Installation And Operation Instructions For Custom Mark Iii
Unknown
Read Installation And Operation Instructions For Custom Mark Iii by Unknown in the Tower of Babel, a free online library of public-domain works preserved in clean, searchable text. No sign-up. The full text is served as a plain-text file at a predictable URL, where text is present: https://antarctic-labs.com/tower-of-babel/28166-installation-and-operation-instructions-for-custom-mark-iii.txt.
Introduction
Axeman-Anderson Company's instructions for the Custom Mark III CP Series oil-fired unit explain how to install and run a home heating boiler. The unit ships assembled, save for a small carton of parts: nipples, a tee, a relief valve, a boiler drain, and a thermostat. The manual stresses careful reading before work begins.
Steps cover checking cartons for transit damage, noting faults on the carrier's waybill, and calling for inspection before discarding packing. Later sections treat piping, controls, and care over years of service. The text is a plain industrial manual, useful for historians of home heating and for owners of old units.
Catalog record
| CREATOR | Unknown |
|---|---|
| COLLECTION | BOOKS |
| FORMAT | TXT |
| FILE SIZE | 33 KB |
| VERSION | 1.0 |
| LICENSE | Public Domain |
| RIGHTS | PUBLIC DOMAIN |
| SOURCE | Project Gutenberg |
Browse the full library · About the Tower of Babel
Full text
The opening of the work, from the library's hosted text:
Produced by Gerard Arthus, Diane Monico, and the Online Distributed Proofreading Team at http://www.pgdp.net INSTALLATION AND Operation Instructions FOR CUSTOM MARK III CP SERIES OIL FIRED UNIT MANUFACTURED BY AXEMAN-ANDERSON COMPANY 300 East Mountain Avenue South Williamsport, PA 17701 CPO2O--8410--5C INSTALLATION AND OPERATING INSTRUCTIONS CUSTOM MARK III CP SERIES OIL FIRED UNIT _GENERAL_ The Custom Mark III CP Series Oil Fired Unit is a high quality heating unit that will provide many years of comfortable and economical heat if properly installed and given proper care. It is _IMPORTANT_ therefore that these instructions should be followed carefully. _SHIPMENT_ The unit is completely assembled at the factory except for the following parts which are packed in a separate carton and strapped to the skids inside the shipping carton: 1 - 3/4" × Close Steel Nipple 1 - 3/4" × 3/4" × 1/2" Tee 1 - Fig. 105 Tridicator 1 - 3/4" No. 10-402-05 ASME Relief Valve 1 - 3/4" No. 600-19 Boiler Drain 1 - T87F-2055 Thermostat The jacket extension for 128CPO is shipped in separate carton. _DAMAGE IN TRANSIT_ Upon receipt of shipment of this material, inspect all cartons for external damage. If external damage is noted, open the carton and inspect for damage to equipment. Mark the number of cartons received in this condition on the delivering carrier's waybill, and request the services of their inspector. If, upon opening a carton, concealed damage is discovered, open the entire shipment and note all equipment so damaged. Contact the delivering carrier and request inspection of the damaged equipment. Do not destroy the carton. The inspector from the freight company will need this to determine reason for damage. Normally claims for any and all damages should be filed with the freight company within five working days after receipt of shipment. All materials are sold F.O.B. Factory. It is the responsibility of the consignee to file claim with the delivering carrier for material received in a damaged condition. _LOCATING UNIT_ _BEFORE REMOVING SHIPPING CARTON, LOCATE UNIT IN ITS FINAL POSITION_ The carton is plainly marked so as to indicate which is the outlet burner end of the unit which is also the end where the return and flue are located. Clearance should be provided in both the front and rear of the unit for cleaning. Where possible it is good practice to locate the unit so its sides are parallel to the chimney flue. In all instances locate unit as near chimney flue as possible in order to avoid use of a long flue pipe. _REMOVING CARTON_ Once the packaged unit is in its proper place, cut all around the carton on the scored line as shown on carton. The entire carton may then be lifted from the skids. If it is found necessary to move the unit a little more to place it in the exact location ready for piping, do so before removing skids. DO NOT PUSH AGAINST ANY PART OF JACKET OR OIL BURNER WHEN MOVING UNIT. TO MOVE UNIT, PUSH AGAINST _SKIDS, FLUE BOX OR SMOKE BOX_. PUSHING AGAINST JACKET WILL RESULT IN DAMAGE. _REMOVING SKIDS_ The skids are specially designed for easy removal. It is necessary, however, to follow these instructions carefully. A. After unit is in proper place, remove the two cross pieces from skids by pulling out all scaffolding (double headed) nails. B. By inserting pinch bar or 2" × 4" underneath the smoke box (rear of unit), tilt one side of unit just high enough to lift lugs out of holes in skid, then knock skid out from underneath unit. Then do the same thing on the other side of unit. _THE UNIT IS NOT BOLTED TO THE SKIDS._ The 3/4" lugs welded to the unit simply fit into the 3/4" holes in the skids. +----------------------------------------------+ | | | IMPORTANT | | | | DO NOT TILT UNIT BY PUSHING AGAINST JACKET | | | | IT IS NOT NECESSARY | | | | AND BY DOING SO THE JACKET WILL BE DAMAGED | | | +----------------------------------------------+ _LEVELING UNIT_ In case floor is uneven, unit may easily be made level by inserting shims under the 4 shipping lugs. These lugs also keep the jacket 1/2" off the floor, protecting it from wet floors and dampness. _PIPING AND WIRING_ Once the unit is in its proper location with the packing carton, skids and packing material removed, it is ready for piping and connection from Room Thermostat and 110 V. 60 Cy. A.C. Current. _CONTROL SYSTEM_ The controls furnished are for a one zone Forced Water System consisting of T87F Room Thermostat, L8124A-1007 Triple Acting Aquastat and Circulator Relay, C554A-1018 Cadmium Photocell, R8184G-1005 Burner Relay and V4046A-1009 Oil Valve. Description and complete wiring diagram will be found packed with each control. _SPECIAL CONTROL SYSTEMS_ For special control systems such as multiple installations, zone controlled, unit heater, radiant panel, etc., write to factory for wiring diagrams. _CHIMNEY AND BREECHING REQUIREMENTS_ The CP boiler should be connected to a vertical vent system that will prevent: (1) positive pressure in the flue, (2) backward flow of flue gas through the unit when the burner stops, and (3) condensation in the flue. Use double-walled or insulated pipe for sections of the flue in cold areas. All outside vents, except for short extensions, must be insulated to avoid condensation in the flue. Several types of prefabricated chimneys are available providing double-walled or insulated pipe, some with ceramic and others with metallic liners. While the unit is equipped with an induced draft fan, proper size vent must be provided to remove the gases of combustion. It is recommended that a 4" to 5" increaser be used for venting the 87CPO and 108CPO and a 4" to 6" increaser be used for the 128CPO. For abnormal runs (exceeding 10 ft.), consult factory. Vent and breeching must be gas tight by sealing with asbestos or thermo-setting pressure sensitive tape. _DRAFT REGULATOR_ It is recommended that a draft regulator be installed in chimney flue _just below the flue pipe opening_, if the unit is attached to an extremely high chimney; an unlined chimney; or a chimney which is constructed on the exterior of the house. _CONTROLS AND TRIM_ Controls are installed in place at the Factory. Attach thermo-altimeter in 1/2" tapping in top front of boiler. Install 3/4" × close nipple in 3/4" top connection with 3/4" × 3/4" × 1/2" Tee. 3/4" Tee opening for installation of the relief valve and 1/2" opening for expansion tank. _WIRING_ Controls are all in place and wired at the factory except connection to circulator. _REGULATING OIL PRESSURE_ Standard nozzles furnished with the burner will produce the stamped rated capacity when used with Commercial Standard No. 2 Fuel Oil, and operated with a pressure of 100 lbs. per square inch. The standard setting of the fuel unit is 100 lbs. Due to difference in tank elevations, the pressure should be adjusted at the time of start up. _FUEL LINES_ Care should be employed when attaching the oil lines to the fuel unit. Overtightening or twisting will twist the pump-motor mounting plate and put a stress on the motor bearings. _START UP PROCEDURE_ General: 1. Make certain that correct voltage has