to these results, we demonstrate that, like well-behaved test statistics, one can construct EWMA-like schemes \left(Q_{t}\right)_{t} based on a p -value sequence \left(P_{t}\right)_{t} , such that each Q_{t} is a p -value for the hypothesis that \mathrm{H}_{0} is true for all time points up to time t , against the complementary hypothesis. We demonstrate that this is possible using recent results for combining p -values ( Vovk & Wang, 2020 ; Vovk et al., 2022 ) . Thus, given any sequence of test statistics \left(Z_{t}\right)_{t} whose null distributions admit p -values, one can always generate EWMA-like schemes for SPC. We further consider and follow on from the work on EWMA charts based on uniform test-statistic constructions of Yeh et al., 2003 and obtain novel results regarding the

Read the complete text