Coaching station for FIT on-call shifters

Krystian Rosłon for the ALICE collaboration · 2025

Read Coaching station for FIT on-call shifters by Krystian Rosłon for the ALICE collaboration (2025) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2503-14196.txt.

Introduction

A great ring's parts are too dear and too rare to train hands on, so its crews learn by rare drills and hope. Krystian Roslon builds a school rig for one such part in a 2025 note: the fast trip switch of the ALICE ring. The rig lets call hands run the part's own calls in a safe twin.

The rig cuts the school span hard and lifts the trainee's trust in their own moves. Roslon, the sole author, hopes the build is a frame for other parts of the great ring, and for all great rigs whose true parts can not be spared for school.

Catalog record

CREATORKrystian Rosłon for the ALICE collaboration
YEAR2025
COLLECTIONPAPERS
FORMATTXT
FILE SIZE13 KB
VERSION1.0
LICENSEhttp://creativecommons.org/licenses/by/4.0/
RIGHTSCC BY
SOURCEarXiv

Source: https://arxiv.org/abs/2503-14196

Browse the full library · About the Tower of Babel

Full text

The opening of the work, from the library's hosted text:

Coaching station for FIT on-call shifters Krystian Rosłon for the ALICE collaboration Abstract We present an efficient and cost-effective way to train operators of complex systems with limited accessibility, such as sub-detectors of big experiments at CERN Large Hadron Collider (LHC). Our coaching station was developed to train on-call shifters for the ALICE Fast Interaction Trigger (FIT). This coaching station significantly reduces the training period and enhances the trainee’s confidence in their actions. We hope this work will inspire the construction of comparable training systems for other sub-detectors. Keywords: ALICE; FIT; Training station; SCADA; on-call. 1 Motivation Big experiments result from decades of work by thousands of scientists, engineers, technicians and students. The challenges encountered and the solutions implemented are mainly specific to these projects and, therefore, require dedicated hands-on training to gain operational proficiency. Data taking during LHC operation occurs on a 24/7 schedule. Thus, there is very little time for such training. We designed and built a coaching station to train experts and prepare a sufficient pool of well-trained on-call shifters for the ALICE-FIT detectors. The station uses all the critical components of the actual system, including a PhotoMultiplier Tube (PMT), low and high-voltage power supply, Laser System, Front-End Electronics (FEE), First Level Processor (FLP), and the Local Trigger Unit (LTU). While our coaching station was developed exclusively for FIT, it could be modified to benefit other ALICE subsystems. 1.1 ALICE Fast Interaction Trigger A Large Ion Collider Experiment (ALICE) [ 1 ] is one of the four major CERN Large Hadron Collider experiments. ALICE studies the properties of quark-gluon plasma (QGP), a state of matter where quarks and gluons are deconfined. The ALICE physics program includes proton, lead, and oxygen collisions. ALICE can track and identify particles down to low transverse momenta, allowing detailed studies of the essential properties of the QGP. FIT [ 2 ] detector has been added to the ALICE setup during the Long Shutdown 2 (2019 – 2022) and will operate throughout Run 3 (2022 – 2026) and 4 (2030 – 2033). FIT is the first detector turned on, and the last turned off, during data-taking. It provides online luminosity, precise collision time, initial vertex position, fast triggers, forward multiplicity, event plane and centrality. Since FIT is essential to the operation of ALICE, it must be constantly monitored and promptly fixed/corrected in case of emerging issues. That responsibility is with the ALICE Run Coordination (RC) schematically depicted in Fig. 1 . In case of problems, the Shift Leader contacts relevant on-call experts. Since data-taking covers most of the year with 24/7 operations, we need a sufficiently large pool of well-trained FIT experts to meet that challenge. Figure 1: ALICE Run Coordination structure [ 3 ] . All used abbreviations are listed at the end of this document. 2 Development of the FIT Training Station Training new people to operate and maintain FIT requires hands-on work experience with all the critical components of the detector and its control. Therefore, such practice must be scheduled outside the data-taking periods. However, these beam-off periods are infrequent and often brief due to the LHC’s tightly coordinated operating schedule [ 4 ] . The only exception is the Year End Technical Stop (YETS). Since YETS overlaps with the Christmas Holidays and the annual CERN closure it is unsuitable for training. These were the main reasons to develop a setup that can be used anytime throughout the year. Figure 2 illustrates the transition from the operational FIT detector to the lab-based training station. This simplification retained FIT’s essential components while providing a robust, scalable environment to train new on-call experts during the ALICE data-taking periods. Figure 2: Left: Detector read-out and interfaces of the O2 system with the trigger, detector electronics and DCS. Right: Schema of the FIT laboratory setup. 2.1 Hardware The hardware configuration of the FIT Training Station replicates the core architecture of the FIT detector as implemented in the ALICE experiment at CERN. At the system’s core is the PMT, a highly sensitive device that converts light signals into electrical signals for further processing. The PMT is powered by a CAEN High Voltage (HV) Crate, providing precise and stable voltage needed for signal amplification. The PMT is housed in a custom-designed, light-tight box connected to a laser system. The laser system is integrated with the FIT Front-End Electronics. FEE includes one Trigger and Clock Module (TCM) and two Processing Modules (PMs). TCM receives the status data from the control system and triggers the laser. The data is read and digitised by the two PM units. All system components are centrally controlled via a WinCC and Control Server software interface installed on a dedicated computer. This software allows users to configure, monitor, and control all aspects of the hardware, ensuring seamless operation of the training station. The TCM communicates with the FLP node, which contains the Common Readout Unit (CRU). The CRU is responsible for data acquisition and processing via the GigaBit Transceiver (GBT) protocol. In the case of the training station, the LTU is connected to the FLP to provide clock signals, thereby simulating the internal ALICE clock. This is crucial for accurately reproducing the actual operating environment of the detector, such as switching the clock from the internal (FIT) to the external (ALICE - LTU) source. Since the training station contains the key FIT components and processes, trainees can familiarise themselves with the detector’s operations in a controlled environment. In particular, they can interact with the system just as they would during a live data collection run. (See Fig. 3 ) Figure 3: Components of the ALICE FIT coaching station. 2.2 Software The software component of the FIT Training Station is centred on the Control Server, a QT-based application running on a dedicated ”Node” computer. This system communicates with the FIT FEE via the IPbus protocol and provides extensive functionality for monitoring, managing, and controlling the detector subsystems. Additionally, all visualisation and integration with the central ALICE-DCS system is facilitated using WinCC O.A. 3.19 [ 5 ] , which is responsible for the overall operation of the system and launched on the same “Node” computer. Core Functions of the Control Server: 1. Monitoring and Diagnostics: Periodic polling of all connected FEE modules to monitor their state and detect errors, with detailed logging for diagnostics. 2. Error Handling: Verification and blocking of erroneous TCM and PMs register readings, with real-time error notifications for individual modules and the overall system. 3. Configuration Management: Display and management of TCM and PM settings, including trigger outputs, laser systems, attenuators, and detector channels. 4. DIM Integration: • Publication of DIM services for counter readings, trigger rates, and parameter settings. 5. Logging and Diagnostics: • Comprehensive event logging, including critical errors and diagnostic reports such as “BC sync lost in run” and “raw data FIFO overload.” • Separation of critical error logs into ControlServer.errorlog for efficient troubleshooting. 6. GUI Enhancements: • Intuitive display of system states and parameters, with input validation and tooltips for user-friendly operation. • Real-time visualisation of average signal registration times for each detector side, with quick correction options for temporal delays. Key Tasks Performed by WinCC O.A. 3.19: 1. Control of Hardware Components: (a) Wiener crates (via