EPC Framework for BESS Projects
Zeenat Hameed, Chresten Træholt · 2025
Read EPC Framework for BESS Projects by Zeenat Hameed, Chresten Træholt (2025) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2506-13281.txt.
Introduction
Zeenat Hameed and Chresten Træholt wrote this paper in 2025. It sets out a five-step EPC plan for battery storage projects. Such projects use one contract for design, buying, and building. Batteries help grids with frequency control, peak shaving, and black start. The steps run from a first check of feasibility, through permits, buying, and building, to final start-up. The plan balances rules, technical detail, and speed. A Danish test project, the BOSS project on Bornholm, serves as the case study.
Catalog record
| CREATOR | Zeenat Hameed, Chresten Træholt |
|---|---|
| YEAR | 2025 |
| COLLECTION | PAPERS |
| FORMAT | TXT |
| FILE SIZE | 19 KB |
| VERSION | 1.0 |
| LICENSE | http://creativecommons.org/licenses/by/4.0/ |
| RIGHTS | CC BY |
| SOURCE | arXiv |
Source: https://arxiv.org/abs/2506-13281
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
EPC Framework for BESS Projects Zeenat Hameed, Chresten Træholt Abstract Battery Energy Storage Systems (BESS) are critical for modern power networks, supporting grid services such as frequency regulation, peak shaving, and black‐start. Delivering a BESS under an Engineering, Procurement, and Construction (EPC) model requires a concise methodology that balances regulatory compliance, technical details, and schedule efficiency. This paper presents a streamlined, five‐step EPC framework covering feasibility assessment, permitting, procurement, construction, and commissioning. A Danish demonstration (the BOSS project on Bornholm) serves as a case study. I Introduction Battery Energy Storage Systems (BESS) play a pivotal role in balancing variable renewable generation, providing ancillary services such as frequency containment reserve (FCR) and automated frequency restoration (aFRR), and offering energy arbitrage opportunities. However to provide these services, BESS must integrate with transmission or distribution networks, adhere to stringent safety and fire codes, and demonstrate performance through factory acceptance tests (FAT), site acceptance tests (SAT), and prequalification tests. Current academic and industry studies often focus on optimization algorithms, control strategies, and simulation models for BESS operation. While such work is invaluable, it does not address the real‐world challenges of project execution. BESS projects remain relatively new and complex to deploy; to scale up the number of installations, practitioners need clear processes and procedures. Typically, this implementation knowledge remains with a small number of specialized engineers and project managers. Moreover, BESS projects differ from large‐scale conventional generators and other infrastructure projects because they can be delivered by smaller commercial entities, cooperatives, or independent developers, in contrast to traditional coal‐fired or large gas‐fired plants, which require extensive corporate resources. However, detailed understanding of what it takes to run a BESS project—including timelines, complexities, necessary steps, budgets, and stakeholder roles—remains ambiguous for many, even within the energy domain. While simulation studies and control algorithms are critical components, they must be viewed as part of the larger project lifecycle rather than isolated topics. To address these gaps, this paper focuses specifically on the Engineering, Procurement, and Construction (EPC) process for BESS projects, highlighting each phase and critical tasks. Using Denmark as a case study, we detail the step‐by‐step EPC process and present a 1 MW/1 MWh BESS project in Bornholm as an illustrative example of how this methodology applies in practice. The paper is structured as follows: Section I provides the Introduction; Section II presents an overview of the EPC process for BESS projects; Section III applies this EPC process to the 1 MW/1 MWh BESS project in Bornholm. Section IV ends with conclusions. II BESS-EPC Process Overview An EPC (Engineering, Procurement, and Construction) process defines the end‑to‑end sequence of activities required to deliver a BESS project from initial concept through ready‑for‑operation. It is important because it structures workflows, assigns responsibilities, and ensures that technical, commercial, and regulatory requirements are met on time and within budget. Without a clear EPC framework, projects risk delays, cost overruns, and misalignment among stakeholders. In this paper, the EPC process encompasses five key steps: 1. Feasibility Assessment 2. Permitting 3. Procurement 4. Construction 5. Commissioning II-A Feasibility Assessment Feasibility studies are the foundation of any EPC project. They evaluate whether a BESS project would be a viable business venture in the specified geography. Key activities include: • Business Case Evaluation : Estimate capital expenditures (CAPEX), operational expenditures (OPEX), revenue streams, and return‑on‑investment (ROI). Financial models consider local market prices, incentives, and grid tariffs. • Site Selection : Screen candidate sites based on proximity to electrical infrastructure, available land, zoning, environmental constraints, and land ownership. • Preliminary Design : Develop high‑level Single‑Line Diagrams (SLDs) showing Point of Connection (PoC) at the appropriate voltage level • High‑Level Cost Estimate : Incorporate DSO / TSO‑provided grid reinforcement costs (e.g.cable upgrades, transformer replacements) and a civil works budget. Deliver a site selection report recommending the optimal location based on technical, financial, and schedule criteria. II-B Permitting and Regulatory Approvals Permitting ensures legal authorization to proceed with construction and operation. Key steps include: • Grid Connection Permits : Submit a Request for Connection (RFC) to the local DSO or TSO, depending on voltage level.The DSO/TSO issues a binding connection offer detailing maximum power injection/withdrawal, reinforcement obligations, connection fees, and a timeline. • Power‑Quality Checks : Finalize harmonic and flicker analysis using actual feeder impedances. If THD exceed thresholds, specify mitigation measures (tuned passive filters, active filters, or ramp‑rate limits). • Building Permit : Provide site layout plans (container placement, transformer pad, fencing, access roads), elevation drawings (container height, transformer height), structural slab calculations, stormwater management, and noise assessment. • Fire Safety Permit : Prepare fire‑safety documentation , fire suppression design, smoke/heat detection, fire‑load calculations, smoke extraction, and emergency response plan. • Land and Easement Documentation : Provide title deed or lease agreement. II-C Procurement and Supplier Management Once permits are secured, procurement begins: • RFQ Preparation : Develop a request for quotation (RfQ) outlining technical specifications, commercial terms, liquidated damages, and warranty requirements. • Supplier Prequalification : Score vendors on technical compliance, commercial competitiveness, delivery timeline, warranty/service , and local support, and financial stability . • Supply Chain Management : Track lead times for batteries, inverters, transformers, switchgear, and auxiliary equipment. Coordinate factory acceptance test (FAT) schedules at vendor facilities. Address any non‑conformances before shipment. • Logistics and Customs : For imported equipment, handle customs clearance, and transport to port. Plan for special permits (e.g., overweight/oversize loads for transformers, crane capacities). II-D Construction and Installation Construction brings the engineered design to life: • Site Mobilization : Establish site office, security fencing, portable facilities, and temporary lighting. • Civil Works : Excavate cable trenches. Implement erosion control. • Electrical Installation : Place transformers on epoxy‑coated bunds. Install MV switchgear. Place BESS containers on antivibration pads • Communications Infrastructure : Install ethernet connection and develop communication set-up II-E Testing, Commissioning, and Handover Commissioning validates system performance and readiness: • Site Acceptance Test (SAT) : Post‑installation, test protection relays. Validate inverter synchronization. Measure THD and flicker under steady power and full discharge conditions. Conduct full charge/discharge cycle to calculate round‑trip efficiency. Execute frequency support test. Test communications failover. Verify SCADA integration. • Prequalification : Submit prequalificationn test results to the TSO for ancillary services. • Market Integration : Coordinate with a Balance Responsible Party (BRP) for trading access. Configure telemetry and control setpoints III BESS-EPC framwwork implementation - A Danish Case-Study The Bornholm Smartgrid Secured (BOSS) project is used as a case-study in this paper. BOSS was a collaborative demonstration led by the Technical University of Denmark (DTU) that focused on the installation and operation of a 1 MW/1 MWh grid‐connected BESS on the Danish island of Bornholm. III-A Phase 1: Feasibility Assessment A detailed feasibility assessment was conducted to establish the business case, shortlist potential installation sites, and develop a connection schematic for the 1MW/1MWh BESS on Bornholm (DK2). Key sub‐steps are described below. III-A 1 Business Case Evaluation A revenue model was developed to quantify the expected annual operating income of a 1MW/1MWh BESS in the DK2 bidding zone. Figure 1 shows the breakdown of operating results from primary grid services—FCR-N, FCR-D up/down, FFR—as well as export revenues and net import/energy costs, for the period 2020–2023. These results illustrate that, under the multi-market strategy, annual net revenues