Estimation of the Plant Controller Communication Time-Delay Considering PMSG-Based Wind Turbines

Pablo Marchi † \dagger , Pablo Gill Estevez ∗ * , Alejandro Otero † ⁣ ∗ \dagger* and Cecilia Galarza † ⁣ ∗ \dagger* · 2024

Read Estimation of the Plant Controller Communication Time-Delay Considering PMSG-Based Wind Turbines by Pablo Marchi † \dagger , Pablo Gill Estevez ∗ * , Alejandro Otero † ⁣ ∗ \dagger* and Cecilia Galarza † ⁣ ∗ \dagger* (2024) in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/arxiv-2412-01751.txt.

Description

Marchi and co-authors present a method to measure the control delay in wind power plants, in a 2024 engineering paper. A plant controller talks to each turbine's inverter over a communication link, and delays on that link can set the whole plant oscillating. Their method estimates the delay from phasor measurement data recorded during faults. It rests on dynamic state estimation against a math model of the turbine.

The team test the estimator across several fault scenarios for turbines with permanent magnet generators. The delay can be characterized well enough to guide the models used in grid studies. That gives transmission operators an online tool to pick realistic delay values. Better delay values mean more trustworthy stability studies for wind-heavy grids.

Catalog record

CREATORPablo Marchi † \dagger , Pablo Gill Estevez ∗ * , Alejandro Otero † ⁣ ∗ \dagger* and Cecilia Galarza † ⁣ ∗ \dagger*
YEAR2024
COLLECTIONPAPERS
FORMATTXT
FILE SIZE34 KB
VERSION1.0
LICENSEhttp://creativecommons.org/licenses/by/4.0/
RIGHTSCC BY
SOURCEarXiv

Source: https://arxiv.org/abs/2412-01751

Browse the full library · About the Tower of Babel